Quote:
Originally Posted by Stormer
They did not have a separate timeline for Main lanes from GTH to TCH, but yes. Will the Hill Ave and Rotary/Dewdney interchanges be fully open or are their part that will wait.
|
I believe Hill will remain open, and the loop NB-WB and ramp EB-SB at Rotary will remain open. Dewdney will be open for through traffic without entry onto the Bypass. I expect highway 6 will be open 4 lanes. And that 9th North will be open to through traffic with no access to bypass.
The wild cards are for me:
Highway 33 to TCH being open, along with highway 6 overpass. I think it possible that the the EB-NB ramp at Pinky and the TCH could be open, but doubt that NB-WB will be yet. So some detour there (either up to hill and turn around or off at 6 north to Ring Road and out) either way would get trucks off Victoria Ave and onto freeway roads.
Excited to see what November 1st brings for travel.