HomeDiagramsDatabaseMapsForumSkyscraper Posters
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast

Reply

 
Thread Tools Display Modes
     
     
  #21  
Old Posted Nov 5, 2017, 3:00 PM
urbanscraper's Avatar
urbanscraper urbanscraper is offline
Greensboro Rocks!
 
Join Date: Jun 2004
Location: Greensboro, NC
Posts: 2,413
Construction on Carroll at Bellemeade moving along. construction is moving slower than your typical suburban apartment complex. Its taken over 2 years. The most visible exterior changes that we have seen in weeks are the windows being installed in the apartments on the Eugene Street side and the glass being installed on the main entrance area of the Hyatt hotel. The big parking lot in the foreground in one of the photos below is a site being pitched to developers by Downtown Greensboro Inc. for high density residential. Construction on the ballpark office tower across the street will be well underway when Carroll at Bellemeade is complete. We should also see construction on the 8 story deck portion of/ Aloft mixed use tower across the street begin next year. The deck is projected to be completed by December 2018 and construction on the 20 story tower on top should begin shortly after for a 2020 Aloft hotel opening.









__________________
Greensboro, North Carolina (home of the Atlantic Coast Conference) population - 283,000

www.downtownstadium.org
Reply With Quote
     
     
  #22  
Old Posted Nov 10, 2017, 5:29 PM
urbanscraper's Avatar
urbanscraper urbanscraper is offline
Greensboro Rocks!
 
Join Date: Jun 2004
Location: Greensboro, NC
Posts: 2,413
City council will consider spending $28 million for a 6 story parking deck in which the 8 to 11 story Westin hotel will sit on top. The article also mentioned a similar agree with Roy Carroll's planned tower project across from the ballpark. An Aloft hotel will sit above the 8 story deck and the article mentions office and residential will be included in that tower. City documents show its a planned 20-story tower on top of an 8 story deck with street level retail and restaurants embedded in the deck. The deck will serve as a parking facilty for the tower above it, the future 9 story ballpark office tower across the street and the general public.

http://www.greensboro.com/news/local...c37ff9528.html
__________________
Greensboro, North Carolina (home of the Atlantic Coast Conference) population - 283,000

www.downtownstadium.org
Reply With Quote
     
     
  #23  
Old Posted Dec 13, 2017, 1:55 AM
urbanscraper's Avatar
urbanscraper urbanscraper is offline
Greensboro Rocks!
 
Join Date: Jun 2004
Location: Greensboro, NC
Posts: 2,413
Rendering of the Westin Greensboro. The 11-story hotel will sit atop a 6 story parking deck that will have streel level retail and restaurants. It was designed by CJMW Architecture of Winston-Salem.



Office building scheduled to open next year overlooking Greensboro's downtown ballpark.



8-story parking deck planned across the street from the ballpark and ballpark tower. Roy Carroll plans to build a 20-story mixed-use tower with an Aloft hotel on top of the deck.

__________________
Greensboro, North Carolina (home of the Atlantic Coast Conference) population - 283,000

www.downtownstadium.org
Reply With Quote
     
     
  #24  
Old Posted Dec 13, 2017, 11:49 PM
urbanscraper's Avatar
urbanscraper urbanscraper is offline
Greensboro Rocks!
 
Join Date: Jun 2004
Location: Greensboro, NC
Posts: 2,413
another rendering of the Westin Greensboro

__________________
Greensboro, North Carolina (home of the Atlantic Coast Conference) population - 283,000

www.downtownstadium.org
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 11:18 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2017, vBulletin Solutions, Inc.