  #2421  
Old Posted Mar 11, 2017, 6:29 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,360
I don't think closing Metrotown station would be possible.
Anyway the Centre Stationhouse construction is almost completed. Hopefully it will be opened in 1 to 2 months.
Reply With Quote
     
     
  #2422  
Old Posted Mar 11, 2017, 6:58 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,360
Reply With Quote
     
     
  #2423  
Old Posted Mar 11, 2017, 8:09 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,279
Quote:
Originally Posted by Waders View Post
why are there so many fare-gates in this station, yet so few at the busiest stations... including Canada-Line.
Reply With Quote
     
     
  #2424  
Old Posted Mar 11, 2017, 10:01 AM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
Some more renders that I found... direct from the architect's website:











mcfarlane biggar architects + designers
http://www.officemb.ca/

Quote:
Originally Posted by VancouverOfTheFuture View Post
why are there so many fare-gates in this station, yet so few at the busiest stations... including Canada Line.
It's hard to compare between retrofitting older stations and building anew...

The Canada Line stations were retrofitted with fare-gates as part of a multi-station compatibility upgrade scheme. The scope of that particular project was just to add fare-gates as quickly and cheaply as possible given the budget, forecasts, specs, and timelines that they had at the time.... There was some work done to expand various Expo Line station enclosures to make them all fit indoors, but anything outside of that narrow scope (e.g. future-proofing) was basically not considered.

Perhaps in a decade or two, we'll see the station upgrades move on towards the Millennium and Canada Lines to fix the bottlenecks that were induced by the initial round of fare-gates...

Last edited by Millennium2002; Mar 11, 2017 at 10:45 AM.
Reply With Quote
     
     
  #2425  
Old Posted Mar 11, 2017, 10:49 AM
Whalleyboy's Avatar
Whalleyboy Whalleyboy is offline
Registered User
 
Join Date: Jul 2008
Location: Surrey
Posts: 2,014
Why are they using canada line trains in the photos? lol
Reply With Quote
     
     
  #2426  
Old Posted Mar 11, 2017, 1:01 PM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,398
Quote:
Originally Posted by dpogue View Post
Buzzer blog post about the Commercial pedestrian walkway renovations.

Concept art from the post:


I'm really hoping that it turns out matching that design. I love the slight callback to the Expo stations' hoop truss design in the beams across the ceiling.

Quote:
Originally Posted by officedweller View Post
Commercial - Broadway Station -

Pics by me today:
(No visible changes since McMinsen's Nov 30 shots - maybe some more scaffolding below).

The steel substructure here (diagonal beams) must be for the escalator machinery (for the escalator from above).
Looks like the escalator will be set on a diagonal (see pic above), which also explains the diagonal beam in the corner of the bridge.



Not much change since officedweller's post from December 30th. The glass walls of the old bridge have been boarded up.



March 10 '17, my pics






Reply With Quote
     
     
  #2427  
Old Posted Mar 12, 2017, 5:54 AM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 863
Quote:
Originally Posted by Waders View Post
Are they actually going to be ripping up and re-doing the faregates at that station or is that just some wrong render.
Reply With Quote
     
     
  #2428  
Old Posted Mar 12, 2017, 5:58 AM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 863
So what's gonna happen when LRT comes online? Are the stations going to integrated like they are at Commercial Broadway? Seems kind of silly to be doing this now when LRT hasn't been finalized.
Reply With Quote
     
     
  #2429  
Old Posted Mar 12, 2017, 6:10 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 9,577
Quote:
Originally Posted by flipper316 View Post
So what's gonna happen when LRT comes online? Are the stations going to integrated like they are at Commercial Broadway? Seems kind of silly to be doing this now when LRT hasn't been finalized.
Wouldn't LRT be running down the middle of the street making whatever station improvements completely independent?
Reply With Quote
     
     
  #2430  
Old Posted Mar 12, 2017, 6:33 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,360
Quote:
Originally Posted by flipper316 View Post
Are they actually going to be ripping up and re-doing the faregates at that station or is that just some wrong render.
The faregate will be redone.
Reply With Quote
     
     
  #2431  
Old Posted Mar 12, 2017, 8:21 AM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
Quote:
Originally Posted by flipper316 View Post
Are they actually going to be ripping up and re-doing the faregates at that station or is that just some wrong render.
Quote:
Originally Posted by Waders View Post
The faregate will be redone.
This is a new north side entrance... nothing will be ripped out from the existing south side entrances... or at least I hope...

