Quote:
Originally Posted by the Genral
I know, I was just looking at the scope of the COTA construction and how quickly it was built and how much longer its going to take to add a few gates. Maybe the ABIA expansion is a larger scale and should takes years to complete than I imagine.
|
It has a lot of components.
-Demolish some left over airforce base buildings to make room for more taxi-way
-Expand the apron area south and east of the terminal by about 27 acres
- Move the 116,000-square-foot detention pond near the apron and make it about 20 percent larger to store and treat runoff water and de-icing material.
-Build the Actual terminal structure