Some of the 7th fl slab is now built with the wall forms moved. The remaining 7th fl slab should be finishing up this week.
Reply With Quote
     
     
  #42  
Old Posted Aug 17, 2018, 7:08 PM
UpstairsCranberry UpstairsCranberry is offline
Registered User
 
Join Date: Aug 2018
Posts: 56
It should be noted that Tower B is currently in for permit according to the City's Property Inquiry system.
Reply With Quote
     
     
  #43  
Old Posted Aug 17, 2018, 7:41 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,792
I noticed they had excavated the west side of the pit in preparation for the west tower. I would suspect they focus on the east tower before moving to the west tower construction next year.
Reply With Quote
     
     
  #44  
Old Posted Aug 17, 2018, 8:48 PM
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,541
Man are they ever moving slowly on this. Looking back through this thread, it sure seems like a slower pace than other buildings recently.
Reply With Quote
     
     
  #45  
Old Posted Aug 18, 2018, 12:45 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,792
They are slow even for Form and Pour concrete technique. To contrast with what Tricar has been doing on their towers which is using factory made precast concrete sections for walls and floor slabs.

Precast concrete has a major speed advantage over form and pour concrete.
Reply With Quote
     
     
  #46  
Old Posted Aug 18, 2018, 1:12 PM
UpstairsCranberry UpstairsCranberry is offline
Registered User
 
Join Date: Aug 2018
Posts: 56
Quote:
Originally Posted by jammer139 View Post
They are slow even for Form and Pour concrete technique. To contrast with what Tricar has been doing on their towers which is using factory made precast concrete sections for walls and floor slabs.

Precast concrete has a major speed advantage over form and pour concrete.
Ryse is pretty new. He broke off from doing, I think, Old Oak properties. So it's like a new thing for all parties except for maybe the engineers. York, Ryse, Zedd. Well, especially for York. Zedd, according to their website, as s.h.y architecture, has high rises, but they are in Hamilton Bermuda. But, it's not like the Architect picks the structural system. In fact, I doubt it was the structural engineer either. I am sure it was Ryse and York, going by what the old guys like Drowlo, Old Oak, and the like do - Hambro.
Reply With Quote
     
     
  #47  
Old Posted Aug 26, 2018, 9:25 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,792
Most of 7th floor walls now finished. Should be starting the 8th floor slab this week.
Reply With Quote
     
     
  #48  
Old Posted Sep 7, 2018, 10:55 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,792
Good progress on 8th fl walls and even some of the 9th fl slab. Approaching the half way point in height.
Reply With Quote
     
     
  #49  
Old Posted Sep 15, 2018, 12:45 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,792
8th floor wrapped up as 9th floor now started.
Reply With Quote
     
     
  #50  
Old Posted Sep 23, 2018, 6:10 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,792
The 9th floor nearly finished as the forms have now started being moved up to 10th. Basically now on a 2 floors per month pace which should see them done the 12th floor by end of Oct. 15th floor by end of Dec (due to holiday break). And topping out in Feb with mechanical penthouse in March.

Attention should then move to west tower side and completing the underground parking levels and working their way up from there.
Reply With Quote
     
     
  #51  
Old Posted Sep 30, 2018, 1:50 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,792
Concrete forms up for 10th floor walls now.
Reply With Quote
     
     
  #52  
Old Posted Oct 2, 2018, 12:58 AM
rml rml is offline
Registered User
 
Join Date: Feb 2017
Location: London
Posts: 46
Quote:
Originally Posted by jammer139 View Post
Good progress on 8th fl walls and even some of the 9th fl slab. Approaching the half way point in height.
Looking very nice!
Reply With Quote
     
     
  #53  
Old Posted Oct 22, 2018, 11:31 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,792
11th floor nearly finished.
Reply With Quote
     
     
  #54  
Old Posted Oct 26, 2018, 11:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,792
12th floor walls started now.
Reply With Quote
     
     
  #55  
Old Posted Oct 30, 2018, 1:14 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,792
They have started the foundation work on the west tower finally. Two levels of underground parking to get to ground level on the west tower.
Reply With Quote
     
     
  #56  
Old Posted Nov 11, 2018, 12:13 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,792
12th floor finishing up and some of the wall forms up for 13th floor.
Reply With Quote
     
     
  #57  
Old Posted Nov 25, 2018, 5:57 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,792
13th floor nearly finished. Progress continues on L2 level under west tower.
Reply With Quote
     
     
  #58  
Old Posted Dec 6, 2018, 12:37 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,792
14th fl wall forms being set up.
Reply With Quote
     
     
  #59  
Old Posted Dec 14, 2018, 10:27 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,792
Should be finishing the 14th fl next week. Some forms already up for 15th fl.
Reply With Quote
     
     
  #60  
Old Posted Dec 24, 2018, 4:12 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,792
Good progress on 15th floor walls. Windows now installed upto 4th floor. L2 parking level under west tower now has most of the walls poured. Not sure if East tower is slated to be the 17th storey one or 16 storey. Either way it will be topped out by Feb and the concrete crews will focus all their attention on west tower at that point.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 1:32 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.