Posts: 321
Updated plans here: http://www.minneapolismn.gov/www/gro...msp-220990.pdf . Looks like a gain of 16' in height to a new height of 519'. Looks like a variety of modifications, most significantly losing 2 floors of hotel and gaining 2 floors of condos.

Renderings and elevations from the new plans:













Site today, 10/1:

Reply With Quote
     
     
  #122  
Old Posted Oct 3, 2019, 11:13 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
10/3.

You can see that they've removed the forms from the first level of walls for the north core. 1 down, 40 more levels to go for that core. Columns up on east side of parking garage, more pad and strip footings (or grade beams?) going in tying caissons together on the north and east sides of the site. The concrete structure near the center, east of the north core, is the elevator pit for the garage elevators. The southern core is a bit deeper than the north core, as it contains service elevators that go all the way down to the bottom level of the garage, while the north core does not.





Reply With Quote
     
     
  #123  
Old Posted Oct 8, 2019, 12:50 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
10/7.



Reply With Quote
     
     
  #124  
Old Posted Oct 10, 2019, 3:15 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
10/9.



Reply With Quote
     
     
  #125  
Old Posted Oct 12, 2019, 12:22 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
10/11.

Lots of progress along the perimeter. Bottom level of south core walls look ready to pour. Access ramp being dug out.


Last edited by MPLS_Const_Watch; Oct 12, 2019 at 12:32 AM.
Reply With Quote
     
     
  #126  
Old Posted Oct 15, 2019, 11:19 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
10/15.



Reply With Quote
     
     
  #127  
Old Posted Oct 19, 2019, 3:15 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
10/18.







Reply With Quote
     
     
  #128  
Old Posted Oct 24, 2019, 4:09 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
10/23.



Reply With Quote
     
     
  #129  
Old Posted Oct 26, 2019, 2:37 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
10/25.

Reply With Quote
     
     
  #130  
Old Posted Oct 29, 2019, 11:28 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
10/29.

\

Reply With Quote
     
     
  #131  
Old Posted Oct 31, 2019, 10:48 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
10/31.



Reply With Quote
     
     
  #132  
Old Posted Nov 8, 2019, 1:38 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
11/6.

Reply With Quote
     
     
  #133  
Old Posted Nov 14, 2019, 11:12 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
11/14.

Reply With Quote
     
     
  #134  
Old Posted Nov 19, 2019, 12:36 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
11/18.

Reply With Quote
     
     
  #135  
Old Posted Nov 20, 2019, 4:03 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
The new webcam for the 240 Hennepin project provides a decent view of this project site across the street: https://app.oxblue.com/open/CA/240-Hennepin
Reply With Quote
     
     
  #136  
Old Posted Nov 23, 2019, 2:01 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
11/22.

Big pour on the 2nd garage level today.



Reply With Quote
     
     
  #137  
Old Posted Nov 26, 2019, 12:59 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
11/25.

Reply With Quote
     
     
  #138  
Old Posted Dec 3, 2019, 12:46 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
12/2.

North core has been raised again and is now fully above street level.







Reply With Quote
     
     
  #139  
Old Posted Dec 6, 2019, 2:27 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
12/5.



Reply With Quote
     
     
  #140  
Old Posted Dec 11, 2019, 4:28 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 321
12/10:



Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 12:47 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2020, vBulletin Solutions, Inc.