HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Reply

 
Thread Tools Display Modes
     
     
  #41  
Old Posted Aug 26, 2009, 2:58 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by lightrail View Post
Should be okay - there's already a track diagram for skytrain at NYC subway page and at Transport 2000 there's a wiring diagramme from the Vancouver trolley buses. For London England, you can buy a track diagramme of the entire underground - which is where I got the idea for this. And then you can always zoom in on Google maps to see everything (complete with lat and long).
I was being sarcastic.

Quote:
Originally Posted by WaxItYourself View Post
You don't even need to be a member. All you need to do is click on the edit button at the top of the page and submit an edit. If you wanted to be a member you could but I have editted things before and I am not one.
I think you need to be a member to upload pictures onto Wiki, which is what I would recommend. If you can create a svg file of that diagram, that would be great.
Reply With Quote
     
     
  #42  
Old Posted Aug 26, 2009, 5:18 AM
lightrail lightrail is offline
Registered User
 
Join Date: Oct 2007
Posts: 809
Okay - any more errors or omissions. Anybody have the opening date of Columbia? I've added Evergreen line - route alignment at least, based on the Evergreen website. I think it's done. Comments?

Reply With Quote
     
     
  #43  
Old Posted Aug 26, 2009, 5:22 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Blazed Member - Citygater
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,120
Quote:
Originally Posted by Overground View Post
I think the 1km demo was the summer of 1983 but not sure of the exact days.
wow that early eh! wowza!
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #44  
Old Posted Aug 26, 2009, 6:11 AM
Spork's Avatar
Spork Spork is offline
Shoebox Dweller
 
Join Date: Sep 2008
Location: Vancouver
Posts: 1,784
What is this future boundary station?
Reply With Quote
     
     
  #45  
Old Posted Aug 26, 2009, 7:08 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by Spork View Post
What is this future boundary station?
There are provisions for a future stn at Boundary but I believe they never surfaced.
Reply With Quote
     
     
  #46  
Old Posted Aug 26, 2009, 7:12 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ and hopefully they never will, i like my quick ride. Another station is overkill.
Reply With Quote
     
     
  #47  
Old Posted Aug 26, 2009, 7:14 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by mr.x View Post
^ and hopefully they never will, i like my quick ride. Another station is overkill.
Well if the area gets developed, I wouldn't mind, but that's not going to happen, not until I die at least.
Reply With Quote
     
     
  #48  
Old Posted Aug 26, 2009, 3:34 PM
metroXpress's Avatar
metroXpress metroXpress is offline
(||||||-||||-||||||)
 
Join Date: Jan 2009
Location: Vancouver B.C.
Posts: 2,220
And the proposed Woodlands stn...don't think they are building that one either?
__________________
"Think simple…reduce the whole
of its parts into the simplest terms,
Getting back to first principles"


~ FRANK LLOYD WRIGHT
Reply With Quote
     
     
  #49  
Old Posted Aug 26, 2009, 4:15 PM
Overground's Avatar
Overground Overground is offline
Registered User
 
Join Date: Apr 2005
Location: Vancouver
Posts: 903
Quote:
Originally Posted by hollywoodnorth View Post
wow that early eh! wowza!

Surprisingly it was but I still can't find exact months other than just summertime. Does anyone else have further official info of those dates the demo line was used in '83? Here's what was said in a session of the 1982 legislature below. Unless they delayed the demo till '85. At any rate, lightrail you might have to change your info on the demo line to 1983.


The member for Burnaby-Willingdon (Mr. Lorimer) made a few comments about light rapid transit, really inferring that it wasn't proceeding or wouldn't proceed very far. In the past 12 months, in the fiscal year ending March 31, 1982, $39 million was spent on the prepayments for 114 cars for the system. Two of those cars will be delivered shortly. They'll be at the PNE, for example, for everyone to see. There has been a good deal of physical work, including drilling, as the hon. member said, of locations for the bases for the columns for the elevated guideway.

There was, within the last few days, a contract let in the amount of $11 million for approximately one kilometre of line, the construction of which has begun near the CNR station and along Terminal Ave. The guideway will be completed by September or October, and will be complete with rails and cars and operating this time next year as a demonstration line. So physically it's proceeding; financially, we're perhaps S50 million into what eventually, at least in current dollar terms, will be a $400 million or $500 million expenditure.


http://www.leg.bc.ca/HANSARD/32nd4th...4s_820604a.htm
Reply With Quote
     
     
  #50  
Old Posted Aug 26, 2009, 4:46 PM
smably smably is offline
Registered User
 
Join Date: Jun 2007
Location: Kitchener
Posts: 138
The first mention in Google News is from December 12, 1985, one day after the system proper opened. Then again, there aren't any articles about the planning or construction, so it's entirely possible that there was an earlier demo line that didn't warrant enough coverage for Google News to know.
__________________
IMBY
Reply With Quote
     
