^pretty weird indeed, right between two buildings!

Looks like a disaffected freight line, maybe it was re-used just for the ION delivery:

https://www.google.ca/maps/@43.46435...7i13312!8i6656
Reply With Quote
     
     
  #1522  
Old Posted Dec 22, 2017, 9:43 PM
Beedok Beedok is offline
Exiled Hamiltonian Gal
 
Join Date: Jun 2012
Posts: 6,801
Quote:
Originally Posted by caltrane74 View Post
Yonge and Eglinton LRT Construction

A midtown transportation core is developing.


Is there much happening around Eglinton West/Cedarville?
Reply With Quote
     
     
  #1523  
Old Posted Dec 22, 2017, 10:35 PM
GeneralLeeTPHLS's Avatar
GeneralLeeTPHLS GeneralLeeTPHLS is offline
Midtowner since 2K
 
Join Date: Aug 2015
Location: Midtown Toronto
Posts: 5,358
Quote:
Originally Posted by Beedok View Post
Is there much happening around Eglinton West/Cedarville?
I passed by there on the Eglinton bus, they're doing a lot of work....not to this extent though. Good amount of closed off areas in the streets, but I didn't see any pits of this size.
__________________
"Living life on the edge"
Reply With Quote
     
     
  #1524  
Old Posted Dec 22, 2017, 10:39 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,166
This pic very old,they have put in the permanent I-Beams/Steel girders now. And it is beginning to look like an actual subway station.
Reply With Quote
     
     
  #1525  
Old Posted Dec 24, 2017, 8:52 PM
David1gray's Avatar
David1gray David1gray is offline
Registered User
 
Join Date: Jan 2010
Location: Calgary, AB
Posts: 739
Quote:
Originally Posted by SkahHigh View Post
^pretty weird indeed, right between two buildings!

Looks like a disaffected freight line, maybe it was re-used just for the ION delivery:

https://www.google.ca/maps/@43.46435...7i13312!8i6656
This line is the Goderich & Exeter Railway's Waterloo Spur, and runs all the way to Elmira. The line is still in use regularly, and closer to Elmira/St. Jacobs is where the Waterloo Central Railway operates their steam trains.

Signage maybe out of view, or not put back in place yet due to LRT construction. Street view shows that prior to LRT construction the intersection was protected only by crossbucks.
Reply With Quote
     
     
  #1526  
Old Posted Jan 12, 2018, 3:21 PM
Horus's Avatar
Horus Horus is offline
I ask because I Gatineau
 
Join Date: Jul 2013
Location: Aylmer (by way of GTA)
Posts: 1,161
Full LRT route testing is now underway in KW



From the Record...

Quote:
Ion begins testing light rail vehicles over entire route

by Catherine Thompson, Waterloo Region Record



WATERLOO REGION — People in Kitchener and Waterloo may get their first glimpse of Ion light rail vehicles on tracks out in the community as the system begins testing along the entire 19-kilometre route.

LRT workers were testing a vehicle Thursday afternoon between the light rail storage facility on Dutton Drive and Conestoga Mall in Waterloo, said TJ Flynn, a spokesperson for the Region of Waterloo.

Over the next week or so, the vehicles will venture beyond Waterloo, and travel the length of the system and past all 19 stops, between Conestoga Mall and Fairview Park mall, said regional Coun. Tom Galloway.

"This is a bit of a milestone for people, whether they're ambivalent about the LRT or they're supporters, to actually see the units on the tracks," he said. "Everybody saw the construction and now when you see a unit running on it, it really does bring it home that it's actually now going to be happening."

For most people, it will be the first chance to see the vehicles, and to get a sense of how big they are and how much space they take up as they move through city streets, he said.

Each vehicle is about 30 metres long with five separate sections. "They're pretty impressive units. This is the unit you're going to be seeing if you're walking or cycling or driving along the route. You'll be able to see the physical presence of it, and get a sense of its size and shape."

The tests will begin without power, with the Ion vehicles being towed, to make sure the entire system — tracks, platforms, switches, signs and light standards — was built with enough clearances for rail cars to travel easily in both directions. Once clearance tests are successfully completed, vehicles will begin to travel the system under their own power, Galloway said.

These tests mark the first time that the LRT will be travelling alongside cyclists, pedestrians and vehicles in the community.

