HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    The Bond on Brickell in the SkyscraperPage Database

Building Data Page   • Miami Skyscraper Diagram

Map Location

 

 
Thread Tools Display Modes
     
     
     
     
  #1  
Old Posted Mar 17, 2014, 6:36 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,840
MIAMI | The Bond on Brickell | 491ft | 43 fl



Groundbreaking: January 2014




==============================
http://www.exmiami.org/index.php/the...1-ft-approved/
http://i.imgur.com/OWFUubJ.jpg
     
     
  #2  
Old Posted Apr 12, 2014, 1:07 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,840
More renderings:





Quote:
DESCRIPTION
The Bond at Brickell is the first new condominium to be developed on Brickell Avenue since Miami’s last real estate cycle. The 44-story luxury tower will be home to 323 residences that will attract residents from throughout
the Americas and around the world. Inspired by the best of classic British elegance and appointed with modern day amenities, The Bond introduces a new standard of luxury living to the Brickell Financial District.


LOCATION
Located at 1080 Brickell Avenue in the heart of one of Miami’s most pedestrian-friendly neighborhoods, The
Bond is situated in the heart of downtown Miami’s Brickell Financial District. Residents and visitors will access
The Bond via entrances on Brickell Avenue and South Miami Avenue. Public transportation is just steps away and
world-class shopping, dining, entertainment and cultural destinations such as the Shops at Mary Brickell Village,
American Airlines Area and the Adrienne Arsht Center for the Performing Arts are within reach.


RESIDENCES
The Bond is comprised of 44 floors and 323 luxury residences ranging from studios, 1-, 2-, and 3-bedroom units,
to exclusive lofts and penthouses.


PARKING
595 parking spaces


RETAIL
Approximately 5,000 square feet of retail space on the 2nd floor



TIMETABLE
Completion slated for summer 2015
====================================
http://thebondatbrickellfl.com/fact_sheet
     
     
  #3  
Old Posted Jun 4, 2014, 8:05 PM
dave8721 dave8721 is offline
Registered User
 
Join Date: Jul 2005
Location: Miami
Posts: 4,044
Construction continues:
(from Cubreta @ ssc)
     
     
  #4  
Old Posted Jun 5, 2014, 12:17 PM
bobdreamz's Avatar
bobdreamz bobdreamz is offline
Registered User
 
Join Date: Mar 2002
Location: Miami/Orlando, FL.
Posts: 8,130
Another aerial:



Pic by Cubereta
__________________
Miami : 62 Skyscrapers over 500+ Ft.|150+ Meters | 18 Under Construction.
     
     
  #5  
Old Posted Jun 5, 2014, 4:12 PM
shakman's Avatar
shakman shakman is offline
Chairman
 
Join Date: Jun 2002
Location: PRMD - People's Republic of Maryland
Posts: 2,672
Someone should change the heading to from "DEMO" to "U/C".
__________________
"I measure the value of life not by how much I have, instead by what I have done.

-sb
     
     
  #6  
Old Posted Jun 10, 2014, 5:53 PM
dave8721 dave8721 is offline
Registered User
 
Join Date: Jul 2005
Location: Miami
Posts: 4,044
Images from Cubereta @ ssc:



     
     
  #7  
Old Posted Jun 16, 2014, 2:01 PM
dave8721 dave8721 is offline
Registered User
 
Join Date: Jul 2005
Location: Miami
Posts: 4,044
Foundation poured and ready to go.

pics from Cubereta @ ssc


     
     
  #8  
Old Posted Jul 3, 2014, 2:56 PM
dave8721 dave8721 is offline
Registered User
 
Join Date: Jul 2005
Location: Miami
Posts: 4,044
Cubreta @ ssc got some pics of the tower crane going up yesterday:


     
     
  #9  
Old Posted Dec 20, 2014, 9:22 PM
bobdreamz's Avatar
bobdreamz bobdreamz is offline
Registered User
 
Join Date: Mar 2002
Location: Miami/Orlando, FL.
Posts: 8,130
^ pretty cool shot from the Metromover.
__________________
Miami : 62 Skyscrapers over 500+ Ft.|150+ Meters | 18 Under Construction.
     
     
  #10  
Old Posted Jan 16, 2015, 7:46 PM
dave8721 dave8721 is offline
Registered User
 
Join Date: Jul 2005
Location: Miami
Posts: 4,044
Can we move this status to Under Construction now? Lol.

Pics from QuantumX at SSC
     
     
  #11  
Old Posted Jan 30, 2015, 4:25 PM
dave8721 dave8721 is offline
Registered User
 
Join Date: Jul 2005
Location: Miami
Posts: 4,044
DSC_0692 by QuantumX, on Flickr
     
     
  #12  
Old Posted Feb 21, 2015, 3:45 AM
dave8721 dave8721 is offline
Registered User
 
Join Date: Jul 2005
Location: Miami
Posts: 4,044
image from marcvader @ ssc
     
     
  #13  
Old Posted Mar 12, 2015, 7:01 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,840
     
     
  #14  
Old Posted Jan 20, 2016, 7:41 PM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,383
Update from a week ago: 1/2016
__________________
HAIF
     
     
  #15  
Old Posted Jan 20, 2016, 8:14 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,840
Quote:
Originally Posted by Urbannizer View Post
Update from a week ago: 1/2016
Thanks Urbanizer for the Miami updates. Been doing some winter cleaning I see.
     
     
  #16  
Old Posted Feb 20, 2016, 3:37 AM
dave8721 dave8721 is offline
Registered User
 
Join Date: Jul 2005
Location: Miami
Posts: 4,044
Still finishing off the windows and exterior. Glass balcony railings almost complete:
https://www.flickr.com/photos/southb...s/25095875565/


https://www.flickr.com/photos/southb...rs/25069487536
     
     
  #17  
Old Posted Mar 4, 2016, 7:29 PM
tateyb's Avatar
tateyb tateyb is offline
Registered User
 
Join Date: Aug 2015
Location: t dot
Posts: 194
Photos Capture Progress of 44-Storey Bond at Brickell

Quote:
Phillip Pessar recently paid a visit to the site and snapped some photos of the building, which has reached its final height. The blue-tinted glazing now applied to most of the balconies will need a good wash from all the construction grime that has accumulated on the windows. A clean finish should be expected by the time occupants move in and enjoy the expansive amenities package some time this year.

     
     
  #18  
Old Posted Oct 27, 2016, 1:29 PM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,383
__________________
HAIF
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 3:57 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.