Old Posted Apr 28, 2016, 2:25 PM
thefourthtower thefourthtower is offline
Registered User
 
Join Date: Jun 2010
Location: Rueannatta
Posts: 2,597
Does any one know why there building that pile of dirt , thanks
Reply With Quote
     
     
  #2222  
Old Posted Apr 28, 2016, 2:39 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,783
Quote:
Originally Posted by thefourthtower View Post
Does any one know why there building that pile of dirt , thanks
Looks like a ramp down into the hole for trucks, etc.
Reply With Quote
     
     
  #2223  
Old Posted Apr 28, 2016, 3:06 PM
HomeInMyShoes's Avatar
HomeInMyShoes HomeInMyShoes is offline
arf
 
Join Date: May 2005
Location: File 13
Posts: 13,984
^That's usually the case, although with this one going down so far, they are probably going to have to lift material out instead of trucking it. Should be a very interesting process for Regina.
__________________

-- “We heal each other with kindness, gentleness and respect.” -- Richard Wagamese
-- “Unless someone like you cares a whole awful lot, Nothing is going to get better. It's not.” -- Dr. Seuss
Reply With Quote
     
     
  #2224  
Old Posted Apr 28, 2016, 3:18 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,783
Yeah, exactly. If they're going down 5 stories, there's not enough space for a ramp.
Reply With Quote
     
     
  #2225  
Old Posted Apr 28, 2016, 4:19 PM
jigglysquishy's Avatar
jigglysquishy jigglysquishy is offline
Registered User
 
Join Date: Jul 2010
Location: Saskatchewan
Posts: 3,326
If I'm not mistaken it's the deepest basement in either Manitoba or Saskatchewan.

So I expect delays since it's uncharted territory.
Reply With Quote
     
     
  #2226  
Old Posted Apr 28, 2016, 4:29 PM
HomeInMyShoes's Avatar
HomeInMyShoes HomeInMyShoes is offline
arf
 
Join Date: May 2005
Location: File 13
Posts: 13,984
^Agreed on potential delays. If anything this is a good case study for deeper digs within the city and all the more reason I want to see this succeed. It is setting the bar for so much in Regina.
__________________

-- “We heal each other with kindness, gentleness and respect.” -- Richard Wagamese
-- “Unless someone like you cares a whole awful lot, Nothing is going to get better. It's not.” -- Dr. Seuss
Reply With Quote
     
     
  #2227  
Old Posted Apr 28, 2016, 4:29 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,783
I'll wager they do something similar to this story from Calgary. Use a crane with some form of bucket on the end.

http://calgaryherald.com/news/local-...things-to-know
Reply With Quote
     
     
  #2228  
Old Posted Apr 28, 2016, 5:46 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,232
This will be very interesting. Ag Place ,with 3 levels underground, used a back hoe with an extended boom to reach down to take out the earth ramp.
Reply With Quote
     
     
  #2229  
Old Posted Apr 29, 2016, 6:40 PM
Mike328 Mike328 is offline
Registered User
 
Join Date: May 2012
Posts: 261
Seems like progress slowed down over the last week or so. Only noticeable change seems to be a new ramp into the site.

Anyone know if they are waiting on something or just how these projects are.
Reply With Quote
     
     
  #2230  
Old Posted May 10, 2016, 11:04 PM
Mike328 Mike328 is offline
Registered User
 
Join Date: May 2012
Posts: 261
Today they removed two semi loads of wood from the east side of the site (right side of the site on the webcam) and a semi load of pipes.
Reply With Quote
     
     
  #2231  
Old Posted May 11, 2016, 1:09 PM
thefourthtower thefourthtower is offline
Registered User
 
Join Date: Jun 2010
Location: Rueannatta
Posts: 2,597
Quote:
Originally Posted by Mike328 View Post
Today they removed two semi loads of wood from the east side of the site (right side of the site on the webcam) and a semi load of pipes.
They say by the end of July they will hit the bottom
Reply With Quote
     