There could be a phase two of this that involves rebuilding the south side to align with the new street grid, but that will most likely happen down the road in a few years or more.
Reply With Quote
     
     
  #2432  
Old Posted Mar 12, 2017, 8:59 AM
Whalleyboy's Avatar
Whalleyboy Whalleyboy is offline
Registered User
 
Join Date: Jul 2008
Location: Surrey
Posts: 2,014
Quote:
Originally Posted by Millennium2002 View Post
This is a new north side entrance... nothing will be ripped out from the existing south side entrances... or at least I hope...

There could be a phase two of this that involves rebuilding the south side to align with the new street grid, but that will most likely happen down the road in a few years or more.
That exactly what the plan is. This side will be done first to line up with 103 ave which is the new road right along the city plaza which will go right thru once 3 civic plaza is done. This road will also be the new bus pick up area in place of the bus loop. After this one is done it is likely the other side will be torn down and be rebuilt to line up with the new 102A ave which will act as the bus drop off route.
Reply With Quote
     
     
  #2433  
Old Posted Mar 12, 2017, 12:01 PM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
Quote:
Originally Posted by Whalleyboy View Post
That exactly what the plan is. This side will be done first to line up with 103 ave which is the new road right along the city plaza which will go right thru once 3 civic plaza is done. This road will also be the new bus pick up area in place of the bus loop. After this one is done it is likely the other side will be torn down and be rebuilt to line up with the new 102A ave which will act as the bus drop off route.
Right... but the others seem to think this will happen immediately... which according to the renders is incorrect.
Reply With Quote
     
     
  #2434  
Old Posted Mar 12, 2017, 9:50 PM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,133
Quote:
Originally Posted by jollyburger View Post
Wouldn't LRT be running down the middle of the street making whatever station improvements completely independent?
Just wait until they have to triple the transit police force just to ticket jaywalkers.
Reply With Quote
     
     
  #2435  
Old Posted Mar 13, 2017, 3:38 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 39,147
will the 3rd platform at broadway have street access/connection on the south side or is it just going to be for people transferring to the m-line?

I was talking with my friend the other day he had no idea what was going on and wondered why the station was all boarded up for so long.
__________________
belowitall
Reply With Quote
     
     
  #2436  
Old Posted Mar 13, 2017, 4:26 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Location: Vancouver
Posts: 2,681
Quote:
Originally Posted by SpongeG View Post
will the 3rd platform at broadway have street access/connection on the south side or is it just going to be for people transferring to the m-line?
It will have access to the original south part of the station.
Reply With Quote
     
     
  #2437  
Old Posted Mar 13, 2017, 4:29 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 39,147
ok thanks.
__________________
belowitall
Reply With Quote
     
     
  #2438  
Old Posted Mar 13, 2017, 5:05 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 9,577
Quote:
Originally Posted by Kisai View Post
Just wait until they have to triple the transit police force just to ticket jaywalkers.
Just let a few of them get run over and people will use common sense.
Reply With Quote
     
     
  #2439  
Old Posted Mar 13, 2017, 7:25 PM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 1,790
Quote:
Originally Posted by Whalleyboy View Post
Why are they using canada line trains in the photos? lol
Didn't you hear?
Adam and RailForTheValley successfully lobbied to convert the entire SkyTrain system to the Rotem technology as Bombardier's design is old, expensive and proprietary. They tried for an LRT conversion but ran into regional opposition in everywhere except Surrey.
They also persuaded the whole conversion to be paid for by annual fare revenue. The new multi-zone $6, $10 and $15 rates go into effect on September 1.
Reply With Quote
     
     
  #2440  
Old Posted Mar 14, 2017, 6:35 AM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,133
Quote:
Originally Posted by MIPS View Post
Didn't you hear?
Adam and RailForTheValley successfully lobbied to convert the entire SkyTrain system to the Rotem technology as Bombardier's design is old, expensive and proprietary. They tried for an LRT conversion but ran into regional opposition in everywhere except Surrey.
They also persuaded the whole conversion to be paid for by annual fare revenue. The new multi-zone $6, $10 and $15 rates go into effect on September 1.
Hahaa...

The only problem with that remark is that RFTV/Malcom hates everything but the Interurban. Their modus operendi is getting a slow train that nobody will commute on so they will have it for themselves.

Anyway my predictions for Surrey, assuming no last minute technology change post-election is that the costs for the LRT will far outstrip the cost of extending the Skytrain by 20-50%, and hopefully that ends all future LRT boondoggle projects.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:38 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.