Quote:
Originally Posted by ATX2030
Thanks. Was really hoping to see this 800 footer get built.
|
I mean, with the Travis 98 Red River seemingly being built simultaneously, there isn't really too much feasibility to build this during that time frame as well. So things might change in the next couple years, but I'm not confident we'll see anything until 2024 or so, when something could actually start the wheels moving towards construction.
The same is sort of true with the parking lot across from 98 Red River, which is the staging area for that construction. Even being owned by the same groups with the same developer, I doubt we'll see any plans there until 98RR is closer to being done.