HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin


Reply

 
Thread Tools Display Modes
     
     
  #2221  
Old Posted Mar 13, 2024, 1:02 PM
Novacek Novacek is offline
Registered User
 
Join Date: Jan 2013
Posts: 2,511
Quote:
Originally Posted by H2O View Post
That line crosses the Red Line at McNeil, Texas. With an extension of the overpass and a switched junction, commuter rail could extend to Downtown via the Red Line corridor.
Sure, but between 79 and the McNeil junction it runs right through the middle of Round Rock. And then once you're at the junction, you're at the red line, which is already capacity/time slot constrained (at least during commuting hours).

You could do it, but it's going to require a lot more than some parallel tracks alongside 79. You're probably still left needing to share the existing UP tracks between 79 and McNeil, and probably need to fully double track the red line at that point.

though you probably don't actually need any new infrastructure at the McNeil junction. I'm pretty sure freight can already switch from the UP tracks to the red line there.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin
Forum Jump



Forum Jump


All times are GMT. The time now is 9:17 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.