Pics by me today of The Bay awning removal on Seymour Street.
I'm not sure why they are removing sections of the terra cotta tile from the pilasters -
but I suspect it's for a new lighting system for the facade (since the old one was on the awning).
Sections of the terra cotta tile on the pilasters are also be removed on the Georgia frontage too -
but the parts removed on Seymour seem really low down from the columns/pilasters above.
Also - inside the store, men's suits and dress shirts etc. have moved to the concourse level -
until the 6th floor opens in October according to the sales clerks. The basement level is largely empty.
The entrance to topShop/TopMan is boarded up inside the store
and it is located to the south of the existing scissor escalators from Pacific Centre.
So if the TopShop/TopMan escaltors are also open concept -
that'll be an expansive escalator vestibule area with 3 banks side by side by side.
I could see 2 Bloomingdale entrances flanking the SkyTrain entrance:
.
Uploaded with
ImageShack.us
Uploaded with
ImageShack.us
Uploaded with
ImageShack.us
Uploaded with
ImageShack.us