Most of 8th floor walls are now installed. Should see 9th floor wall slabs going in next week. Some of the L2 walls have started under tower 2 now as well.
Reply With Quote
     
     
  #42  
Old Posted Nov 13, 2020, 4:23 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Some of 9th floor slabs now installed. L2 walls under tower 2 continue to be installed.
Reply With Quote
     
     
  #43  
Old Posted Nov 23, 2020, 8:04 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
About 50% of the 9th floor slab is now installed. Should see it completed by weeks end.
Reply With Quote
     
     
  #44  
Old Posted Nov 27, 2020, 4:38 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Some of the 9th floor walls are now installed and nearly finished with 9th floor slab installs. L2 level walls under tower 2 continues using mobile crane.
Reply With Quote
     
     
  #45  
Old Posted Dec 9, 2020, 5:55 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
9th floor walls are now done and have started installing the 10th floor slab. The 10th floor is the final residential floor and is set back to provide large patios for the penthouse suites. Should see the 10th floor completed before the Christmas break.
Reply With Quote
     
     
  #46  
Old Posted Dec 14, 2020, 9:08 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Nearly done installing the 10th floor slabs. Even have some of the 10th floor walls now up.
Reply With Quote
     
     
  #47  
Old Posted Jan 7, 2021, 5:57 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Nearly done installing the roof slabs for final floor. Mechanical penthouse walls could be going up next week. L2 level walls and posts continue under tower 2 as does the parking ramp build.
Reply With Quote
     
     
  #48  
Old Posted Jan 11, 2021, 4:57 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
10th floor roof slabs are now done. Have started installing the penthouse walls today.
Reply With Quote
     
     
  #49  
Old Posted Jan 15, 2021, 6:03 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Nearly done the mechanical penthouse walls now. This should be topped out by next week. The concrete crew will turn their full attention to the underground parking garage for tower 2. Will likely see the tower crane moved for tower 2 by end of Feb.
Reply With Quote
     
     
  #50  
Old Posted Jan 24, 2021, 3:31 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
About half of the L2 walls now poured under tower 2.
Reply With Quote
     
     
  #51  
Old Posted Jan 29, 2021, 1:09 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Nice photo in this LFP article. - https://lfpress.com/news/local-news/...f-3-4-per-cent
Reply With Quote
     
     
  #52  
Old Posted Feb 12, 2021, 2:25 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Nearly done the L2 walls and posts for the second tower.
Reply With Quote
     
     
  #53  
Old Posted Feb 28, 2021, 3:34 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Have started installing the 10th floor windows now. L1 walls for parking ramp have been poured. Remainder of tower 2 parking garage is still at the L2 level walls and posts.
Reply With Quote
     
     
  #54  
Old Posted Mar 26, 2021, 3:09 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Tricar has disassembled the tower crane and preparing to move it for tower 2. With it re-positioned they will be able to make progress on the tower 2 underground parking levels.
Reply With Quote
     
     
  #55  
Old Posted Apr 6, 2021, 3:38 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Mobile crane onsite today assembling the tower crane for building 2. Looks like it will be positioned on south side of building along Sunningdale rd rather then on north side. Assume its too allow easier access to tower 1 for residents during construction.
Reply With Quote
     
     
  #56  
Old Posted Apr 20, 2021, 7:37 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Installing some of the L1 floor slabs today for tower 2.
Reply With Quote
     
     
  #57  
Old Posted Apr 25, 2021, 6:00 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Half the L1 floors slabs now installed on the west side. Steel rebar for some of the L1 walls now up. Still have dirt ramp down to L2 level on SE corner which will need to be dug out to finish that corner footings and walls.
Reply With Quote
     
     
  #58  
Old Posted May 5, 2021, 3:53 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Some of the L1 walls are now poured on west end of tower 2. Apparently they have already pre-sold 90% of tower 2 units. Would expect that Tricar will start excavation for tower 3 by end of this year and complete tower 4 by end of 2023 to finish the site.
Reply With Quote
     
     
  #59  
Old Posted Jun 7, 2021, 4:24 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Still forming and pouring L1 walls and posts. Have set the ground floor slabs along north side of parking area under the podium base. The SE corner still has a dirt ramp down to bottom of pit that will need to be excavated out to finish the footings and L2, L1 walls and posts.
Reply With Quote
     
     
  #60  
Old Posted Jun 11, 2021, 7:23 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Started installing some more of the ground floor slabs on the west side of tower 2. Excavating the dirt ramp down into the pit at the SE corner has started.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 2:17 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.