People will need to pay more attention, since the trains will be crossing roads at several intersections, and signal lights and gates will be activating when trains approach.

"A lot of people drive on autopilot, and the signals haven't been operational for the last six months since they were installed," Galloway said. "All of a sudden you're driving down Courtland or along Erb and they're going to go off and the gates are going to come down."

Anyone who's got into the habit of parking on the tracks will have to find somewhere else to park, since there's now the very real possibility that a train will be coming along those tracks. Bylaw officers will be enforcing the parking ban more strictly; vehicles parked on tracks will be towed and subject to a $40 fine.

"It'll be fairly random. Nobody's going to be putting a sign up saying, 'Today the train is coming along this section,' " Galloway said.

Testing has been progressing slowly. In November, it began with a vehicle being pushed slowly through Waterloo by another vehicle, while an escort of workers walked along beside it to make sure there was enough clearance for the vehicle. Just before Christmas, the first powered tests took place just outside the Dutton Drive storage facility.

Testing will advance throughout winter and spring and will continue until service starts. As testing progresses, the light rail vehicles will travel more quickly until they begin to test at the speeds they will normally run at when they're in service — 50 km/h in urban areas and 70 km/h in track areas, such as the Waterloo Spur Line.

Each of the 14 cars must log 600 hours of operation on the system before it's deemed ready for service, so more and more cars will be going up and down the tracks over the next few months, Galloway said. Bombardier is completing one new vehicle about every 15 days, he added.

The light rail system is about six months behind the original launch date due to construction delays and repeated problems with Bombardier's vehicle production, but officials are still aiming for the service to start sometime this spring.

More information can be found at rideion.ca.
Reply With Quote
     
     
  #1527  
Old Posted Mar 19, 2018, 2:55 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
The first official construction site for the REM is underway (Rive-Sud station site prep)

There is a Works Info page which will eventually become very useful:https://rem.info/en/works-info

Last edited by SkahHigh; Aug 19, 2018 at 9:53 PM.
Reply With Quote
     
     
  #1528  
Old Posted Aug 17, 2018, 10:59 PM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 600
Bump, since I'm seeing lists and construction updates elsewhere...

Confederation Line is supposed to be done November 2018 and ION in early December.

Funding secured (i.e. planned) for YVR's Broadway Subway, Surrey streetcar, Ottawa Stage 2 Extensions, Ottawa Trillium Line, as well as YEG's Valley Line West now too. Bloor-Danforth Extension is supposed to be 3 stations now and won't be tendered in 2018 with 30% design due Q1 2019. What's going on with Finch West - is it going to be cancelled by DoFo somehow after contract award?
Reply With Quote
     
     
  #1529  
Old Posted Aug 18, 2018, 1:43 PM
Razor Razor is offline
Registered User
 
Join Date: Jul 2011
Location: Ottawa
Posts: 2,944
I don't know if anyone has mentioned this one here already, but this project for Ottawa is kind of going under the radar due to The Light rail under construction right now over shadowing it..It's a huge sewer project worth 232 million, and one line (North South Tunnel)just got competed this week..There's still the EWT which will start in a few months once the they dissemble the tunnel boring equipment, and move it to the other site..Lots of infrastructure going on for Ottawa right now, and with the Lebreton flats re-development happening in a few years (new arena), there are some big projects coming down the pipe including a few towers, and of course the next phase(s) of the light rail.

https://ottawa.ca/en/city-hall/publi...ge-tunnel-csst

Some pdf images of tunnel line here:

https://documents.ottawa.ca/sites/do...sst_map_en.pdf

Last edited by Razor; Aug 18, 2018 at 2:15 PM.
Reply With Quote
     
     
  #1530  
Old Posted Aug 18, 2018, 5:20 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 11,486
Quote:
Originally Posted by ClaytonA View Post
Bump, since I'm seeing lists and construction updates elsewhere...

Confederation Line is supposed to be done November 2018 and ION in early December.

