  #3081  
Old Posted Mar 22, 2018, 7:27 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 39,106
seems longer than that
__________________
belowitall
Reply With Quote
     
     
  #3082  
Old Posted Mar 22, 2018, 11:57 PM
Shift Shift is offline
Registered User
 
Join Date: Sep 2014
Location: Surrey
Posts: 1,944
The new Broadway Station platform has taken as long to build as it takes to excavate and build a 40-storey high-rise through to occupancy.

Something seems wrong about that.
Reply With Quote
     
     
  #3083  
Old Posted Mar 23, 2018, 12:22 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,232
The construction is pretty specific in design and they have to build around the public using the site.
Reply With Quote
     
     
  #3084  
Old Posted Mar 23, 2018, 12:48 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 1,784
Quote:
Originally Posted by Shift View Post
The new Broadway Station platform has taken as long to build as it takes to excavate and build a 40-storey high-rise through to occupancy.

Something seems wrong about that.
A better perspective is that Phase 1 of the Expo line had a shovel in the ground in March 1982 and the gates opened in December 1985.
In the time it's taken to do this we would of completed roughly 90% of the original SkyTrain network. That's over 20km of guideway, all the infrastructure and 15 goddamn stations from scratch.

So......slow........
Reply With Quote
     
     
  #3085  
Old Posted Mar 23, 2018, 2:50 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 39,106
re. the overpass at metrotown, could they just add stairs at the end to appease people for now and at least walking down would be easier since the overpass is still there...
__________________
belowitall
Reply With Quote
     
     
  #3086  
Old Posted Mar 23, 2018, 2:55 AM
WBC WBC is offline
Transit User
 
Join Date: Aug 2007
Location: Metrotown/Downtown
Posts: 786
Quote:
Originally Posted by officedweller View Post
The construction is pretty specific in design and they have to build around the public using the site.
I don't buy that argument at all...

For example, At Metrotown, it takes them months to complete simple tasks such as pouring concrete for sidewalks and plazas around the station. These sections are completely separated from the public and fenced off.

I can understand that you have to be careful when lifting large structures such as sections of the station roof...but the rest?
Reply With Quote
     
     
  #3087  
Old Posted Mar 23, 2018, 2:58 AM
WBC WBC is offline
Transit User
 
Join Date: Aug 2007
Location: Metrotown/Downtown
Posts: 786
Quote:
Originally Posted by SpongeG View Post
re. the overpass at metrotown, could they just add stairs at the end to appease people for now and at least walking down would be easier since the overpass is still there...
My hope is exactly that. That would explain why they would not have removed it earlier. One of the interim designs of the new station (prior to final design) had exactly this configuration with the stairs coming down eastward on the outside of the station (basically mirroring the escalator indoors).
Reply With Quote
     
     
  #3088  
Old Posted Mar 23, 2018, 4:10 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,308
The project was given to the lowest bidder. They have better paying jobs to do so they come first before the Translink work.
Reply With Quote
     
     
  #3089  
Old Posted Mar 23, 2018, 4:19 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 8,337
^ Makes sense. Good, fast, cheap - you can only pick two.
Reply With Quote
     
     
  #3090  
Old Posted Mar 23, 2018, 5:32 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 9,404
At least the walkway hasn't collapsed.
Reply With Quote
     
     
  #3091  
Old Posted Mar 23, 2018, 5:52 AM
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 21,617
Quote:
Originally Posted by Mac Write View Post
The project was given to the lowest bidder. They have better paying jobs to do so they come first before the Translink work.
Not to mention construction resources are beyond maxed out in Metro Vancouver right now.

Always love to see the armchair project managers come out on these things.
Reply With Quote
     
     
  #3092  
Old Posted Mar 23, 2018, 6:54 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 39,106
it would be cool had they used a coloured glass on the escalators like these yellow ones on the new crossrail


crossrail
__________________
belowitall
Reply With Quote
     
     
  #3093  
Old Posted Mar 23, 2018, 4:10 PM
idunno idunno is offline
Registered User
 
Join Date: Feb 2010
Posts: 746
I heard that the entire Broadway/Commercial renovation was hampered by the construction of the new bridge over the rail tracks.

CN didn't allow construction to occur within 1 hour of trains going past, so they were limited to a few hours a day. Because the bridge was going to take so long, the entire project's timeline was slowed to match it.
Reply With Quote
     
     
  #3094  
Old Posted Mar 23, 2018, 7:28 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,270
Quote:
Originally Posted by MIPS View Post
A better perspective is that Phase 1 of the Expo line had a shovel in the ground in March 1982 and the gates opened in December 1985.
In the time it's taken to do this we would of completed roughly 90% of the original SkyTrain network. That's over 20km of guideway, all the infrastructure and 15 goddamn stations from scratch.

So......slow........
Standards and regulations back in the day weren't as strict as they are now, and NIMBY's weren't as loud either. Nor was there a lot of political stalling for the purpose of using those projects to get elected or reelected.

Today you gotta study everything down to the quark just to get a permit, and by the time you get the studies mostly done, it's election time and then you gotta do more studies. And maybe even studies for those studies.
Reply With Quote
     
     
  #3095  
Old Posted Mar 23, 2018, 8:13 PM
Vin Vin is offline
Registered User
 
Join Date: Sep 2013
Posts: 8,218
Quote:
Originally Posted by WarrenC12 View Post
Not to mention construction resources are beyond maxed out in Metro Vancouver right now.

Always love to see the armchair project managers come out on these things.
How come so many projects are much faster? Perhaps they have way better "armchair project managers"?


Quote:
Originally Posted by idunno View Post
I heard that the entire Broadway/Commercial renovation was hampered by the construction of the new bridge over the rail tracks.

CN didn't allow construction to occur within 1 hour of trains going past, so they were limited to a few hours a day. Because the bridge was going to take so long, the entire project's timeline was slowed to match it.
I wonder if they have been doing night shift work in that case, with additional shift-work added on Sundays.
Reply With Quote
     
     
  #3096  
Old Posted Mar 23, 2018, 10:56 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,232
CN Trains run at night, too.
Reply With Quote
     
     
  #3097  
Old Posted Mar 24, 2018, 4:04 AM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 688
Quote:
Originally Posted by idunno View Post
I heard that the entire Broadway/Commercial renovation was hampered by the construction of the new bridge over the rail tracks.

CN didn't allow construction to occur within 1 hour of trains going past, so they were limited to a few hours a day. Because the bridge was going to take so long, the entire project's timeline was slowed to match it.
This appears to line up with what the TransLink Board Report mentions in its financials section about the project: "Variance due to delays in project from increased CN rail traffic in the Grandview Cut."
(Source: page 41)
Reply With Quote
     
     
  #3098  
Old Posted Mar 25, 2018, 1:30 AM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 600
Couple the above with (at least now temporarily alleviated) Translink's cashflow problems and CN switching to use this route much more to access Burrard Inlet last year.
Reply With Quote
     
     
  #3099  
Old Posted Mar 25, 2018, 5:03 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,263
the Grandview cut sees trains 24/7. they run on average about 11/12 trains per day through there. of course some days can have up to 20 run through. it is fairly random. on-top of that, these trains average about 90 cars and run slowly. plus they can also stop for awhile.

then there are the VIA Rail trains, Seattle bound trains and Mountaineer as well.
Reply With Quote
     
     
  #3100  
Old Posted Mar 25, 2018, 4:08 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 17, 2020 at 8:34 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 2:53 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.