PARIS | Tour Hekla & Tour Campuséa | 220 M & 75 M | 48 & 20 FLOORS

http://aasarchitecture.com/2015/05/n...an-nouvel.html

May 14, 2015
by Viviana Terzoli

NEXT BREAK GROUND FOR TOWER HEKLA BY JEAN NOUVEL

The Journal du Dimanche (JDD) reports that expected shortly the laying of the cornerstone for tower Hekla in the business district of La Défense in Paris. Jean Nouvel trusts that the “curse of Defense” that haunts him for over thirty years has ended.

“I’ve never managed to build for the defense, he sighs. I finished second in the competition of the Ark [launched in 1982 by François Mitterrand]. In 1989, I had to make the tower without end, a skyscraper of 425 meters high, the models have been all over the world, but that has been abandoned, “says Jean Nouvel.

“And then there was the Signal Tower in 2008, the first high-rise mixed … swept away by the crisis. That’s a lot anyway! “That’s why the tower Hekla is particularly close to his heart.” I’m confident. There should not be any problem “continues Jean Nouvel.

The Jean Nouvel-designed tower will dramatically change the skyline of La Défense. Upon completion of the project, the site will provide a completely new space within La Défense, offering the largest green park in the area and creating a link between the business district and the Town of Puteaux.

The main bridge surrounding the site will be transformed into a pedestrian path. The outstanding location gives great visibility and fantastic views to and from west of the capital. HEKLA is expected to be completed in 2019.

Location: Paris-La Défense, France
Architect: Jean Nouvel
Developer: Hines
Net Rentable Area: 75,997 sq. m.
Year: 2019
     
     
  #2  
Old Posted Feb 26, 2016, 6:08 PM
LondonParis LondonParis is offline
Registered User
 
Join Date: Mar 2012
Posts: 293
     
     
  #3  
Old Posted Sep 28, 2016, 6:33 PM
mousquet's Avatar
mousquet mousquet is offline
Registered User
 
Join Date: Jan 2011
Location: Greater Paris, France
Posts: 4,570
Reminder.





The building site displays some additional renderings that would be true to the final product.

http://www.tour-hekla.com/

And there'll be some extra student housing nearby the office tower.





No legal appeal against the project. Jean Nouvel seems to be getting luckier these days.
Construction is said to begin next year and should be completed by 2021.
     
     
  #4  
Old Posted Sep 28, 2016, 10:30 PM
Zerton's Avatar
Zerton Zerton is offline
Ω
 
Join Date: Mar 2002
Location: Chicago
Posts: 4,553
How many towers is Paris going to make that poor man design before they actually build one?
__________________
If all others accepted the lie which the Party imposed, if all records told the same tale, then the lie passed into history and became truth. -Orwell
     
     
  #5  
Old Posted Sep 29, 2016, 11:53 AM
mousquet's Avatar
mousquet mousquet is offline
Registered User
 
Join Date: Jan 2011
Location: Greater Paris, France
Posts: 4,570
^ He's not really the guy to pity over here, though.
By the way, he'll also have his Duo towers built.

http://forum.skyscraperpage.com/showthread.php?t=199032

But these are not at la Défense and I don't expect them to be the landmark this Hekla tower would be if it was neatly built.

Highrise construction is resuming over la Défense. It seems we'll have 4 office towers, including at least 2 merely speculative under construction as of 2017 over la Défense alone, and I'm wondering how the district market will take up all that additional office space, cause it's not like we'd be in a totally thriving economy yet.
     
     
  #6  
Old Posted Sep 30, 2016, 5:05 PM
mousquet's Avatar
mousquet mousquet is offline
Registered User
 
Join Date: Jan 2011
Location: Greater Paris, France
Posts: 4,570
More renderings, since I've been pretty excited at this thing.



I find it a little fat as seen from the east and the west, assuming the district is yet hardly profitable enough to build any slim office supertall. However, the work to the façade should mitigate that flaw.





I think the 22-floor building is meant for usually broke students for real, so rents may be moderated by the local administration.



The district is supposed to host more and more student facilities. Possibly some way to have them partly immersed in a business-like routine straight from college.
     
     
  #7  
Old Posted Oct 5, 2016, 12:41 PM
LondonParis LondonParis is offline
Registered User
 
Join Date: Mar 2012
Posts: 293
http://www.monputeaux.com/2016/06/hekla-1.html

According to this article, construction is set to begin in early 2017 and completion is expected in 2020 at a total cost of 125 million €.
     
