Widening an existing road to add a lane for transit (bus or rail) is a Schedule C activity under the Municipal Class EA (i.e. the same as for a new transitway).

However, "localised operational improvements at specific locations", including "stopping lanes, access lanes, turning lanes, signal priority, queue jump lanes", amongst others, is a pre-approved Schedule A+ activity ('A+' signifying you have to tell everyone about it), so long as it is has no or minimal adverse environmental effects, at which point it would be a Schedule B activity.

So they can probably do what they need to do at Laurentian on the north side of Baseline from the Scouts Shop to beyond Clyde by way of the above. However, it looks like the bus lane extends east of the Scouts, possibly to the former IBM buildings at Merivale opposite Loblaws. They can use the same excuse as above to get from Merivale to Loblaws where there's a long right turn lane into the former IBM/current FedGov buildings - leaving them only the segment in front of the Scouts' buildings to have to come up with an 'A+' rationale for. Since it looks like they're going to consolidate the entrance to the Scouts and the Walmart into one (and remove the signalized pedestrian crossing in front of the former high school), they may just have enough of a rationale to get away with it.

One thing that gets me is what happens to the bus stops... since it looks like there will be separate right-turn lanes for much of the length of the project.

And of course the trees will most likely get the chop, be it directly or indirectly from having their roots cut up.


Btw, the City's list of required infrastructure projects in furtherance of the TMP includes the addition of bus lanes on Baseline from Richmond Road all the way to Heron and beyond to Walkley Rd:

http://ottawa.ca/city_hall/master_pl...tml#P295_13950

Those still require EAs to be done.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #82  
Old Posted May 29, 2010, 5:03 AM
RTWAP's Avatar
RTWAP RTWAP is offline
Registered User
 
Join Date: Oct 2009
Posts: 528
Quote:
Originally Posted by Richard Eade View Post
Recall that they added a short length of Bus-only lane along the north side of Baseline where the bus turns west from the new intersection at Constellation.
They have also converted the outside WB lane between the two ends of Centrepointe to bus-only. And they have removed the gravel fill and precast curbs that eliminated the curb-side lane immediately west of Woodroffe.

My guess is that they're planning to start the bus-only lane just east of Woodroffe as an interim measure.

/bitching on

But they certainly don't seem to know what they're doing. They widened the medians when they created the intersection at Constellation, forcing the two through lanes to jog all over the place. It was a nightmare in winter when people unfamiliar with the hidden lane markings are inadvertently wandering back and forth between lanes.

Further evidence of incompetence would be the fact they erased and repainted the new lane markings in a different configuration about a month after they opened the Constellation intersection.

That whole project seems really dismal. The sewers grates on Constellation are too high, so they removed the asphalt around them in preparation for fixing them, and then used pylons to create 5 foot wide barriers at each cover. They kept the on-street parking though (perhaps the project team works out of city building nearby) so for over a month the road was a jumbled nightmare that was really only one lane wide, but lacked any signs. Just this week they banned all stopping along the east side of Constellation so you can drive northbound without occupying the only southbound lane.

/bitching off
Reply With Quote
     
     
  #83  
Old Posted May 29, 2010, 1:52 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 1,946
At the risk of drawing this thread away from Laurentian; the temporary curbs west of Woodroffe are being removed now and permanent changes are being made to install the 'SMART CHANNEL' (or high angle channelized right turn lane) between south-bound Woodroffe and west-bound Baseline. [I'm in favour of starting a new thread on the ridiculousness of these so-called 'SMART CHANNELS', if anyone else is interested.]

I don't think there is any need to have a bus lane between Woodroffe and Constellation since there are no buses running along Baseline between Navaho and Constellation.

