Is getting such permits a year+ in advance normal course of action? Or is it their way of saying, "look things are progressing"
|
I think these permits are much easier to get versus a foundation only permit. The foundation permit makes it necessary for the building design to be finalized to such a degree that building assemblies (walls, floors, roof, height, dimensions) are known.
Essentially, the architect has to have completed their design.
I don't we are at that point yet, but you would have to assume construction drawings are well underway.