they're waiting for the manufacture of a vast trove
of cor-ten steel for the bad-ass redesign . .
the upgrade will include sharp spikey rusted spires
20 of them of irregular height, for the crown . .
extensive exposed cor-ten trusswork & industrial
strength brasing . . as well as heavy vertical ribbing . .
the aggressively slender, asymmetrical steam-punk
tower will rise menacingly tall . . and radically
transform Gotham, as no other skyscraper in NY history
. . well, that's what ya wanna hear, dont cha ? . . I do .
__________________
artSpook
Reply With Quote
     
     
  #502  
Old Posted Jul 9, 2019, 7:59 AM
chris08876's Avatar
chris08876 chris08876 is offline
Lophophora williamsii
 
Join Date: Jul 2013
Location: New Jersey - Somerset County
Posts: 26,985
Latest updates via 45 Broad construction update source: For up to mid July.

WEEKS OF 7/1 + 7/8 + 7/15

This month we will begin mobilization for our foundation and work on excavating and removing soil from the site.
Reply With Quote
     
     
  #503  
Old Posted Jul 11, 2019, 1:38 AM
Duck From NY's Avatar
Duck From NY Duck From NY is offline
Registered User
 
Join Date: Dec 2011
Location: Staten Island, "New York City"
Posts: 810
Quote:
Originally Posted by artspook View Post
they're waiting for the manufacture of a vast trove
of cor-ten steel for the bad-ass redesign . .
the upgrade will include sharp spikey rusted spires
20 of them of irregular height, for the crown . .
extensive exposed cor-ten trusswork & industrial
strength brasing . . as well as heavy vertical ribbing . .
the aggressively slender, asymmetrical steam-punk
tower will rise menacingly tall . . and radically
transform Gotham, as no other skyscraper in NY history
. . well, that's what ya wanna hear, dont cha ? . . I do .
Are those supposed to be ellipses in your, uh, poems or whatever?
Reply With Quote
     
     
  #504  
Old Posted Jul 11, 2019, 6:27 AM
Guiltyspark's Avatar
Guiltyspark Guiltyspark is offline
Registered User
 
Join Date: Aug 2011
Location: Metro Detroit
Posts: 936
Quote:
Originally Posted by Duck From NY View Post
Are those supposed to be ellipses in your, uh, poems or whatever?
Reading and trying to decipher his autistic rants is half the reason I still come to these forums.
__________________
Ramses can suck it. This is my world, my age, and those ancient people are dead.
Reply With Quote
     
     
  #505  
Old Posted Jul 11, 2019, 6:39 PM
Crawford Crawford is online now
Registered User
 
Join Date: Nov 2003
Location: Brooklyn, NYC/Polanco, DF
Posts: 18,174
There are actual construction workers on-site this week. Finally.
Reply With Quote
     
     
  #506  
Old Posted Jul 11, 2019, 11:50 PM
chris08876's Avatar
chris08876 chris08876 is offline
Lophophora williamsii
 
Join Date: Jul 2013
Location: New Jersey - Somerset County
Posts: 26,985
Life has been discovered at the site. Some progress. One small step for man, one giant leap for 45 Broad.




Credit: rbrome
Reply With Quote
     
     
  #507  
Old Posted Jul 16, 2019, 9:20 PM
Crawford Crawford is online now
Registered User
 
Join Date: Nov 2003
Location: Brooklyn, NYC/Polanco, DF
Posts: 18,174
Interesting construction details from interview with Robert Gladstone, developer of 45 Broad:

What’s the status of the 45 Broad Street project?

It’s still in the foundation stage. We had several methods presented to us to do the foundation. The building sits on rock, but the rock is 45 feet down. We had ways that would have shaved six to nine months off the foundation process and $5, $6, $7 or $8 million off of it.

We chose two years ago to go in the direction of this substantial foundation. We have 470 vertical elements [concrete rods drilled into the ground that create a wall] on the bottom floor—which is 9,000 square feet. It’s something called secant piles. We’re grabbing rock at all these locations.

All the drilling and piling is now completed and now we’re starting on the actual pouring of the foundation. That will go on for four months and it will have taken us two years to do this and a lot more money then we wanted to spend. But the elevators will work perfectly because they will be sitting on solid ground.

https://commercialobserver.com/2019/...t-development/
Reply With Quote
     
     
  #508  
Old Posted Jul 16, 2019, 10:38 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 40,301
Quote:
We chose two years ago to go in the direction of this substantial foundation. We have 470 vertical elements [concrete rods drilled into the ground that create a wall] on the bottom floor—which is 9,000 square feet. It’s something called secant piles. We’re grabbing rock at all these locations.

All the drilling and piling is now completed and now we’re starting on the actual pouring of the foundation. That will go on for four months and it will have taken us two years to do this and a lot more money then we wanted to spend. But the elevators will work perfectly because they will be sitting on solid ground.

Great. I would like some more detailed renderings released for this one also.
__________________
NEW YORK. World's capital.

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #509  
Old Posted Jul 17, 2019, 1:12 AM
matt19215 matt19215 is offline
Registered User
 
Join Date: Apr 2019
Posts: 49
It lives!
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Supertall Construction
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 5:18 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2019, vBulletin Solutions, Inc.