Quote:
Originally Posted by robertocarlos View Post
I was told 3 years until completion. Seriously.
Is it possible this is for the entire project to be done, and not just 300 Main? IIRC they said that the 300 tower would be done first with the middle part (330 Main) to be completed after.
Reply With Quote
     
     
  #2142  
Old Posted Jun 11, 2018, 3:49 PM
oftheMoon's Avatar
oftheMoon oftheMoon is offline
Registered User
 
Join Date: May 2013
Location: East Exchanger
Posts: 675
I'm chomping at the bit to see how the tower and the middle part is going to integrate with Winnipeg Square below. I'm thinking how can it not end up being entirely different down there. Maybe not so much from the tower, but that middle section would change everything, no?
Reply With Quote
     
     
  #2143  
Old Posted Jun 11, 2018, 3:56 PM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,799
Initial thoughts or hopes are that main floor would be open to WS like Portage Place or Polo Park, however it all depends on the use of the main floor. If the retail on the main floor is shared common space with multiple units, could work. However if this supposed grocery store or some sort of major tenant takes up most of the main floor, maybe not.
Reply With Quote
     
     
  #2144  
Old Posted Jun 11, 2018, 4:44 PM
BuildUpWpg BuildUpWpg is offline
Registered User
 
Join Date: Nov 2014
Posts: 455
Quote:
Originally Posted by tvor202 View Post
https://imgur.com/gallery/LpFqUlF

Apparently I can't figure out how to post an image directly here...
There is a "insert image" icon in the 2nd row of editing features in the creating a message box.
Reply With Quote
     
     
  #2145  
Old Posted Jun 11, 2018, 5:01 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,483
Quote:
Originally Posted by buzzg View Post
Initial thoughts or hopes are that main floor would be open to WS like Portage Place or Polo Park, however it all depends on the use of the main floor. If the retail on the main floor is shared common space with multiple units, could work. However if this supposed grocery store or some sort of major tenant takes up most of the main floor, maybe not.
I hope there is some way to preserve at least part of the atrium...
Reply With Quote
     
     
  #2146  
Old Posted Jun 11, 2018, 6:30 PM
BAKGUY BAKGUY is offline
Registered User
 
Join Date: Oct 2014
Posts: 1,040
Quote:
Originally Posted by esquire View Post
I hope there is some way to preserve at least part of the atrium...
I concur. The atrium would be nice to preserve. I am also envisioning an additional floor or 2 which will be cut out looking down towards the open atrium.
That would make the entire complex look big city and obviously offer more amenities and stores, services.

Last edited by BAKGUY; Jun 11, 2018 at 11:26 PM. Reason: update
Reply With Quote
     
     
  #2147  
Old Posted Jun 11, 2018, 7:38 PM
robertocarlos robertocarlos is offline
Registered User
 
Join Date: Jul 2015
Posts: 820
There is a plan to build an escalator in the middle of 330 Main. This will connect the WS main floor to whatever they are building, so most likely an open concept. The sun shining in WS is nice.

Last edited by robertocarlos; Jun 11, 2018 at 7:48 PM.
Reply With Quote
     
     
  #2148  
Old Posted Jun 11, 2018, 11:30 PM
BAKGUY BAKGUY is offline
Registered User
 
Join Date: Oct 2014
Posts: 1,040
Quote:
Originally Posted by robertocarlos View Post
There is a plan to build an escalator in the middle of 330 Main. This will connect the WS main floor to whatever they are building, so most likely an open concept. The sun shining in WS is nice.
Perhaps 330 Main will house the new HYATT PLACE hotel?
Hyatt announced it the other day plus another in the burbs called Hyatt House
With 144 rooms for the downtown hotel, it could work. Opening says 2019?
Back in time when Winnipeg Square was originally built, that middle space (360) was rumored to have bean a proposal for a Hyatt Regency.
Reply With Quote
     
     
  #2149  
Old Posted Jun 11, 2018, 11:44 PM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,799
^Artis said the middle portion (330 Main) would be the last phase of the whole project – can't see it being ready before 2020.
Reply With Quote
     
     
  #2150  
Old Posted Jun 12, 2018, 1:44 PM
dmacc dmacc is offline
Registered User
 
Join Date: Dec 2017
Location: Winnipeg
Posts: 1,649
Any word on the crane going up today? Can anyone get any pictures?
Reply With Quote
     
