HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > Taiwan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Aug 25, 2014, 4:17 AM
East District East District is offline
Registered User
 
Join Date: Aug 2014
Posts: 12
Thanks William for posting these updates about T3. I've been anxiously waiting for what their plans are and it looks pretty amazing! The MFB area really pushes Taiwan's airport beyond other airports.

Some questions:

Quote:
In addition to the RFI seminar, TIAC has begun to arrange the 2015 design tender, with the purpose of selecting the first-class team to unfold the detail design afterwards. In the future the construction of the T3 area will be executed in stages and opened for operation regionally to serve passengers.
So does this mean the design of the airport in the video isn't finalized?

Is there a projected start and finish date for the construction? I know this sounds like such a trivial question given how often projects in Taiwan are delayed (*cough* airport MRT)
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > Taiwan
Forum Jump



Forum Jump


All times are GMT. The time now is 10:07 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.