HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia


Reply

 
Thread Tools Display Modes
     
     
  #1081  
Old Posted Feb 1, 2019, 7:37 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,236
Quote:
Originally Posted by 240glt View Post
Doesn’t the shoulder turn into a de facto third lane during peak congestion anyways ? It’s been a while since I drove from the valley into Vancouver but I seem to remember drivers peeling down the shoulder when the TCH is all backed up
They already do? Oh no...
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #1082  
Old Posted Feb 1, 2019, 11:30 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 39,153
a video of the new Malahat

Video Link
__________________
belowitall
Reply With Quote
     
     
  #1083  
Old Posted Feb 1, 2019, 11:47 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 39,153
McKenzie Interchange, looking better

Video Link
__________________
belowitall
Reply With Quote
     
     
  #1084  
Old Posted Mar 13, 2019, 12:29 AM
Glacier Glacier is offline
Registered User
 
Join Date: May 2010
Location: BC
Posts: 135
Quote:
Originally Posted by Dengler Avenue View Post
"Any time a decision becomes politicized then it is being made for the wrong reasons."

That has already happened though. For instance, the project to widen TCH between Pritchard and Chase has been delayed to this year (when it was supposed to begin last year). From what I saw on the most recent google street view, the widening is badly needed.
The NDP is NFG. There are no new projects coming any time soon, and the ones on the books are being delayed. Same thing happened in the 1990s.
Reply With Quote
     
     
  #1085  
Old Posted Mar 27, 2019, 5:34 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
New cable ferry deployed on Kootenay Lake between Longbeach and Harrop

https://www.nelsonstar.com/local-new...kootenay-lake/
__________________
Short term pain for long term gain
Reply With Quote
     
     
  #1086  
Old Posted Mar 29, 2019, 6:49 PM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 6,757
Re-announcement of a long delayed project ?
http://https://globalnews.ca/news/5108787/trans-canada-highway-funding-improvements-bc/

Kind of funny how they describe it as a "Massive" funding announcement.
Reply With Quote
     
     
  #1087  
Old Posted Mar 29, 2019, 7:47 PM
Corndogger Corndogger is offline
Registered User
 
Join Date: Sep 2007
Location: Calgary
Posts: 7,727
Quote:
Originally Posted by craner View Post
Re-announcement of a long delayed project ?
http://https://globalnews.ca/news/5108787/trans-canada-highway-funding-improvements-bc/

Kind of funny how they describe it as a "Massive" funding announcement.
It's stuff like this that makes me cringe when people say AB should reduce it's spending on infrastructure to BC levels. $71.5 million is pretty minor for highway projects.
Reply With Quote
     
     
  #1088  
Old Posted Mar 30, 2019, 6:38 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 6,757
^Who is saying Alberta shout cut it's spending on infrastructure ?
Reply With Quote
     
     
  #1089  
Old Posted Mar 30, 2019, 6:55 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 16,837
Quote:
Originally Posted by craner View Post
Re-announcement of a long delayed project ?
http://https://globalnews.ca/news/5108787/trans-canada-highway-funding-improvements-bc/

Kind of funny how they describe it as a "Massive" funding announcement.
From the best of my knowledge this is a newer project, but agree with the small scales.

Any highway 1 project should at least be 10km in length and preferably 50km or so in length. At least that would be a far more realistic timeframe for actually completing it in our lifetimes. This goes for the federal government as well through the national parks.

No more 2km and 4km long projects.

And what happened to the interchange in Golden as part of phase 5 on the Kicking Horse project?

