HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Supertall Construction


Suzhou Zhongnan Center in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Suzhou Skyscraper Diagram

Map Location

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #1  
Old Posted Oct 19, 2012, 5:36 PM
scalziand's Avatar
scalziand scalziand is offline
Mortaaaaaaaaar!
 
Join Date: Aug 2007
Location: Naugatuck, CT/Worcester,MA
Posts: 3,506
SUZHOU | Zhongnan Center | 499 M / 1,637 FT | 138 FLOORS

Quote:
Suzhou Jinji Lake high-rise project engineering Tender Notice

Date: September 24, 2012
Region: Jiangsu
Registration Starts: 2012-9-24
Deadline: 2012-9-28
Details:
Date: September 24, 2012
Registration Starts: September 24, 2011 18, 2012
Registration Deadline: September 28, 2011 14, 2012

Details:
Suzhou Jinji Lake high-rise project, "" Jiangsu Zhongnan Construction Group Co. companies invest in the development of complex super high-rise, located in the project is located in the Suzhou Industrial Park Jinji Lake the northwest corner Hoseo CBD business district, about 6km away from Suzhou Railway Station, from the view of Front Street shopping district about 5km, about 9 km away from the Suzhou municipal government.

Currently, the project has been officially launched, the ongoing construction drawings and design. For the project to build a high-end boutique project, especially Suzhou Jinji Lake high-rise construction drawings projects to public tender, specific issues are as follows:

I. Project Overview:
1, the tender unit: Jiangsu Zhongnan Construction Group Co., Ltd.
2 project Name: Suzhou Jinji Lake high-rise construction drawings projects
, engineering Location: Suzhou Industrial Park Jinji Lake in the northwest corner of Kosei CBD business district, away from Suzhou Railway Station about 6km, from the view of Front Street shopping district is about 5 km from the Suzhou Municipal Government about 9 km
4 engineering content: 1. underground a total construction area of about 7 to 10 million square meters, total construction floor area of about 40 to 43 million square meters. The total height of the building around about 729m. 3. Exalted height of about of about 580 to 620m. 4 layers 129 or 147 layers.
5, the scope of the tender: the results of the Design Institute outside basis to complete the follow-up of the program (including program optimization or compliance) design, preliminary design and construction design, as well as the design scene in the construction process, according to the requirements of the relevant state laws and regulations Service. To ensure the quality of the project design, the design progress and investment returns, the best way to ensure that the overall objective of the project achieved the winning bidder need to have the operation over the height of 300 meters above the high-rise design and design management experience in the implementation of mega-projects.

Second, the conditions and the level of qualification of the bidder requirements:
1, should be legally registered in the territory of the enterprise with independent legal personality, have a valid business license;
should have architectural engineering design qualification awarded by the Ministry of Construction;
3, there is enough 's assets and ability to independently complete the design and management of the project;
4, passed ISO9000 standard certification;
5, not in being ordered to suspend business property into receivership, freezing, bankruptcy status;
6, no serious breach of contract and major projects in the past three years quality and safety issues. 300 meters above the main project design to complete the 2-3.
7, do not accept the tender of the Commonwealth and affiliated units and individuals.
Bid validity and bid security
, from the from the date of the deadline for submitting bids: 3 calendar days
, the bid bond: 10 million (bid bond Import account: Jiangsu Zhongnan Construction Group Co., Ltd. account 498 858 228 562 Bank of China Haimen Branch Sales Department)
registration information:
Company Profile and Contacts, Contact;
2, a copy of a copy of the business license, tax registration certificate tax land tax a copy of a copy;
3, a copy of a copy of the certificate of qualification;
organization code certificate ;
5, the legal representative of the identity of a copy of proof;
6, the power of attorney;
7, a copy of proof of the identity of the agent Attn (cover official seal);
copies of more than 8,300 meters of outstanding cases with proven track;
9 , the creative staff intends to participate in the project presentation materials.
10, the depositary bank and account number verification (official seal);
Registration:
Registration Deadline time: 2012 09 28 14
2, Registration Location: Haimen, Jiangsu Province, Changle Town SOUTH Headquarters Building, 9th Floor
, registration units in the effective time of the bid registration information in writing by mail to: Changle Town, Haimen, Nantong City, Jiangsu Province, Central South Building, Design Department received; the written registration information see registration information content.
Six, the selection of finalists
taking into account the actual situation of the tender, the tender units in the selection of the finalists to register units units, and notify to receive the tender documents. Not short-listed unit is no longer a separate notice.
Contact Address
1 Address: Changle Town, Haimen, Nantong City, Jiangsu Province, Chung Nam Building
, Contact: Cao Li Chen Xiaohui (can cast electronic documents)
Contact: 15250637705; 15906291180; znsjglzx@163.com

In accordance with the principles of objective, fair and open, the provisions of this information by the owner commissioned exclusive release specified in the China Construction tender net www.jszhaobiao.com the www.zhaobiao.gov.cn
http://www.zhaobiao.gov.cn/noticedetail/28893338.html

The site:

sip

EDIT:
Diagrams, w/ 729m spire height.

Munwon

Last edited by Urbannizer; Apr 17, 2014 at 4:20 AM.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Global Projects & Construction > Supertall Construction
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 2:08 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.