HomeDiagramsDatabaseMapsForumSkyscraper Posters
     

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > Taiwan

Reply

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Apr 26, 2017, 3:01 PM
pttwarrior pttwarrior is offline
Registered User
 
Join Date: Jun 2010
Posts: 796
Kaohsiung Circular Light Rail Transit | World's first 100% catenary-free light rail

City: Kaohsiung 高雄 가오슝 เกาสง

Country: Taiwan 台湾 대만 ไต้หวัน



Kaohsiung Circular Light Rail Transit:

World's first 100% catenary-free light rail



高雄環狀輕軌


Source: http://www.taiwannews.com.tw/en/news/3147389

Kaohsiung Circular Light Rail Transit aims to attract 4M riders

Taiwan's southern city Kaohsiung's third rail infrastructure aims to attract four million riders

By Judy Lin,Taiwan News, Editor
2017/04/23 17:58




(Taiwan News)—Taiwan southern city's Kaohsiung Circular Light Rail Transit (高雄環狀輕軌) will become the metropolis third light rail line that will connect all of its different rail networks and significantly boost Metro Rapid Transit (MRT) ridership.

The Kaohsiung Circular Light Rail Transit will become the first “mobile landmark” of the city to connect its MRT, Taiwan Railway, and High Speed Rail system.

One of the aims of the new light rail transit is making the city greener, reduce traffic congestion, cut carbon footprint, and clean up air pollution by changing local citizens’ commuting habits of being highly dependent on personal scooters and cars to embracing rail transport.

Another goal of the new rail infrastructure is to stimulate local tourism and raise The Koahsiung Circular Light Rail Transit ridership to 4 million to generate an annual tourism income of NT$11.3 billion (US$372.2 million).

The tourism income estimations by the local government are based on other new tourism infrastructure constructions that will be finished shortly after the launch of the new rail line.

The Kaohsiung Circular Light Rail Transit stations will reach Kaohsiung’s Asia New Bay Area (亞洲新灣區), Kaohsiung Exhibition Center (高雄展覽館), and Kaohsiung Public Library (高雄市立圖書館).

According to the Kaohsiung City Mass Rapid Transit Company (KRMT) the light rail is constructed in two phases, and builders are close to finishing the first phase of the project, which includes eight stations. KRMT has started second phase of the light rail constructions.

The light rail line will be a tourism rail route that runs through the city center, and around other important sightseeing areas including Kaohsiung Multifunctional Commerce and Trade Park (多功能經貿園區), The Pier-2 Art Center (駁二藝術特區), and Kaohsiung Museum of Fine Arts (美術館園區).

KRMT estimates the light rail transit will be in operations after three years, and will increase Kaohsiung’s current MRT ridership by 53 percent.

It took the KMRT nine years before the city’s MRT line became profitable, so the business model of the new light rail will present a new challenge for the company.

However, KMRT officials were optimistic the light rail line ticket prices would be sufficient enough to make it profitable.

The Kaohsiung Circular Light Rail Transit will also be changing local road user habits since it will lack protective walls to prevent collisions between pedestrians, cars, scooters with the trains.

At least four traffic accidents occurred during the one-year pilot project of the light rail train because pedestrians, cars or scooters did not give way to trains.

The Kaohsiung city government hopes the new light rail line will help locals develop better road user habits and let the light transit rail pass first at cross roads and other intersections.


Welcome to Kaohsiung
高雄へようこそ
가오슝에 오신 것을 환영합니다
ยินดีต้อนรับสู่เกาสง
Chào mừng đến Kaohsiung
__________________
"Discovery: Asia's New Bay Area - Kaohsiung" https://www.youtube.com/watch?v=X9qUWTgynOM
"Flying Over Kaohsiung" https://www.youtube.com/watch?v=uHgbfzNqduc
Reply With Quote
     
     
  #2  
Old Posted Jul 10, 2017, 5:51 PM
pttwarrior pttwarrior is offline
Registered User
 
Join Date: Jun 2010
Posts: 796
City: Kaohsiung 高雄 가오슝 เกาสง


Source: http://lol.esportsmatrix.com/en-GB/News/Detail?id=4773

City of Kaohsiung Has Specially Painted A Subway For Upcoming League of Legends Rift Rivals Event

178&akshonesports Time:24/06/2017



The inaugural Rift Rivals tournament drawing near and to welcome all the Summoners who will be travelling to the city of Kaohsiung, to watch their favorite LPL, LMS, and LCK compete for supremacy, the city major Chen Ji has revealed a specially painted subway painted in the a Rift Rivals Red motif to transport fans in style.