I don’t understand why we can’t build a highway like we did with the Coquihalla and the Okanagan Connector (Hell, even the Island Highway was over 100km of new 4 lane divided highway I believe).
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/306346...h/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0...lhxXFxuAey_q6Q
Reply With Quote
     
     
  #1090  
Old Posted Mar 30, 2019, 7:06 AM
Corndogger Corndogger is offline
Registered User
 
Join Date: Sep 2007
Location: Calgary
Posts: 7,727
Quote:
Originally Posted by craner View Post
^Who is saying Alberta shout cut it's spending on infrastructure ?
People who claim AB could cut it's deficit by lowering our per capita spending to BC levels. I don't think we're overspending, BC is grossly under spending.
Reply With Quote
     
     
  #1091  
Old Posted Mar 30, 2019, 5:53 PM
che4ef's Avatar
che4ef che4ef is offline
Registered User
 
Join Date: Aug 2018
Location: Vancouver
Posts: 17
Corndogger
Quote:
I don't think we're overspending, BC is grossly under spending.
I will go even further - BC is not spending at all. I live near Vancouver and commute to my work in downtown. There are projects along the way that are "under way" in the last 10-15 years. I live in one of the cites north side of Fraser river and just now in the last ... perhaps 10 yers there is major road project. Not started by NDP, but liberals. NDP is just completing. It is very disappointing that this government is not spending anything on the infrastructure. It is disturbing. Few projects that are supposed to be done are either cut or not started. Maple Ridge Haney Bypass, Maple Ridge to Mission widening to 4 lines. It is just one portion done. I hope they will start the other one right after. Highway 1 widening from Langley originally is from 200 to 232 and now is to 216 with new overpass. Cut by NDP. There were plans underway for widening to Abbotsford but everything stalled again under NDP. All this infrastructure projects are fallout from the previous government. Don`t get me even started about Massey Tunnel here. It is not going to happen in the next 2 years, may be longer. The jams are enormous. Rant can go on and on.
We need federal highway program.
Reply With Quote
     
     
  #1092  
Old Posted Mar 30, 2019, 6:05 PM
che4ef's Avatar
che4ef che4ef is offline
Registered User
 
Join Date: Aug 2018
Location: Vancouver
Posts: 17
https://www.abbynews.com/news/federa...fraser-valley/

Quote:
“At the end of the day, this is something for the province of B.C. to decide, obviously in consultation with the local community.”

For years the widening of the highway to Abbotsford has been discussed, but the plan has stalled under the NDP government.
Abbotsford News. Recent article.
I am working already on my flying superpowers, because it will be the only way to move around very soon.
Reply With Quote
     
     
  #1093  
Old Posted Mar 31, 2019, 7:26 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 6,757
Quote:
Originally Posted by Metro-One View Post
From the best of my knowledge this is a newer project, but agree with the small scales.

Any highway 1 project should at least be 10km in length and preferably 50km or so in length. At least that would be a far more realistic timeframe for actually completing it in our lifetimes. This goes for the federal government as well through the national parks.

No more 2km and 4km long projects.

And what happened to the interchange in Golden as part of phase 5 on the Kicking Horse project?

I don’t understand why we can’t build a highway like we did with the Coquihalla and the Okanagan Connector (Hell, even the Island Highway was over 100km of new 4 lane divided highway I believe).
Agree whole heartedly.
Reply With Quote
     
     
  #1094  
Old Posted Mar 31, 2019, 7:28 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 6,757
Quote:
Originally Posted by che4ef View Post
Corndogger I will go even further - BC is not spending at all. I live near Vancouver and commute to my work in downtown. There are projects along the way that are "under way" in the last 10-15 years. I live in one of the cites north side of Fraser river and just now in the last ... perhaps 10 yers there is major road project. Not started by NDP, but liberals. NDP is just completing. It is very disappointing that this government is not spending anything on the infrastructure. It is disturbing. Few projects that are supposed to be done are either cut or not started. Maple Ridge Haney Bypass, Maple Ridge to Mission widening to 4 lines. It is just one portion done. I hope they will start the other one right after. Highway 1 widening from Langley originally is from 200 to 232 and now is to 216 with new overpass. Cut by NDP. There were plans underway for widening to Abbotsford but everything stalled again under NDP. All this infrastructure projects are fallout from the previous government. Don`t get me even started about Massey Tunnel here. It is not going to happen in the next 2 years, may be longer. The jams are enormous. Rant can go on and on.
We need federal highway program.
It's really so frustrating that national highway infrastructure is such a low priority on a federal level.
Reply With Quote
     
