The other big mat pour is happening now.
Reply With Quote
     
     
  #2162  
Old Posted Mar 1, 2017, 3:33 PM
KWILLSKYLINE's Avatar
KWILLSKYLINE KWILLSKYLINE is offline
Registered User
 
Join Date: Aug 2016
Location: Chicago
Posts: 625
Quote:
Originally Posted by rlw777 View Post
The other big mat pour is happening now.
Yup. Sure is. Too bad the web cam is foggy.
Reply With Quote
     
     
  #2163  
Old Posted Mar 1, 2017, 4:56 PM
coldru coldru is offline
Registered User
 
Join Date: Feb 2017
Posts: 12
Quote:
Originally Posted by KWILLSKYLINE View Post
Yup. Sure is. Too bad the web cam is foggy.
Rumor has it that their might be a live feed on site soon
Reply With Quote
     
     
  #2164  
Old Posted Mar 1, 2017, 6:32 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 14,989
March 01
Stairway to haven


Embed plates - how you weld to concrete.


Load bearing shaft




Pouring it on (in)


smooth operators
__________________
Harry C - Urbanize Chicago- My Flickr stream HRC_OakPark
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
Reply With Quote
     
     
  #2165  
Old Posted Mar 1, 2017, 11:56 PM
KWILLSKYLINE's Avatar
KWILLSKYLINE KWILLSKYLINE is offline
Registered User
 
Join Date: Aug 2016
Location: Chicago
Posts: 625
Thanks for making it over there Harry. Good shots!
Reply With Quote
     
     
  #2166  
Old Posted Mar 2, 2017, 1:32 PM
kayosthery kayosthery is offline
Registered User
 
Join Date: Oct 2005
Posts: 301
Quote:
Originally Posted by harryc View Post
March 01

Embed plates - how you weld to concrete.

Harry, these are stud rails, not embed plates. Similar look, different function. These strengthen the area around the column, nothing will be welded to these. If you look closely, they're sitting on plastic slab spacers. The bottom strip of steel will be covered with concrete.

https://www.google.com/search?q=shea...rete+columns&*
__________________
Paper is fine, nerf Rock. Signed - Scissors.
Reply With Quote
     
     
  #2167  
Old Posted Mar 2, 2017, 2:39 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 14,989
Quote:
Originally Posted by kayosthery View Post
Harry, these are stud rails, not embed plates. Similar look, different function. These strengthen the area around the column, nothing will be welded to these. If you look closely, they're sitting on plastic slab spacers. The bottom strip of steel will be covered with concrete.

https://www.google.com/search?q=shea...rete+columns&*
Thank you.
__________________
Harry C - Urbanize Chicago- My Flickr stream HRC_OakPark
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
Reply With Quote
     
     
  #2168  
Old Posted Mar 2, 2017, 5:24 PM
rlw777 rlw777 is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,780
This site is just nonstop concrete pouring right now. Whoever is handling the logistics for this thing is knocking it out of the park. In one week they have poured

Feb 24th: east end of the site
Feb 27th: half of upper wacker dr.
March 1st: Huge 2nd mat pour
March 2nd: start of 1st floor around western core.
Reply With Quote
     
     
  #2169  
Old Posted Mar 2, 2017, 8:55 PM
HomrQT's Avatar
HomrQT HomrQT is offline
All-American City Boy
 
Join Date: Dec 2009
Location: Hinsdale / Uptown, Chicago
Posts: 1,939
Quote:
Originally Posted by rlw777 View Post
This site is just nonstop concrete pouring right now. Whoever is handling the logistics for this thing is knocking it out of the park. In one week they have poured

Feb 24th: east end of the site
Feb 27th: half of upper wacker dr.
March 1st: Huge 2nd mat pour
March 2nd: start of 1st floor around western core.
Anyone have easy access to a number for the volume of cement that will poured in total for these slabs?
__________________
1. 9 DeKalb Ave - Brooklyn, NYC - SHoP Architects - Photo
2. American Radiator Building - New York City - Hood, Godley, and Fouilhoux - Photo
3. One Chicago Square - Chicago - HPA and Goettsch Partners - Photo
4. Chicago Board of Trade - Chicago - Holabird & Root - Photo
5. Cathedral of Learning - Pittsburgh - Charles Klauder - Photo
Reply With Quote
     
     
  #2170  
Old Posted Mar 3, 2017, 1:30 AM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,768
Quote:
Originally Posted by rlw777 View Post
This site is just nonstop concrete pouring right now. Whoever is handling the logistics for this thing is knocking it out of the park. In one week they have poured

Feb 24th: east end of the site
Feb 27th: half of upper wacker dr.
March 1st: Huge 2nd mat pour
March 2nd: start of 1st floor around western core.
I agree. This is moving along smoothly. Too smoothly!