     
  #2151  
Old Posted Jun 12, 2018, 2:39 PM
DowntownBooster DowntownBooster is offline
Registered User
 
Join Date: May 2006
Posts: 320
Quote:
Originally Posted by dmacc View Post
Any word on the crane going up today? Can anyone get any pictures?
I believe it was robertocarlos that mentioned a few days back that the crane was to go up today (June 12). Maybe he can provide an update.
Reply With Quote
     
     
  #2152  
Old Posted Jun 12, 2018, 2:44 PM
rkspec rkspec is offline
Registered User
 
Join Date: Aug 2014
Posts: 746
Quote:
Originally Posted by dmacc View Post
Any word on the crane going up today? Can anyone get any pictures?
Lets hope its not this crane!


Pipeline + Perimeter

Reply With Quote
     
     
  #2153  
Old Posted Jun 12, 2018, 2:58 PM
DowntownBooster DowntownBooster is offline
Registered User
 
Join Date: May 2006
Posts: 320
^^^That would not be good if it was.
Reply With Quote
     
     
  #2154  
Old Posted Jun 12, 2018, 3:09 PM
CoryB CoryB is offline
Registered User
 
Join Date: Mar 2012
Posts: 5,892
Quote:
Originally Posted by buzzg View Post
^Artis said the middle portion (330 Main) would be the last phase of the whole project – can't see it being ready before 2020.
I think what bakguy might have been suggesting is something like the top X floors of the tower at Main and Graham would be the Hyatt with residential in the middle and a hotel lobby at ground level.
Reply With Quote
     
     
  #2155  
Old Posted Jun 12, 2018, 3:19 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 8,748
I saw a really great photo this morning from high up in 360 Main of the worksite on Twitter and was going to post it but I cannot find it anymore.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #2156  
Old Posted Jun 12, 2018, 3:37 PM
BAKGUY BAKGUY is offline
Registered User
 
Join Date: Oct 2014
Posts: 1,040
330 Main st - Wpg Square

Quote:
Originally Posted by CoryB View Post
I think what bakguy might have been suggesting is something like the top X floors of the tower at Main and Graham would be the Hyatt with residential in the middle and a hotel lobby at ground level.
Yes Cory that would be one way to go.
Perhaps that tower could reach beyond 40 floors with that concept or.. possibly building the entire hotel @ 330.Only Artis knows for sure.
The original plan was for a Hyatt hotel back around 1979-1980.
Less than 8 floors around an indoor atrium.
Reply With Quote
     
     
  #2157  
Old Posted Jun 12, 2018, 3:53 PM
Ale_Hawerchuk Ale_Hawerchuk is offline
Registered User
 
Join Date: Dec 2013
Posts: 7
Quote:
Originally Posted by Biff View Post
I saw a really great photo this morning from high up in 360 Main of the worksite on Twitter and was going to post it but I cannot find it anymore.
Was this it (from @Paul_Hesse on Twitter)?
Reply With Quote
     
     
  #2158  
Old Posted Jun 12, 2018, 4:03 PM
dmacc dmacc is offline
Registered User
 
Join Date: Dec 2017
Location: Winnipeg
Posts: 1,649
I'm pretty curious where they plan on placing the crane? I don't really see an area they have cleared for it. I guess with the rain it will be delayed again, looks like saturday would have been a better day to put it up.
Reply With Quote
     
     
  #2159  
Old Posted Jun 12, 2018, 4:12 PM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,799
Quote:
Originally Posted by BAKGUY View Post
Yes Cory that would be one way to go.
Perhaps that tower could reach beyond 40 floors with that concept or.. possibly building the entire hotel @ 330.Only Artis knows for sure.
The original plan was for a Hyatt hotel back around 1979-1980.
Less than 8 floors around an indoor atrium.
That would be crazy/hilarious if the plans from 40 years ago came back to life and Hyatt went in here. It’s a fantastic location for a hotel, with indoor parking & skywalk connection, and minutes from The Forks and The Exchange.
Reply With Quote
     
     
  #2160  
Old Posted Jun 12, 2018, 4:15 PM
optimusREIM's Avatar
optimusREIM optimusREIM is offline
There is always a way
 
Join Date: May 2014
Location: Winnipeg
Posts: 2,857
plot twist: the building is extended to 50 floors to house the hotel. Bonus: top floor has an observation deck and a restaurant, cause us humans have a weird obsession with looking over cities.

Just daydreaming, but it would be sweet.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 1:01 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.