Posted Jun 7, 2021, 4:24 PM
|
Registered User
|
|
Join Date: Jun 2016
Location: London
Posts: 5,795
|
|
Still forming and pouring L1 walls and posts. Have set the ground floor slabs along north side of parking area under the podium base. The SE corner still has a dirt ramp down to bottom of pit that will need to be excavated out to finish the footings and L2, L1 walls and posts.
|