HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southwest


Reply

 
Thread Tools Display Modes
     
     
  #81  
Old Posted Dec 27, 2017, 10:34 PM
dtnphx dtnphx is offline
BANNED
 
Join Date: Jun 2009
Posts: 1,057
Quote:
Originally Posted by gymratmanaz View Post
I wish there was a way to have recorded it.....7:17AM about 8 construction guys in a circle all doing stretches and toe touches together. It was kinda cute to see.
Circle jerk.
Reply With Quote
     
     
  #82  
Old Posted Dec 27, 2017, 11:21 PM
nickw252 nickw252 is offline
Registered User
 
Join Date: Dec 2010
Location: North Mesa
Posts: 1,631
Quote:
Originally Posted by gymratmanaz View Post
I wish there was a way to have recorded it.....7:17AM about 8 construction guys in a circle all doing stretches and toe touches together. It was kinda cute to see.
I have a family member who worked for ISEC on the Sky Harbor Terminal 3 expansion - he said they did stretches every morning. Agreed - probably insurance/safety related.
Reply With Quote
     
     
  #83  
Old Posted Dec 28, 2017, 9:44 PM
CrestedSaguaro's Avatar
CrestedSaguaro CrestedSaguaro is offline
Modulator
 
Join Date: Nov 2013
Location: Phoenix, AZ
Posts: 4,394
Hole is almost dug for the tower crane base. Concrete should be poured soon and the crane should go up after 1st week of 2018. Good times!
__________________
Ronnie Garrett
https://skyscraperpage.com/diagrams/?memberID=205
Reply With Quote
     
     
  #84  
Old Posted Jan 3, 2018, 11:01 PM
fawd fawd is offline
Registered User
 
Join Date: Mar 2017
Posts: 565
I spy with my little eye... a large concrete platform.
Reply With Quote
     
     
  #85  
Old Posted Jan 3, 2018, 11:24 PM
CrestedSaguaro's Avatar
CrestedSaguaro CrestedSaguaro is offline
Modulator
 
Join Date: Nov 2013
Location: Phoenix, AZ
Posts: 4,394
Quote:
Originally Posted by fawd View Post
I spy with my little eye... a large concrete platform.
I was down there talking to the crew this afternoon. The large concrete slab is the elevator base. There is another whole dug just to the North of that slab that will be for the tower crane. They will be pouring the tower crane base next and then the crane should be late next week or early the week after. I plan on watching this crane go up. I'll be bringing a picnic basket and staying for the day.
__________________
Ronnie Garrett
https://skyscraperpage.com/diagrams/?memberID=205
Reply With Quote
     
     
  #86  
Old Posted Jan 4, 2018, 12:38 AM
gymratmanaz gymratmanaz is offline
Registered User
 
Join Date: Aug 2007
Posts: 2,914
When you do, wave at the camera RonnieFoos!
Reply With Quote
     
     
  #87  
Old Posted Jan 4, 2018, 10:00 PM
CrestedSaguaro's Avatar
CrestedSaguaro CrestedSaguaro is offline
Modulator
 
Join Date: Nov 2013
Location: Phoenix, AZ
Posts: 4,394
Tower crane base is getting installed today
__________________
Ronnie Garrett
https://skyscraperpage.com/diagrams/?memberID=205
Reply With Quote
     
     
  #88  
Old Posted Jan 4, 2018, 11:11 PM
CrestedSaguaro's Avatar
CrestedSaguaro CrestedSaguaro is offline
Modulator
 
Join Date: Nov 2013
Location: Phoenix, AZ
Posts: 4,394
I missed this because it was sandwiched between an onslaught of wind turbine submissions. Tower crane height will go up to 400'.

Quote:
Overview

Study (ASN): 2017-AWP-11975-OE
Prior Study:
Status: Work In Progress


Received Date: 11/14/2017
Entered Date: 11/14/2017
Map: View Map

Construction Info Structure Summary

Notice Of: CONSTR
Duration: TEMP (Months: 12 Days: 0)
Work Schedule: 12/19/2017 to 12/19/2018


Structure Type: Crane
Structure Name: UEB - Stafford Crane - Project Delta
FCC Number:


Structure Details Height and Elevation

Latitude (NAD 83): 33° 27' 21.05" N
Longitude (NAD 83): 112° 04' 10.59" W
Datum: NAD 83
City: Phoenix
State: AZ
Nearest County: Maricopa


Proposed

Site Elevation:
1086

Structure Height:
400

Total Height (AMSL):
1486

https://oeaaa.faa.gov/oeaaa/external...49136226&row=3
__________________
Ronnie Garrett
https://skyscraperpage.com/diagrams/?memberID=205
Reply With Quote
     
     
  #89  
Old Posted Jan 9, 2018, 1:00 AM
fawd fawd is offline
Registered User
 
Join Date: Mar 2017
Posts: 565
I spy with my little eye.

