Quote:
Originally Posted by Stormer
I think you are basing this on the ceilings which are in the current style of open/industrial. If you take a closer look they are in fact finishing with much of the flooring and light fixtures in place. Drywall is done and painting is underway.
|
Yeah - I was understating how much is done... was basically just thinking of it from the perspective of anything worthy of a picture update. Nope.
They still have quite a bit of work to go. The flooring looks to be largely done (covered to protect it). There are plenty of areas of bare studs in need of drywall; lots of fixtures to go up; needs paint in several places; etc (i.e.: a lot of the finishing work still remains).
Granted, as you note, this will be an open/industrial style - so it may just require a short period of finishing work to have it ready for shelving, PoS, inventory, staff training, etc.