     
  #2232  
Old Posted May 11, 2016, 6:45 PM
Lutz Lutz is offline
Registered User
 
Join Date: Aug 2015
Location: Northern Sk
Posts: 24
Quote:
Originally Posted by thefourthtower View Post
They say by the end of July they will hit the bottom
Ill believe that when I see it. They've made no progress towards the bottom in over two weeks. I highly doubt they have a burst of speed that results in the hole being complete in just over ten weeks.
Reply With Quote
     
     
  #2233  
Old Posted May 13, 2016, 7:08 PM
James Gablan James Gablan is offline
Registered User
 
Join Date: Jun 2013
Posts: 53
I don't see how they will hit bottom with out actually excavating the middle of the site.

They need to get that drill out of there.
Reply With Quote
     
     
  #2234  
Old Posted May 13, 2016, 8:01 PM
Treesplease Treesplease is offline
Registered User
 
Join Date: Jul 2011
Posts: 990
Quote:
Originally Posted by James Gablan View Post
I don't see how they will hit bottom with out actually excavating the middle of the site.

They need to get that drill out of there.
I kind of thought they meant they would hit financial bottom by July? No way they will see the bottom of a 5 storey pit by July.
Reply With Quote
     
     
  #2235  
Old Posted May 13, 2016, 8:06 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,783
I wonder if this 5 storey thing is all BS. Maybe they mean 5 level parkade, which could be only 2.5 stories. You know the parkades that only go down a half storey for each level. I have a hard time believing they'll get that hole done is 2 months.
Reply With Quote
     
     
  #2236  
Old Posted May 13, 2016, 8:42 PM
Festivus Festivus is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,158
Quote:
Originally Posted by bomberjet View Post
I wonder if this 5 storey thing is all BS. Maybe they mean 5 level parkade, which could be only 2.5 stories. You know the parkades that only go down a half storey for each level. I have a hard time believing they'll get that hole done is 2 months.
Maybe each level is only 4 feet high, so only convertibles can use the parking garage and you need to crouch when you walk in and out.
Reply With Quote
     
     
  #2237  
Old Posted May 13, 2016, 8:50 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,232
Quote:
Originally Posted by bomberjet View Post
I wonder if this 5 storey thing is all BS. Maybe they mean 5 level parkade, which could be only 2.5 stories. You know the parkades that only go down a half storey for each level. I have a hard time believing they'll get that hole done is 2 months.

It is definitely 5 full floors. Remember they have 26 floors of condos plus a 12 story hotel. They need a lot of parking and there is zero surface parking. I think the City posted the parking level plans as part of the zoning approval.
Reply With Quote
     
     
  #2238  
Old Posted May 13, 2016, 8:56 PM
thefourthtower thefourthtower is offline
Registered User
 
Join Date: Jun 2010
Location: Rueannatta
Posts: 2,597
I talked to the sales rep he told me July maybe he meant next year I asked three times seems kinda odd though , they were waiting for tiebacks that's why the there was a hold up on the site
Reply With Quote
     
     
  #2239  
Old Posted May 13, 2016, 8:57 PM
thefourthtower thefourthtower is offline
Registered User
 
Join Date: Jun 2010
Location: Rueannatta
Posts: 2,597
Don't be shy go down there and discuss the project with them
Reply With Quote
     
     
  #2240  
Old Posted May 13, 2016, 9:13 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,232
Quote:
Originally Posted by Stormer View Post
It is definitely 5 full floors. Remember they have 26 floors of condos plus a 12 story hotel. They need a lot of parking and there is zero surface parking. I think the City posted the parking level plans as part of the zoning approval.
OK, I went back and looked a the Dec. 4, 2013 Planning Commission minutes. http://www.regina.ca/residents/counc...lendar-agenda/

This shows only 4 levels of U/G parking but the first level is stacked, valet parking with 14 foot ceilings for the hotel guests. This level alone holds 96 cars.

Other facts: 231 stalls, 3 outdoor; 126 condo units; 130 hotel rooms; height is 82.8m - not including the spire.

Last edited by Stormer; May 13, 2016 at 9:27 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 3:34 PM.

     