Here are two photos I took today, of course I decided to wait all day to take them so the sun was going down. The exterior is pretty much done, cladding still has to be placed on the north end of the top two floors I think this is suppose to give it an all glass look.
Another interesting point is that the other building base as been sealed off. This fall the garage level had no roof on it and all the columns were exposed and this is where all the "flyers", the bracing system used to form the floors were all stored in the garage. So now as the second photo shows, the main floor has been poured. It seems work will not start at least for the winter because none of the development length (rebar overlap between floors) is exposed for the columns, suggesting more floors will not be poured above this level for the time being. There is however a hole covered over by plywood which I would suspect is the opening for the crane base, so that is a good sign.