     
  #1095  
Old Posted Apr 1, 2019, 3:06 PM
DoubleK DoubleK is offline
Near Generational
 
Join Date: Sep 2011
Location: Calgary
Posts: 1,447
I don't know if I would trust the Feds to get highways right.
Reply With Quote
     
     
  #1096  
Old Posted Apr 1, 2019, 6:29 PM
Corndogger Corndogger is offline
Registered User
 
Join Date: Sep 2007
Location: Calgary
Posts: 7,727
Quote:
Originally Posted by DoubleK View Post
I don't know if I would trust the Feds to get highways right.
The feds don't need to design the roads just help fund them like they do in the U.S. along with setting some standards. At a minimum highways that makeup the national system should be four lanes, divided and with limited access. And no frickin' lights! This is easily doable if we make it a priority.
Reply With Quote
     
     
  #1097  
Old Posted Apr 2, 2019, 11:11 PM
Mazrim's Avatar
Mazrim Mazrim is offline
Registered User
 
Join Date: Aug 2009
Location: Calgary, Alberta
Posts: 1,403
Quote:
Originally Posted by Corndogger View Post
At a minimum highways that makeup the national system should be four lanes, divided and with limited access. And no frickin' lights! This is easily doable if we make it a priority.
I don't really agree with you. The feds should be offering funding to smartly designed alternatives that reduce costs and footprints. What works on the prairies or in the maritimes won't work in the shield and mountains. In mountainous terrain, you should want the narrowest cross section of road that moves traffic safely at high speeds given the challenges of the area you're working in. If you need a few signals to save tens of millions of dollars, you do it. Doing it this way would be way more easy to do given that money is a huge consideration, despite what you've said.

We shouldn't be building roads like we did in the past. It's not sustainable. If you want to see what happens when you try to set one standard for entire road type, you should see the complexities and costs to build I-70 through Colorado and Utah.
Reply With Quote
     
     
  #1098  
Old Posted Apr 3, 2019, 12:46 AM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,499
In a world with infinite money, I'd agree with corndogger, but in a world where money is limited I agree with Mazrim. The problem really though is there just isn't enough money and it is unfair to assign the costs of the TCH to where it is geographically located. It's a national highway, so it should be adequately funded by the federal government, and since BC and Ontario's sections are much more expensive to build they should get proportionally more from the national pot, and Manitoba and Saskatchewan proportionally less.
Reply With Quote
     
     
  #1099  
Old Posted Apr 3, 2019, 2:56 AM
Corndogger Corndogger is offline
Registered User
 
Join Date: Sep 2007
Location: Calgary
Posts: 7,727
Quote:
Originally Posted by milomilo View Post
In a world with infinite money, I'd agree with corndogger, but in a world where money is limited I agree with Mazrim. The problem really though is there just isn't enough money and it is unfair to assign the costs of the TCH to where it is geographically located. It's a national highway, so it should be adequately funded by the federal government, and since BC and Ontario's sections are much more expensive to build they should get proportionally more from the national pot, and Manitoba and Saskatchewan proportionally less.
I didn't say anything about the funding have to be equal but the minimal design standards have to be the same everywhere. Canada's not the only nation that has rugged terrain and we do have the money to build roads to the standards I've set.
Reply With Quote
     
     
  #1100  
Old Posted Apr 3, 2019, 6:18 PM
Mazrim's Avatar
Mazrim Mazrim is offline
Registered User
 
Join Date: Aug 2009
Location: Calgary, Alberta
Posts: 1,403
Quote:
Originally Posted by Corndogger View Post
and we do have the money to build roads to the standards I've set.
Since when...? The federal government has been throwing lots of money at public transit (and rightly so), so I'm not sure where all this money for your freeway standard is coming from.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia
Forum Jump



Forum Jump


All times are GMT. The time now is 10:11 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.