It's always good when projects commence with finesse and elegance. Makes the whole construction process from a documentation aspect seem like nice thriller, with never ending excitement, and limited commercial breaks (delays).
Reply With Quote
     
     
  #2171  
Old Posted Mar 3, 2017, 3:02 AM
KWILLSKYLINE's Avatar
KWILLSKYLINE KWILLSKYLINE is offline
Registered User
 
Join Date: Aug 2016
Location: Chicago
Posts: 625
So does the city chip in for the Wacker extension since its city property and improvement or is it entirely responsibity of Vista.
Reply With Quote
     
     
  #2172  
Old Posted Mar 3, 2017, 5:02 AM
BVictor1's Avatar
BVictor1 BVictor1 is online now
Registered User
 
Join Date: Sep 2002
Location: Chicago
Posts: 10,412
Wanda Vista developers see high-end demand; $8.6M penthouse under contract

http://www.chicagotribune.com/busine...302-story.html

Wanda Vista developers see high-end demand; $8.6M penthouse under contract

Gail Marks JarvisContact Reporter
Chicago Tribune

March 2, 2017

Quote:
As the 94-story, ultra high-end Wanda Vista Tower hotel and condominium complex rises from its massive foundation near Chicago's lakeshore, the developer says about a third of the residential units are under contract with buyers.

That includes six of the building's 21 penthouses priced in the $8 million to $10 million range, said Sean Linnane, executive vice president of Magellan Development Group, which is developing the building along with China's Dalian Wanda Group.

Urban Real Estate recently put a 5,734-square foot, full-floor penthouse under contract for $8.6 million.

That 75th-floor penthouse, like the others in the tower, occupies a full floor, and offers a panoramic 360-degree view of the city.

Quote:
Linnane said the building is slightly ahead of where the developer expected it to be in terms of the number of units under contract, and will likely secure a construction loan in the next 45 to 60 days.
__________________
titanic1

Last edited by BVictor1; Mar 3, 2017 at 5:26 AM.
Reply With Quote
     
     
  #2173  
Old Posted Mar 3, 2017, 5:02 AM
SolarWind's Avatar
SolarWind SolarWind is offline
Chicago
 
Join Date: Jun 2006
Posts: 5,476
March 2, 2017





























^ Glazing samples? Pictures were taken with my cell phone, so I wasn't able to zoom in very well.
Reply With Quote
     
     
  #2174  
Old Posted Mar 3, 2017, 1:06 PM
Skyguy_7 Skyguy_7 is offline
BANNED
 
Join Date: Dec 2012
Location: Chicago
Posts: 2,657
^Definitely. Phenomenal update, by the way, Solar! Way to capture the trailers. I hadn't given it a thought, but a project of this size is going to have what looks to be a tiny village of PMs. Where were the trailers set up for Trump Tower?
Reply With Quote
     
     
  #2175  
Old Posted Mar 3, 2017, 2:20 PM
710cl 710cl is offline
Registered User
 
Join Date: Feb 2013
Posts: 25
We're being spoiled with the excellent and continued documentation of this project.
Reply With Quote
     
     
  #2176  
Old Posted Mar 4, 2017, 8:14 AM
BVictor1's Avatar
BVictor1 BVictor1 is online now
Registered User
 
Join Date: Sep 2002
Location: Chicago
Posts: 10,412
03/03/17










__________________
titanic1
Reply With Quote
     
     
  #2177  
Old Posted Mar 4, 2017, 9:47 AM
Northwest Northwest is offline
Registered User
 
Join Date: Oct 2007
Location: Chicago
Posts: 413
Quote:
Originally Posted by BVictor1 View Post
03/03/17

Now we can see how the floorplates and glazing will be staggered from expanding to shrinking, in one small step per floor. The portion on the right is expanding with height, while the one on the left is shrinking. I like how one segment zigs while the other zags. Or something to that effect. Clever, and this will look stunning from a distance, lots of complexity!
Reply With Quote
     
     
  #2178  
Old Posted Mar 4, 2017, 2:50 PM
the urban politician the urban politician is offline
The City
 
Join Date: Jul 2004
Location: Chicago region
Posts: 21,375
Yesterday the Tribune reported:

About 1/3 under contract
6 of 21 uber luxury units are under contract, including an $8.6 million penthouse
Many of the buyers are believed to be foreign, as predicted
Construction financing is expected to close in 45 to 60 days

Keep a close eye on this, guys. If Vista is a success we may see a lot more Chinese money "parked" locally, and perhaps many more high profile condo proposals
Reply With Quote
     
     
  #2179  
Old Posted Mar 4, 2017, 5:59 PM
Kngkyle Kngkyle is offline
Registered User
 
Join Date: Jul 2006
Location: Chicago
Posts: 3,097
Quote:
Originally Posted by the urban politician View Post
Yesterday the Tribune reported:

About 1/3 under contract
6 of 21 uber luxury units are under contract, including an $8.6 million penthouse
Many of the buyers are believed to be foreign, as predicted
Construction financing is expected to close in 45 to 60 days

Keep a close eye on this, guys. If Vista is a success we may see a lot more Chinese money "parked" locally, and perhaps many more high profile condo proposals
1/3 under contract is pretty decent for still being 3 years away from delivery. The sales center has been open for less than a year.

The facade looks promising as well.. all things are looking up for this project.
Reply With Quote
     
     
  #2180  
Old Posted Mar 5, 2017, 3:04 AM
Chi-Sky21 Chi-Sky21 is offline
Registered User
 
Join Date: Jul 2013
Location: Chicago
Posts: 1,286
Quote:
Originally Posted by Northwest View Post
Now we can see how the floorplates and glazing will be staggered from expanding to shrinking, in one small step per floor. The portion on the right is expanding with height, while the one on the left is shrinking. I like how one segment zigs while the other zags. Or something to that effect. Clever, and this will look stunning from a distance, lots of complexity!
Window washing should be interesting.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 3:29 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.