I-395 bridge funded for 2018



Quote:
Major improvements to I-395, including a new signature bridge, are funded for 2018 and preliminary design work continues with an eye toward a January 2015 design completion date, according to the Florida Department of Transportation.

In addition, designers and engineers with the state transportation department have narrowed design options for the bridge from four to two alternatives: Lotus and Wishbone.

“The design has not yet been chosen,” said Tasha Cunningham, spokesperson for the transportation department. “The department is working with the Aesthetic Steering Committee. At this time, both the Wishbone and Lotus designs are being considered.”

Twenty years in the making, Miami city leaders had to fight to get the I-395 project back on track. City commissioners in July announced an agreement with the state for reconstruction of Interstate 395 that calls for a new “signature” bridge near the Adrienne Arsht Center for the Performing Arts.

The project has an estimated construction cost of $500 million to $600 million, in present day dollars, depending on selected structural design.

The reconstruction involves some 1.4 miles of roadway.

The project goes far beyond construction of a new bridge, with a goal of opening up the vistas near the arts center and Museum Park. Maps show the roadway improvements occurring in three zones or segments, from where it joins I-95 on the west and the start of the MacArthur Causeway over Biscayne Bay on the east.

“Preliminary design will be complete by January 2015,” said Ms. Cunningham. “Construction is currently funded beginning in 2018 as a Design/Build/Finance project.”

A fact sheet on the project shows proposed improvements include:

* Building new elevated ramps (one eastbound, one westbound) that will directly link I-95 and I-395.
* Improving roadway design, including updating the alignment and upgrading the roadway surface.
* Creating a visually appealing bridge.
* Building taller structures that will improve the visual quality of the bridge.


[...]
Possible Designs:

1) Wishbone:







2) Lotus:





========================================
http://www.miamitodaynews.com/2014/1...e-funded-2018/
http://www.exmiami.org/index.php/her...owntown-miami/
Reply With Quote
     
     
  #2  
Old Posted Oct 21, 2014, 11:19 PM
Busy Bee's Avatar
Busy Bee Busy Bee is offline
Show me the blueprints
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,260
Wishbone. Lotus is a mess.
__________________
Everything new is old again

There is no goodness in him, and his power to convince people otherwise is beyond understanding
Reply With Quote
     
     
  #3  
Old Posted Oct 22, 2014, 5:52 AM
eleven=11 eleven=11 is offline
Registered User
 
Join Date: Aug 2012
Posts: 1,053
ok I got 3 questions
who thinks Rick Scott is scary?
Reply With Quote
     
     
  #4  
Old Posted Oct 22, 2014, 1:49 PM
Onn Onn is offline
Registered User
 
Join Date: Apr 2010
Location: The United States
Posts: 1,937
Wishbone is the better design for sure! Has Dubai arrived in America?

As for the Florida governor, many governors do this. He's not alone in proposing built some massive speculative bridge.
Reply With Quote
     
     
  #5  
Old Posted Oct 22, 2014, 2:38 PM
jd3189 jd3189 is offline
An Optimistic Realist
 
Join Date: Dec 2010
Location: Loma Linda, CA / West Palm Beach, FL
Posts: 5,569
Great design, not so great location. Why not build it on one of the bridges that cross Biscayne Bay? All they are doing is adding flowers to an eyesore in Miami's core.
__________________
Working towards making American cities walkable again!
Reply With Quote
     
     
  #6  
Old Posted Oct 23, 2014, 3:25 AM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 2,964
Quote:
Originally Posted by Onn View Post
Wishbone is the better design for sure! Has Dubai arrived in America?

As for the Florida governor, many governors do this. He's not alone in proposing built some massive speculative bridge.
No, Dubai is not arrived in America. I don't think he can do that. Sorry!