The base of a crane.

Reply With Quote
     
     
  #90  
Old Posted Jan 9, 2018, 3:52 PM
gymratmanaz gymratmanaz is offline
Registered User
 
Join Date: Aug 2007
Posts: 2,914
I spy with my little eye.... rebar footings around the perimeter of the building.
Reply With Quote
     
     
  #91  
Old Posted Jan 10, 2018, 3:34 PM
gymratmanaz gymratmanaz is offline
Registered User
 
Join Date: Aug 2007
Posts: 2,914
Camera down!
Reply With Quote
     
     
  #92  
Old Posted Jan 10, 2018, 4:34 PM
nickw252 nickw252 is offline
Registered User
 
Join Date: Dec 2010
Location: North Mesa
Posts: 1,631
Looks like the crane is going up today.
Reply With Quote
     
     
  #93  
Old Posted Jan 10, 2018, 4:40 PM
biggus diggus biggus diggus is offline
Registered User
 
Join Date: Mar 2015
Posts: 2,838
Just walked by, it is going up.

The reason I was walking over there is to try a place called Fillmore Coffee. Nice place, good atmosphere. The coffee is pretty average but I can see it being a good place to get some work done.
__________________
Mr. K the monopoly man
Reply With Quote
     
     
  #94  
Old Posted Jan 10, 2018, 5:54 PM
CrestedSaguaro's Avatar
CrestedSaguaro CrestedSaguaro is offline
Modulator
 
Join Date: Nov 2013
Location: Phoenix, AZ
Posts: 4,394
Are the tower crane pieces already there? It looks like it's the mobile crane. I'm thinking the tower crane will go up over the weekend.
__________________
Ronnie Garrett
https://skyscraperpage.com/diagrams/?memberID=205
Reply With Quote
     
     
  #95  
Old Posted Jan 10, 2018, 5:57 PM
Obadno Obadno is offline
Registered User
 
Join Date: Jan 2010
Posts: 6,592
Quote:
Originally Posted by RonnieFoos View Post
Are the tower crane pieces already there? It looks like it's the mobile crane. I'm thinking the tower crane will go up over the weekend.
if you look on the webcam the top of the crane is currently assembled
Reply With Quote
     
     
  #96  
Old Posted Jan 10, 2018, 6:28 PM
CrestedSaguaro's Avatar
CrestedSaguaro CrestedSaguaro is offline
Modulator
 
Join Date: Nov 2013
Location: Phoenix, AZ
Posts: 4,394
All I see is the mobile crane. It will be assembled first and then it will used to put up the tower crane.

Edit: Let me rephrase that. Instead of mobile crane, I'll use "temp" crane". That's what's going up right now.
__________________
Ronnie Garrett
https://skyscraperpage.com/diagrams/?memberID=205
Reply With Quote
     
     
  #97  
Old Posted Jan 10, 2018, 7:26 PM
fawd fawd is offline
Registered User
 
Join Date: Mar 2017
Posts: 565
We're going to need a wider lens on this camera!
Reply With Quote
     
     
  #98  
Old Posted Jan 10, 2018, 7:50 PM
gymratmanaz gymratmanaz is offline
Registered User
 
Join Date: Aug 2007
Posts: 2,914
We're gonna need a bigger boat!
Reply With Quote
     
     
  #99  
Old Posted Jan 10, 2018, 7:52 PM
gymratmanaz gymratmanaz is offline
Registered User
 
Join Date: Aug 2007
Posts: 2,914
I see 2 actual tower crane sections on site!!!!!! Both temp cranes are up and running, but in the lower left corner of the CAM, there is one on the ground and another on a truck!!!
Reply With Quote
     
     
  #100  
Old Posted Jan 10, 2018, 8:01 PM
gymratmanaz gymratmanaz is offline
Registered User
 
Join Date: Aug 2007
Posts: 2,914
truck #3 and Crane piece #3!!!! They are unloading and stacking them up for later assembly. FUN TO WATCH!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southwest
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 9:12 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.