Funding secured (i.e. planned) for YVR's Broadway Subway, Surrey streetcar, Ottawa Stage 2 Extensions, Ottawa Trillium Line, as well as YEG's Valley Line West now too. Bloor-Danforth Extension is supposed to be 3 stations now and won't be tendered in 2018 with 30% design due Q1 2019. What's going on with Finch West - is it going to be cancelled by DoFo somehow after contract award?
Finch west is still happening. It reached financial close before Doug came in which means there would be huge financial penalties to cancel it. Prep work is still underway - full construction should begin soon.
Reply With Quote
     
     
  #1531  
Old Posted Aug 19, 2018, 9:55 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
First pillar for the REM is up - it will be part of the elevated section to cross over the A10 to Rive-Sud Station and the maintenance facility:


by Philippe on mtlurb
Reply With Quote
     
     
  #1532  
Old Posted Aug 19, 2018, 10:25 PM
gunnar777 gunnar777 is offline
Registered User
 
Join Date: Aug 2013
Posts: 234
Quote:
Originally Posted by Innsertnamehere View Post
Finch west is still happening. It reached financial close before Doug came in which means there would be huge financial penalties to cancel it. Prep work is still underway - full construction should begin soon.
Hopefully Mammoliti will be out after the election. Finch West is probably going ahead but we can't underestimate the will of the PCs to cancel transit projects.
A recent good read, btw: https://www.theglobeandmail.com/cana...-needs-to-end/
Reply With Quote
     
     
  #1533  
Old Posted Aug 20, 2018, 4:18 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 39,083
__________________
belowitall
Reply With Quote
     
     
  #1534  
Old Posted Aug 22, 2018, 7:00 PM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 600
https://www.newswire.ca/news-release...691374421.html

Quote:
... There are several informational tools in place to monitor work progress, including a website that is updated daily, work notices, a telephone line, a newsletter and SMS alerts.

The REM's Community Relations Office will also hold various activities this fall to proactively and regularly inform communities affected of upcoming work in their sectors, before it begins.

In terms of [using] public transit, downloading the Chrono application will provide users with all of the information they need to travel efficiently by train, bus or metro. ...
Could be a transformative project like Skytrain in YVR for land use intensity.
Reply With Quote
     
     
  #1535  
Old Posted Aug 22, 2018, 7:14 PM
p_xavier p_xavier is offline
Registered User
 
Join Date: Dec 2006
Posts: 3,568
Quote:
Originally Posted by ClaytonA View Post
https://www.newswire.ca/news-release...691374421.html



Could be a transformative project like Skytrain in YVR for land use intensity.
First time they called the REM a metro in English. They've been using it in French since April.
Reply With Quote
     
     
  #1536  
Old Posted Sep 18, 2018, 5:33 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Some REM construction updates

Édouard-Montpetit station - east station building is demolished, shoring and excavation about to get underway



CDPQ Infra

Pillars along the A10 to cross over the A10/A30 interchange



by Bad_Monday on mtlurb

Last edited by SkahHigh; Sep 18, 2018 at 8:31 PM.
Reply With Quote
     
     
  #1537  
Old Posted Oct 6, 2018, 5:31 AM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 600
https://web.archive.org/web/20181006...olonne-rem.jpg

via translate
Quote:
The route of the Metropolitan Express Network (REM) takes shape on the South Shore. Six columns were installed at the intersection of Highways 10 and 30. ...

The reconfiguration of Highway 10 in a westerly direction will soon begin construction of the future Quartier station.

A new ramp for buses will be built this fall near the Chevrier tunnel, in anticipation of its demolition in spring-summer 2019. ...

This fall, two pillars of the future structure will be built on avenue Malo and boul. Leduc, one after the other. As the pillars will obstruct roadways, a slight realignment of these roads is also needed. ...
https://www.lecourrierdusud.ca/erect...em-a-brossard/
Reply With Quote
     
     
  #1538  
Old Posted Oct 6, 2018, 5:38 AM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 600
Renders for Technoparc Station

https://rem.info/en/news/future-station-technoparc



Like the wood it's a warm material. Renders don't show the lighting (other than daylighting); could this feel dark with the glazing at night?
Reply With Quote
     
     
  #1539  
Old Posted Oct 6, 2018, 10:58 AM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
^render for the Technoparc station was released as well yesterday:


https://rem.info/fr/actualites/futur...ion-technoparc
Reply With Quote
     
     
  #1540  
Old Posted Oct 10, 2018, 9:57 PM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 600


From twitter

via translate; In Saint-Eustache, the construction of a temporary garage for exo trains will convert the permanent maintenance center and make it compatible with EMU cars
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 8:27 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.