Quote:
Originally Posted by sonysnob
Has anyone driven over the Nipigon River Bridge since September? Did they open all four lanes before the snow set in?
|
I'm not sure. I know that the twinning is 100% open from Red Rock 9 to Nipigon. I've not been past the turn-off into Nipigon in the last three weeks. I'll be up that way next week though and let you all know.
Note to those interested: Hydro line relocation work is continuing around Dorion and Ouimet, as well as in Hurkett. Also a home along 11-17 west of Pearl was removed in the last little bit as well - it was in the the planned highway right-of-way.