As for Constellation, it had only been sealed last fall, and needed another layer of asphalt, which is being added now. Soon all will be beautiful on Constellation. The rest of the design, as you point out, indicates unfathomable thinking on the part of City Staff.
Reply With Quote
     
     
  #84  
Old Posted May 29, 2010, 2:54 PM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
Quote:
Originally Posted by Richard Eade View Post
At the risk of drawing this thread away from Laurentian; the temporary curbs west of Woodroffe are being removed now and permanent changes are being made to install the 'SMART CHANNEL' (or high angle channelized right turn lane) between south-bound Woodroffe and west-bound Baseline. [I'm in favour of starting a new thread on the ridiculousness of these so-called 'SMART CHANNELS', if anyone else is interested.]
Done, more-or-less:

http://forum.skyscraperpage.com/showthread.php?t=182104

Quote:
I don't think there is any need to have a bus lane between Woodroffe and Constellation since there are no buses running along Baseline between Navaho and Constellation.

As for Constellation, it had only been sealed last fall, and needed another layer of asphalt, which is being added now. Soon all will be beautiful on Constellation. The rest of the design, as you point out, indicates unfathomable thinking on the part of City Staff.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #85  
Old Posted Nov 11, 2010, 6:37 PM
blackjagger's Avatar
blackjagger blackjagger is offline
Registered User
 
Join Date: Jun 2009
Location: Ottawa, Ontario
Posts: 287
http://app01.ottawa.ca/postingplans/...appId=__77MR33

I believe this is an office proposal for the North West corner of the site.

Cheers,
Josh
Reply With Quote
     
     
  #86  
Old Posted Nov 11, 2010, 9:37 PM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,229
Quote:
Originally Posted by blackjagger View Post
http://app01.ottawa.ca/postingplans/...appId=__77MR33

I believe this is an office proposal for the North West corner of the site.

Cheers,
Josh
That seems like a big change from the original site plan if I'm picturing it right. It seems this is what they're proposing:

http://picasaweb.google.com/lh/photo...eat=directlink
Reply With Quote
     
     
  #87  
Old Posted Nov 12, 2010, 12:17 AM
Ottawan Ottawan is offline
Citizen-at-large
 
Join Date: Aug 2009
Location: Expat (in Toronto)
Posts: 738


I think you're right, and I don't like the change at all. Defining the street by fronting the buildings onto it and creating a uniform setback should be essential to this type of redevelopment, and they shouldn't be allowed to deviate from that plan.
Reply With Quote
     
     
  #88  
Old Posted Nov 18, 2010, 9:08 PM
DEVPLAN DEVPLAN is offline
Registered User
 
Join Date: Jun 2008
Location: Ottawa
Posts: 10
After viewing the elevations it looks like the main entrance to the office building is from Clyde Ave which the zoning by-law requires.

Yes we all know people of Ottawa don't like change but if a deviation from the original concept plan still meets the intent of the site specific zoning then why not? I think the original site plan application was just for the three entrances, Wal-Mart and the two buildings in front.

Looks like Loblaws is renovating their store across the street to try and give Wal-Mart a run for their money.
Reply With Quote
     
     
  #89  
Old Posted Nov 23, 2010, 3:03 PM
reidjr reidjr is offline
Registered User
 
Join Date: Dec 2009
Posts: 1,237
Does anyone know will the walmart be a super centre?
Reply With Quote
     
     
  #90  
Old Posted Nov 23, 2010, 5:51 PM
Luker Luker is online now
Registered User
 
Join Date: May 2008
Posts: 362
You'd have to think so by the size of the development and that is their new trend. I dont have numbers or confirmation though.
Reply With Quote
     
     
  #91  
Old Posted Feb 5, 2011, 1:28 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,243
Walmart opened on Jan 28th..
Reply With Quote
     
     
  #92  
Old Posted Apr 19, 2012, 12:13 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,243
At Laurentian Place, baby steps towards pedestrian-friendliness
BY DAVID REEVELY, THE OTTAWA CITIZEN APRIL 16, 2012



OTTAWA — Part of the former Laurentian High School on the northeast corner of Baseline Road and Clyde Avenue is still a construction zone with trailers and piles of gravel. Part of it is a Walmart that’s open for business. And part of it is an experiment: two buildings with 10 stores between them that are supposed to work both as strip-mall plazas with plenty of parking, and as storefronts attracting pedestrian traffic on a busy road.