Quote:
Originally Posted by eleven=11 View Post
ok I got 3 questions
who thinks Rick Scott is scary?
Yes, he will be very scared. He will not gonna like it.
Reply With Quote
     
     
  #7  
Old Posted Oct 24, 2014, 11:22 PM
aquablue aquablue is offline
BANNED
 
Join Date: Nov 2003
Posts: 1,741
Great for Miami.
Reply With Quote
     
     
  #8  
Old Posted Oct 29, 2014, 8:03 PM
aquablue aquablue is offline
BANNED
 
Join Date: Nov 2003
Posts: 1,741
Quote:
Originally Posted by Onn View Post
Wishbone is the better design for sure! Has Dubai arrived in America?

As for the Florida governor, many governors do this. He's not alone in proposing built some massive speculative bridge.
Lotus has the M for Miami, Lotus is far the better choice. Wishbone is just a common design for a modern bridge that has been seen and done before globally. So, Lotus it is for "M"iami. Even if it's a bit tacky, it is unique.
Reply With Quote
     
     
  #9  
Old Posted Oct 30, 2014, 12:21 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,674
I prefer Lotus personally. The other like you said looks like every other bridge.
Reply With Quote
     
     
  #10  
Old Posted Feb 13, 2015, 7:12 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,674
Signature Bridge Accelerated, But Designs Could Be Scrapped; Metromover Will Need To Be Relocated



Quote:
FDOT’s plan to build a $600 million Signature Bridge in Downtown Miami will require one of the piers supporting the Metromover to be moved.

Dade’s commission will need to approve the pier relocation. Federal officials have already approved it. Federal approval was required, since they provided part of the funding to build the system.

It isn’t clear how disruptive the work would be to passengers. The department is pledging that most of the work will take place during non-operating hours. FDOT is also pledging to keep a corridor open for a mass transit connection to the beach.

Genting had also indicated that they would want to move the Metromover to build Resorts World Miami, but that plan has stalled.

FDOT has recently accelerated the Signature Bridge project, and concept plans and an RFP are now expected to be ready by April. Construction could begin by the end of next year.

Two designs, Wishbone and Lotus, are being considered. However, officials now say that they are would consider a third design if it was proposed by a design-build team.
===============================
http://www.thenextmiami.com/index.ph...eed-relocated/
Reply With Quote
     
     
  #11  
Old Posted Feb 17, 2015, 4:37 AM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 2,964
Why Metromover need to be relocated it? What happened Omni station? Do you think that they will be closed?
Reply With Quote
     
     
  #12  
Old Posted Aug 12, 2015, 9:44 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,674
Design Guidelines For $600 Million Signature Bridge Released

Quote:
FDOT has released design guidelines for the downtown Miami’s signature bridge project, along with a timeline for the bidding process.

At a meeting last month, officials presented an aesthetics manual that is to be used as guidance by design-build teams interested in bidding in the project. Shapes, textures, colors and lighting were among the details released.

FDOT says that the bridge is intended to be a world-class, iconic structure which will serve as a landmark for Miami. They hope to keep costs below $600 million.

Two designs – Wishbone and Lotus, have been selected, although a third option proposed by a design-build team would be considered. The minimum apex above street level will be 245 feet, meaning that it will be dwarfed by neighboring towers such as Marquis, which tops out at about 700 feet.

The bidding process is scheduled to begin next month, and five design-build teams will be selected by the end of the year. The winning bid is expected to be selected by September 2016, and construction could begin by the end of 2016.









===================
http://www.scribd.com/doc/274253935/395
Reply With Quote
     
     
  #13  
Old Posted Dec 23, 2015, 6:48 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,674
Extra Source: http://www.miamitodaynews.com/2015/1...go-to-baylink/



Commissioner: Build Baylink Instead Of Signature Bridge

Quote:
Is Baylink more important than a signature bridge?

Miami commissioner Francis Suarez says yes. He recently suggested that funding for the $600 million bridge be diverted to build a train between Miami and Miami Beach, according to Miami Today.

Suarez’s father is Dade commissioner Xavier Suarez, who is also opposed to the bridge. As recently as last year, he pushed for the roadway to be placed underground to remove the blight of a highway cutting through downtown. FDOT has rejected that option.