     
  #51  
Old Posted Aug 26, 2009, 4:47 PM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Blazed Member - Citygater
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,120
Quote:
Originally Posted by Allen View Post
And the proposed Woodlands stn...don't think they are building that one either?
ya its debatable. Either you but in both potential future stations on the E and M line or you put neither. BUUUT if I was to place a LONG term bet I would put my money on a Boundary Road station over a Woodlands in the next 20 years.
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3

Last edited by hollywoodnorth; Aug 26, 2009 at 5:59 PM.
Reply With Quote
     
     
  #52  
Old Posted Aug 26, 2009, 4:51 PM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Blazed Member - Citygater
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,120
great update on the map and great teamwork everyone
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #53  
Old Posted Aug 26, 2009, 4:55 PM
Architype's Avatar
Architype Architype is online now
♒︎ Empirically Canadian
 
Join Date: Mar 2004
Location: 🍁 Canada
Posts: 11,982
Nice work on these maps

^ Re: The map posted on the preceding page by Kodii. That map really belongs HERE.

If you haven't seen this, it's a good source of mild amusement.

"The SkyTrain is really a means of drug transportation, as well as a mobile landfill. Average ridership in 2009 was three people per month. "

http://uncyclopedia.wikia.com/wiki/Vancouver
Reply With Quote
     
     
  #54  
Old Posted Aug 27, 2009, 2:43 AM
lightrail lightrail is offline
Registered User
 
Join Date: Oct 2007
Posts: 809
So I'm waiting to here back from Translink on the Main Street demo dates and on the opening date of Columbia Station. Also, I'm told that on September 7th, Broadway and Commercial Drive stations will be renamed Commercial-Broadway Station - so I'll be updating the map to reflect that too.
Reply With Quote
     
     
  #55  
Old Posted Aug 27, 2009, 2:57 AM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
The walk from Patterson to Joyce is just over 10min if you follow the track. That means at the farest point you are only ~5min from a station, I just don't see any point ever in a Boundary station. There will never be the density that there is downtown to justify close stations.
Reply With Quote
     
     
  #56  
Old Posted Aug 27, 2009, 3:10 AM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
Quote:
Originally Posted by jlousa View Post
The walk from Patterson to Joyce is just over 10min if you follow the track. That means at the farest point you are only ~5min from a station, I just don't see any point ever in a Boundary station. There will never be the density that there is downtown to justify close stations.
for an average pace healthy walker , it can not be done in ~10 min, I would put it closer to 15 min
Reply With Quote
     
     
  #57  
Old Posted Aug 27, 2009, 3:48 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Blazed Member - Citygater
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,120
Quote:
Originally Posted by CLC View Post
for an average pace healthy walker , it can not be done in ~10 min, I would put it closer to 15 min
ya for sure or for older people, etc 20 minutes no probs.

it's not a direct path either and the crossing of Kingsway is poor and not pedestrian friendly.
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #58  
Old Posted Aug 27, 2009, 4:06 AM
Jared's Avatar
Jared Jared is offline
senior something
 
Join Date: Oct 2001
Location: Vancouver, Canada
Posts: 4,058
Quote:
Originally Posted by hollywoodnorth View Post
ya for sure or for older people, etc 20 minutes no probs.

it's not a direct path either and the crossing of Kingsway is poor and not pedestrian friendly.
I believe there are plans to improve this as part of the BC Parkway upgrades.
__________________
My Diagrams My Photos

I'm not the guy from Subway.
Reply With Quote
     
     
  #59  
Old Posted Aug 27, 2009, 4:10 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Blazed Member - Citygater
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,120
Quote:
Originally Posted by Jared View Post
I believe there are plans to improve this as part of the BC Parkway upgrades.
the whole Skytrain "7-11 Trail" is a piece of shit. Its been left to rot since the E line opened.

Burnaby has done some work around Edmonds Station but that's it.

You would think they (translink) would rustle up a eco friendly sponsor like MEC or CanTire to sponsor the trailer/path what ever you want to call it to be upgraded and re light/signed, etc
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #60  
Old Posted Aug 27, 2009, 4:27 AM
WBC WBC is offline
Transit User
 
Join Date: Aug 2007
Location: Metrotown/Downtown
Posts: 786
Quote:
Originally Posted by Jared View Post
I believe there are plans to improve this as part of the BC Parkway upgrades.
Actually Patterson to Joyce section is not that bad. The Parkway between Patterson and Kingsway has just been repaved and brand new LED lighting installed. Then there is a bike friendly overpass over Kingsway that gets you to the Telus building, from there you go down Boundary to the pedestrian controlled light that gets you to Vanness Av and you are home free...
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 2:03 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.