Welcome to Kaohsiung
高雄へようこそ
가오슝에 오신 것을 환영합니다
ยินดีต้อนรับสู่เกาสง
Chào mừng đến Kaohsiung
__________________
"Discovery: Asia's New Bay Area - Kaohsiung" https://www.youtube.com/watch?v=X9qUWTgynOM
"Flying Over Kaohsiung" https://www.youtube.com/watch?v=uHgbfzNqduc
Reply With Quote
     
     
  #3  
Old Posted Oct 7, 2017, 3:16 AM
pttwarrior pttwarrior is offline
Registered User
 
Join Date: Jun 2010
Posts: 796
Taiwan 台湾 대만 ไต้หวัน
Kaohsiung 高雄 가오슝 เกาสง

Source: http://focustaiwan.tw/news/aeco/201709100011.aspx

Free travel on Kaohsiung light rail line to end November


Photo courtesy of the Kaohsiung Mass Transit Bureau

Kaohsiung, Sept. 10 (CNA) Passengers traveling on the light rail line of the Kaohsiung Mass Rapid Transit (KMRT) system will have to pay fares with effect from November, the KMRT Bureau said Sunday.

Travel on the light rail line, the first of its kind in Taiwan, has been free of cost since it was inaugurated in October 2015 but with the extension of the line this year and a sharp growth in the number of passengers, a fare system will be put in place, said KMRT Bureau Director Wu I-lung (吳義隆).

The line, which opened with four stops, was extended in June to the popular Pier-2 Art Center in Kaohsiung Port and now has 14 stations, Wu said.

As the service is being gradually extended, trams currently run from the C1 Lizihnei Station to C12 Dayi Pier-2 Station.

The new section will open fully on September 30 all the way to C14 Hamasen Station, and fares will be introduced in November but at a 50 percent discount for the first two months, he said.

The 8.7-kilometer waterfront light rail line is part of the Kaohsiung Circular Line that was designed to be incorporated into the KMRT system to complete the city's metro service network.

Ridership on the light rail line averages 13,000 passengers per day on work days, and nearly 20,000 on weekends and holidays, according to Shih Yao-cheng (石耀誠), chief executive of public affairs at Kaohsiung Rapid Transit Corp.

(By Wang Shwu-fen and Elizabeth Hsu)
__________________
"Discovery: Asia's New Bay Area - Kaohsiung" https://www.youtube.com/watch?v=X9qUWTgynOM
"Flying Over Kaohsiung" https://www.youtube.com/watch?v=uHgbfzNqduc
Reply With Quote
     
     
  #4  
Old Posted Oct 7, 2017, 3:20 AM
pttwarrior pttwarrior is offline
Registered User
 
Join Date: Jun 2010
Posts: 796
Taiwan 台湾 대만 ไต้หวัน
Kaohsiung 高雄 가오슝 เกาสง

Source: http://www.taipeitimes.com/News/taiw.../11/2003678238

KMRT light rail to start charging

Staff writer, with CNA

The Kaohsiung Mass Rapid Transit (KMRT) system’s light rail line is to begin charging fares in November, the KMRT Bureau said yesterday.

Travel on the light rail line, the first of its kind in Taiwan, has been free since it opened in October 2015, but with the extension of the line this year a sharp increase in the number of passengers, a fare schedule will be established, bureau Director Wu Yi-long (吳義隆) said.

The line, which opened with four stops, was extended in June to the popular Pier-2 Art Center in Kaohsiung Port and has 14 stations.

Trams run from Lizihnei Station (C1) to Dayi Pier-2 Station (C12), with the section to Hamasen Station (C14) to open on Sept. 30.

Although fares are to be introduced in November, they will be half-price for the first two months, he said.

The 8.7km waterfront rail is part of the Kaohsiung Circular Line that was designed to complete the city’s metro service network.

There are about 13,000 passengers per day on work days and nearly 20,000 on weekends and holidays, Kaohsiung Rapid Transit Corp said.

In related news, the city is to open an electric car rental station on Oct. 1 as part the its electric car-sharing system, the city’s Transportation Bureau said.

The station is to be at the No. 2 exit of the KMRT’s Sizihwan Station (西子灣), the bureau said, adding that five electric cars will be available for free during the month.

The city government in May signed a contract with the electric car rental company Unicar, it said.

Over the next two years, 50 electric car rental stations are to open, offering a total of 84 vehicles at a tentative rate of NT$150 per 30 minutes, it said.