The signature bridge has been in the works for years and is already funded. Other local politicians worry that if the bridge was cancelled, the funding would be moved elsewhere in the state instead. Miami officials once sued the state when FDOT considered replacing the signature bridge with a less expensive design.

a tunnel instead of a bridge would remove blight:




design guideline for signature bridge:



==========================
http://www.thenextmiami.com/commissi...nature-bridge/
Reply With Quote
     
     
  #14  
Old Posted Dec 24, 2015, 6:00 AM
eleven=11 eleven=11 is offline
Registered User
 
Join Date: Aug 2012
Posts: 1,053
Quote:
Originally Posted by N830MH View Post
Why Metromover need to be relocated it? What happened Omni station? Do you think that they will be closed?
why is this called a bridge and not a freeway overpass?
good location thou.
Reply With Quote
     
     
  #15  
Old Posted Dec 25, 2015, 4:40 AM
RobEss's Avatar
RobEss RobEss is offline
Walk taker
 
Join Date: Jan 2013
Location: Brooklyn
Posts: 489
Highways that cut through cities are scars left from the Robert Moses era. Miami would do well to build that tunnel - though with sea levels rising as they are, perhaps not.
Reply With Quote
     
     
  #16  
Old Posted Jan 16, 2016, 5:10 AM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 2,964
Haven't they already approved it yet? How, when or what? Are they supposed to start construction sometime end of 2016?
Reply With Quote
     
     
  #17  
Old Posted Jan 21, 2016, 9:24 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,674
Study: Tunnel Would Cost $1.3B More Than Signature Bridge

Quote:
FDOT evaluated a proposal to put a portion of I-395 and Biscayne Boulevard underground, instead of building a Signature Bridge. The results:

The tunnels would cost $1.3 billion more than the Signature Bridge
Both Biscayne Boulevard and I-395 would have to be locked down during Hurricane events due to flooding concerns, closing vital evacuation routes
Metromover would need to be reconstructed, with associated cost and service disruption
Biscayne Boulevard and other nearby streets would need to be closed during construction
Pedestrian crosswalks would be eliminated in some areas near the tunnel. Nearby streets would also need to be elevated, inhibiting access
Likelihood of contaminated soil during excavation. Area was previously occupied by the Belcher Oil Terminal & Tank Farm
Construction would be delayed an extra five years for a Supplemental Environmental Impact Statement
FDOT’s Gus Pego will present the study, along with an update on the Signature Bridge, to Miami commissioners next week.

=====================
NXT
Reply With Quote
     
     
  #18  
Old Posted Dec 26, 2016, 1:15 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,674
State nears new I-395 signature bridge downtown

Quote:
The state transportation department is closer than ever to final plans to improve I-395 and build a new signature bridge spanning Biscayne Boulevard in downtown Miami.

If the current timetable unfolds without unexpected detours, work on the massive project should begin within 12 months.

That’s the word from the Florida Department of Transportation.

Five firms approved by the state to enter the final phase of the procurement process are currently preparing final details of price proposals. A bid opening is set for spring.

A public meeting to announce technical scores and open price proposals is scheduled for April 10, Maria I. Perdomo of the transportation department said this week. She is project manager for the I-395 revamp.

The project, which includes improvements to I-95 and 836, has an estimated cost of $800 million and will be accomplished through a team effort.
===========================
http://www.miamitodaynews.com/2016/1...idge-downtown/
Reply With Quote
     
     
  #19  
Old Posted Dec 26, 2016, 1:28 AM
SEFTA's Avatar
SEFTA SEFTA is offline
Philly Pholly
 
Join Date: Jan 2016
Posts: 1,239
This should be a transit line, not a "signature bride". All this just to jam thru "Lexus Lanes". The problem is not the Miami side but the beach side. Alton Road and 5th Street aren't going to be magically widened to accommodate the "faster" traffic co1ming over. Silliness. The beach's roads are saturated.There needs to be an alternative to the car if there is to be a successful Convention Center
Reply With Quote
     
     
  #20  
Old Posted Apr 17, 2017, 4:54 PM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 2,964
When they will start construction? How, when or what? How long it will take?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > General Development
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 6:10 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.