Quote:
Originally Posted by electricron
What was promised to the voters during the Measure M and Measure R referendums? Is Metro failing to build what was promised, or are proponents wishing to change the funding priorities from what was promised?
|
M and R were planned through entirely different-looking processes. R was unabashedly designed to fund the Purple Line Extension, and the expenditure plan put together by the Villaraigosa-era Metro Board was front loaded with unfunded projects from the LRTP to build a broader support base. Most projects included in R were nowhere near fully funded. Had the Great Recession not happened, or, had the federal legislature moved more aggressively on infrastructure stimulus in 2009, we might have been able to build more of the R program. But that didn't happen, so we tried Measure J, and that failed too.
M was put together by the COGs and subregions. COGs are joint powers authorities consisting of contiguous groups of cities (and parts of cities in LA's case), along with the ports, airports and some other entities. They operated as geographic blocs determining their needs within the constraint of a population-based dollar cap given to them by Metro. This "bottoms-up" approach, as Metro calls it, was meant to be more equitable and representative, despite the fact that it was fairly opaque, screwed Central and South LA (i.e. Places Where People Ride Transit), and elevated some of the least accountable public entities around.
The failure here is not that Metro is breaking promises, nor that people are expecting more than what was promised. It's that the COGs by and large were completely incurious about the region's transit needs. SGV, South Bay, Gateway Cities, all of them basically just threw money at whatever rail line they happened to know existed and shrugged. That's why we're getting the two-pronged Gold Line to nowhere and why the Green Line is still only going to Crenshaw Bl in Torrance.
Quote:
If the promises were not clear in the first place, maybe the voters should have rejected the Measures?
|
Yeah i mean.. it's a close call. Wait for something better or hope you can get 2/3 approval? I ended up voting yes personally even though I was not happy about the project list.