Laurentian Place, as it’s now called, is a model for what the city calls an “arterial main street.” Is it a success? Sort of.

Read more: http://www.ottawacitizen.com/homes/L...#ixzz1sRKDBQo0
Reply With Quote
     
     
  #93  
Old Posted Apr 19, 2012, 12:17 AM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Quote:
Originally Posted by waterloowarrior View Post
At Laurentian Place, baby steps towards pedestrian-friendliness
BY DAVID REEVELY, THE OTTAWA CITIZEN APRIL 16, 2012



OTTAWA — Part of the former Laurentian High School on the northeast corner of Baseline Road and Clyde Avenue is still a construction zone with trailers and piles of gravel. Part of it is a Walmart that’s open for business. And part of it is an experiment: two buildings with 10 stores between them that are supposed to work both as strip-mall plazas with plenty of parking, and as storefronts attracting pedestrian traffic on a busy road.

Laurentian Place, as it’s now called, is a model for what the city calls an “arterial main street.” Is it a success? Sort of.

Read more: http://www.ottawacitizen.com/homes/L...#ixzz1sRKDBQo0
Baseline was never designed as a commercial corridor, so indeed that was experimental. Most of Baseline is medium to high-density residential with some reverse frontage.
Reply With Quote
     
     
  #94  
Old Posted May 2, 2012, 1:17 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,243
Quote:
Originally Posted by MountainView View Post
The Office development at Baseline and Clyde has finally started to begin. This is to the immediate west of the new walmart supercentre. I drive by this area quite often and today they were putting in the base for the crane and the pit is probably 10-15m below ground. It will have a covered parkade and I believe the sign out front of the development lists the building at 6 floors, although the pictures make it seem like 5. 19000sq/ft Class A office space, LEED certified is their goal. I'm not sure if this has ever been discussed, so in case it hasn't here are some pictures I found for the development.



Stantec announced as the primary tenant

http://www.obj.ca/Real%20Estate/Cons...-development/1
Reply With Quote
     
     
  #95  
Old Posted May 2, 2012, 2:53 AM
Uhuniau Uhuniau is online now
Registered User
 
Join Date: Jan 2010
Posts: 7,979
Quote:
Originally Posted by waterloowarrior View Post
Stantec announced as the primary tenant

http://www.obj.ca/Real%20Estate/Cons...-development/1
But the sign says Sign.
Reply With Quote
     
     
  #96  
Old Posted May 2, 2012, 2:54 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
Quote:
Originally Posted by Uhuniau View Post
But the sign says Sign.
We've been sold a bill of goods! Pitchforks and torches!
Reply With Quote
     
     
  #97  
Old Posted Feb 28, 2013, 1:51 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,243
here's an aerial from SmartCentre's site

http://www.smartcentres.com/locations/ottawa-sw
Reply With Quote
     
     
  #98  
Old Posted Feb 28, 2013, 2:14 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Ottawa
Posts: 12,210
Quote:
Originally Posted by waterloowarrior View Post
here's an aerial from SmartCentre's site

http://www.smartcentres.com/locations/ottawa-sw
How stunningly unimpressive.
Reply With Quote
     
     
  #99  
Old Posted Feb 28, 2013, 4:07 PM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
This picture would be great supporting evidence for the counterargument "you're not short of land, just short of creativity".


If they had done what the Canadian Tire on Carling did, then the Walmart would extend out over the frontage buildings along Baseline and above the surface parking lot. Where the Walmart now is would then still be available for other development.

And what Canadian Tire did is not even all that creative anyway but it's still vastly more so than this.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #100  
Old Posted Feb 28, 2013, 4:09 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,102
I love what Canadian Tire did. It makes so much sense in our climate and is a much better use of space than any other large-format stores in town.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & City of Ottawa
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 4:28 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.