The first 10 stations are to be set up by May next year near the high-speed rail system’s Zuoying Station (左營), railway stations, MRT stations, department stores and hospitals in the city.
__________________
"Discovery: Asia's New Bay Area - Kaohsiung" https://www.youtube.com/watch?v=X9qUWTgynOM
"Flying Over Kaohsiung" https://www.youtube.com/watch?v=uHgbfzNqduc
Reply With Quote
     
     
  #5  
Old Posted Jul 22, 2018, 10:44 AM
pttwarrior pttwarrior is offline
Registered User
 
Join Date: Jun 2010
Posts: 796
Kaohsiung tramway system
CAF Turnkey & Engineering

Video Link


Taiwan 台湾 대만 ไต้หวัน
Kaohsiung 高雄 가오슝 เกาสง
__________________
"Discovery: Asia's New Bay Area - Kaohsiung" https://www.youtube.com/watch?v=X9qUWTgynOM
"Flying Over Kaohsiung" https://www.youtube.com/watch?v=uHgbfzNqduc
Reply With Quote
     
     
  #6  
Old Posted Aug 7, 2018, 4:20 PM
pttwarrior pttwarrior is offline
Registered User
 
Join Date: Jun 2010
Posts: 796
New trams for Kaohsiung LRT Stage 2










高雄點


Taiwan 台湾 대만 ไต้หวัน
Kaohsiung 高雄 가오슝 เกาสง
__________________
"Discovery: Asia's New Bay Area - Kaohsiung" https://www.youtube.com/watch?v=X9qUWTgynOM
"Flying Over Kaohsiung" https://www.youtube.com/watch?v=uHgbfzNqduc
Reply With Quote
     
     
  #7  
Old Posted Aug 13, 2018, 4:26 PM
pttwarrior pttwarrior is offline
Registered User
 
Join Date: Jun 2010
Posts: 796
Kaohsiung LRT Stage 2


FB高雄輕軌好行


Taiwan 台湾 대만 ไต้หวัน
Kaohsiung 高雄 가오슝 เกาสง
__________________
"Discovery: Asia's New Bay Area - Kaohsiung" https://www.youtube.com/watch?v=X9qUWTgynOM
"Flying Over Kaohsiung" https://www.youtube.com/watch?v=uHgbfzNqduc
Reply With Quote
     
     
  #8  
Old Posted Aug 14, 2018, 5:22 AM
pttwarrior pttwarrior is offline
Registered User
 
Join Date: Jun 2010
Posts: 796
Source: https://udn.com/news/story/7327/3288958

高雄二階輕軌首列列車從比利時離港 9月下旬實地試車

2018-08-03 16:29聯合報 記者楊濡嘉╱即時報導

雖然高雄輕軌二階工程受到部分路段居民的抗議並暫停,高雄市捷運局仍依既定進度進行二階輕軌相關作業,二階首列輕軌列車已於本月2日從比利時安特衛普港上汽車輪船,今天離港啟航,預計9月上旬運到基隆港。

高市捷運局表示,二階輕軌首列車輛7月25日在法國Alstom車輛製造廠完成出廠作業程序,以拖車方式路運,7月31日抵達比利時安特衛普(ANTWERP)港口,昨天上汽車輪船,今天離港啟航,將經地中海、蘇伊士運河、停靠非洲吉布提、新加坡等港口,預計航行約32天,於9月上旬運抵有汽車碼頭的基隆港,等完成報關程序後,將協調相關路權單位利用夜間行駛高速公路,將列車運送到高雄輕軌機廠卸載。

高雄環狀輕軌建設第二階段統包工程由中鋼標得,中鋼向法商阿爾斯通(Alstom)採購15列CITADIS 305系列輕軌車輛,首列車輛經約7個月的製造、車體組裝、佈線、10個檢驗點通過檢驗,車輛完整聯結,製造商並在廠內測試軌做列車出廠的動態測試,捷運局說,這些測試都符合合約的要求。

捷運局長吳義隆表示,目前輕軌第二階段工程完成五福、新樂街C15到興隆路與河川路口的C17車站鋪軌作業,C15車站鋼構已完成,持續進行大公路與鼓山一路口C16站與C17車站鋼構,並施做輕軌路廊旁人行道、自行車道。

吳義隆說,到7月底,二階輕軌工程進度逾38%,C15到C17車站的機電系統已完成供電電纜佈設,相關供電、號誌、通訊系統機櫃及設備也陸續安裝接線,輕軌二階第一列車9月下旬送到高雄之後,會在C15到 C17間做行車測試。


雖然高雄輕軌二階工程受到部分路段居民的抗議並暫停,二階首列輕軌列車今天已離比利時安特衛普港往基隆港途中,高市捷運局預計9月下旬列車到高後展開實地測試。圖/高雄市捷運局提供



Kaohsiung 高雄 가오슝 เกาสง
Taiwan 台湾 대만 ไต้หวัน
__________________
"Discovery: Asia's New Bay Area - Kaohsiung" https://www.youtube.com/watch?v=X9qUWTgynOM
"Flying Over Kaohsiung" https://www.youtube.com/watch?v=uHgbfzNqduc
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > Taiwan
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 12:30 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2018, vBulletin Solutions, Inc.