HomeDiagramsDatabaseMapsForumSkyscraper Posters
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Highrise Construction

Reply

 
Thread Tools Display Modes
     
     
  #1361  
Old Posted May 6, 2017, 8:57 AM
kolchak kolchak is offline
Registered User
 
Join Date: Mar 2008
Location: California
Posts: 181
Reply With Quote
     
     
  #1362  
Old Posted May 7, 2017, 9:45 AM
SolarWind's Avatar
SolarWind SolarWind is offline
Chicago
 
Join Date: Jun 2006
Posts: 2,651
May 3, 2017

Reply With Quote
     
     
  #1363  
Old Posted May 8, 2017, 1:36 AM
BVictor1's Avatar
BVictor1 BVictor1 is offline
Registered User
 
Join Date: Sep 2002
Location: Chicago
Posts: 8,605
05/04/17




05/05/17




05/06/17
__________________
titanic1
Reply With Quote
     
     
  #1364  
Old Posted May 10, 2017, 7:34 PM
Streeter Streeter is online now
Registered User
 
Join Date: May 2015
Posts: 10
Quote:
Originally Posted by KWILLSKYLINE View Post
Sweet picture Streeter. This ones is starting to move. From the view of that picture it should be above 500 LSD by mid to late june?


I would think so. Here is an updated snap from Sunday. This was taken exactly 14 days after my first photo, so it appears it is at about a 1-1.5 floors per week cadence.
Reply With Quote
     
     
  #1365  
Old Posted May 11, 2017, 3:55 PM
joeg1985 joeg1985 is offline
Registered User
 
Join Date: Sep 2012
Location: Chicago
Posts: 307
Ha! I only just noticed that they added a second crane to this project. Looks like they may have added the crane in mid-April? Why would they wait so long for a second crane? Is that typical? Seems like most multi crane projects setup the cranes at or around the same time. Maybe that's a misconception.
Reply With Quote
     
     
  #1366  
Old Posted May 11, 2017, 4:54 PM
The Lurker The Lurker is offline
Registered User
 
Join Date: Jan 2013
Location: Great Lakes
Posts: 262
Quote:
Originally Posted by joeg1985 View Post
Ha! I only just noticed that they added a second crane to this project. Looks like they may have added the crane in mid-April? Why would they wait so long for a second crane? Is that typical? Seems like most multi crane projects setup the cranes at or around the same time. Maybe that's a misconception.
The second crane is necessary because precast panels require a lot of hang time. They waited for installation to start ramping up before erecting the second crane
Reply With Quote
     
     
  #1367  
Old Posted May 12, 2017, 2:10 AM
colemonkee's Avatar
colemonkee colemonkee is offline
Ridin' into the sunset
 
Join Date: Nov 2004
Location: L.A. - Skid row adjacent
Posts: 6,972
The pre-cast on this isn't terrible, but there is a big difference between this building and some of the RAMSA buildings that use actual limestone. That being said, RAMSA usually gets the rest of the details right, so this will definitely end up looking pretty decent when its said and done.
__________________
"Then each time Fleetwood would be not so much overcome by remorse as bedazzled at having been shown the secret backlands of wealth, and how sooner or later it depended on some act of murder, seldom limited to once."

Against the Day, Thomas Pynchon
Reply With Quote
     
     
  #1368  
Old Posted May 12, 2017, 5:22 AM
KWILLSKYLINE's Avatar
KWILLSKYLINE KWILLSKYLINE is online now
Registered User
 
Join Date: Aug 2016
Location: Chicago
Posts: 477
I dont know who shop's for materials on here but whats the cost difference between pre-cast vs. actual limestone I dont know if they go by sq foot or by the entire panel. I imagine it's quite a difference but was just wondering price.
Reply With Quote
     
     
  #1369  
Old Posted May 12, 2017, 6:26 PM
colemonkee's Avatar
colemonkee colemonkee is offline
Ridin' into the sunset
 
Join Date: Nov 2004
Location: L.A. - Skid row adjacent
Posts: 6,972
Seems to be a pretty significant difference:

http://www.venturacaststone.com/cost...cast_stone.htm
__________________
"Then each time Fleetwood would be not so much overcome by remorse as bedazzled at having been shown the secret backlands of wealth, and how sooner or later it depended on some act of murder, seldom limited to once."

Against the Day, Thomas Pynchon
Reply With Quote
     
     
  #1370  
Old Posted May 20, 2017, 3:22 AM
BVictor1's Avatar
BVictor1 BVictor1 is offline
Registered User
 
Join Date: Sep 2002
Location: Chicago
Posts: 8,605
05/16/17





__________________
titanic1
Reply With Quote
     
     
  #1371  
Old Posted May 20, 2017, 5:28 AM
SpireGuy's Avatar
SpireGuy SpireGuy is offline
Making Chicago Memorable.
 
Join Date: Jul 2009
Location: Chicago, IL
Posts: 64
Will certain window frames (precast concrete) be painted brown like in the renderings? I thought the precast would have come in the brown color, but so far the building is uniform in its creamy color.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Highrise Construction
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 7:16 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2017, vBulletin Solutions, Inc.