     
  #8  
Old Posted Oct 5, 2016, 12:49 PM
LondonParis LondonParis is offline
Registered User
 
Join Date: Mar 2012
Posts: 293
/Users/aurelienraymond/Desktop/6a00d8341c339153ef01b7c86a34be970b-800wi.jpg
/Users/aurelienraymond/Desktop/6a00d8341c339153ef01b8d1f40f27970c-800wi.jpg/Users/aurelienraymond/Desktop/6a00d8341c339153ef01bb090db53a970d-800wi.jpg
     
     
  #9  
Old Posted Oct 5, 2016, 12:54 PM
LondonParis LondonParis is offline
Registered User
 
Join Date: Mar 2012
Posts: 293
     
     
  #10  
Old Posted Oct 5, 2016, 3:05 PM
The Best Forumer's Avatar
The Best Forumer The Best Forumer is offline
Registered User
 
Join Date: Aug 2013
Posts: 2,774
Wow... I like it.
__________________
The suburbs are second-rate. Cookie-cutter houses, treeless yards, mediocre schools, and more crime than you think. Do your family a favor and move closer to the city.
     
     
  #11  
Old Posted Oct 5, 2016, 4:30 PM
mousquet's Avatar
mousquet mousquet is offline
Registered User
 
Join Date: Jan 2011
Location: Greater Paris, France
Posts: 4,570
Quote:
Originally Posted by LondonParis View Post
According to this article, construction is set to begin in early 2017 and completion is expected in 2020 at a total cost of 125 million €.
What's bolded seems completely impossible. They must be mistaking. Unless we're by far, hands down the total world champion of construction, but I doubt local engineering would be that advanced.

There are a 49-story office tower and a 22-story student residence to build, eh. Some work at ground level, too. Just as usual. So the cost of the whole project must be closer to half a billion euros than to 125 million.
     
     
  #12  
Old Posted Oct 5, 2016, 7:42 PM
LondonParis LondonParis is offline
Registered User
 
Join Date: Mar 2012
Posts: 293
Quote:
Originally Posted by mousquet View Post
What's bolded seems completely impossible. They must be mistaking. Unless we're by far, hands down the total world champion of construction, but I doubt local engineering would be that advanced.

There are a 49-story office tower and a 22-story student residence to build, eh. Some work at ground level, too. Just as usual. So the cost of the whole project must be closer to half a billion euros than to 125 million.
Yeah I thought so too.... Never seen a skyscraper costing at least less than 300 million euros
     
     
  #13  
Old Posted Apr 6, 2017, 11:12 AM
LondonParis LondonParis is offline
Registered User
 
Join Date: Mar 2012
Posts: 293
Consruction Update

     
     
  #14  
Old Posted Apr 6, 2017, 5:18 PM
tdawg's Avatar
tdawg tdawg is offline
Registered User
 
Join Date: Jan 2007
Location: Astoria, NY
Posts: 2,937
This tower is bad-ass.
__________________
From my head via my fingers.
     
     
  #15  
Old Posted Apr 17, 2017, 9:34 PM
LondonParis LondonParis is offline
Registered User
 
Join Date: Mar 2012
Posts: 293












[img][/img]











     
     
  #16  
Old Posted Apr 19, 2017, 10:36 PM
LondonParis LondonParis is offline
Registered User
 
Join Date: Mar 2012
Posts: 293


     
     
  #17  
Old Posted Apr 23, 2017, 2:48 PM
mousquet's Avatar
mousquet mousquet is offline
Registered User
 
Join Date: Jan 2011
Location: Greater Paris, France
Posts: 4,570
Woah, I hadn't figured the 2 buildings would manage these car lanes at ground level. First rendering above looks great!

However, I think only the shorter student housing building is officially under construction at the moment. That's yet something, a nice treat for local students.

The site of the office tower proper is in a preliminary stage. Actual construction is expected to follow later this year.
     
     
  #18  
Old Posted Apr 30, 2017, 7:49 PM
LondonParis LondonParis is offline
Registered User
 
Join Date: Mar 2012
Posts: 293






















     
     
  #19  
Old Posted Jul 10, 2017, 1:24 PM
LondonParis LondonParis is offline
Registered User
 
Join Date: Mar 2012
Posts: 293
CONSTRUCTION UPDATE :

[img]blob:http://www.devisubox.com/2ca2a387-8540-4109-a553-f01ae8a5615b[/img]
     
     
  #20  
Old Posted Jul 18, 2017, 2:02 PM
LondonParis LondonParis is offline
Registered User
 
Join Date: Mar 2012
Posts: 293
CONSTRUCTION UPDATES :









     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 6:57 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.