Huge mixed-use project planned at Uptown's door on old Xerox site

Quote:
The new owner - which has retail and mixed-use properties in a half dozen states - is working on designs for a retail, restaurant, hotel, office and residential complex on the property, which is adjacent to the Cityplace development.

The proposed development would include a residential tower, luxury hotel, shopping and restaurants plus two office towers according to preliminary plans prepared by De La Vega Development. Almost 1.4 million square feet of development would be built on the property, which now has an office tower, data center and other commercial buildings.
Reply With Quote
     
     
  #4962  
Old Posted Jun 17, 2017, 3:15 AM
Austin55's Avatar
Austin55 Austin55 is offline
__________
 
Join Date: Jul 2007
Location: Fort Worth
Posts: 4,998
Huge blow to downtown Fort Worth as XTO announces it's moving 1,600 employees (1,200 next year, the remainder by 2020) employees to the new Exxon Campus in the Woodlands. XTO was sold to Exxon in 2010. Before the sale, XTO owner Bob Simpson purchased dozens of neglected historic highrises in the heart of the CBD and has done a wonderful job restoring them, and they have been a huge part of the renaissance of downtown. They will be selling 5 of their downtown highrises and another building in the Stockyards, retaining one of the downtown buildings.

Here are the buildings they currently own and occupy.

http://www.fortwortharchitecture.com/binyon-okeefe.htm
http://www.fortwortharchitecture.com/baker.htm
http://www.fortwortharchitecture.com/petroleum.htm
http://www.fortwortharchitecture.com/transprt.htm
http://www.fortwortharchitecture.com...wiftoffice.htm
http://www.fortwortharchitecture.com/tindallr.htm
http://www.fortwortharchitecture.com/waggoner.htm

The company also owns a large multistory garage and 4 surface lots in downtown, 2 of which comprise of 3/4 block and one is a full block.
__________________
Fort Worth Urban Development

Last edited by Austin55; Jun 17, 2017 at 4:07 AM.
Reply With Quote
     
     
  #4963  
Old Posted Jun 17, 2017, 4:22 AM
Sic'EmBears's Avatar
Sic'EmBears Sic'EmBears is offline
Registered User
 
Join Date: Sep 2011
Location: Dallas
Posts: 2,221
Mixed-use TOD in North Richland Hills:

Fountain at Iron Horse

Quote:
Transit oriented/ mixed use development that will consist 30,000 SF of ground floor retail and 238 apartment units. This initial development is the first phase of +/-1,000 units to be developed in the immediate area by 2018.

Located at the SWC of Iron Horse Blvd and Browning Blvd in North Richland Hills just north of 820 and west of Rufe Snow Dr the site sits adjacent to the Iron Horse Station of the Tex Rail line Blvd from DFW Airport to downtown Fort Worth. TEX Rail is a 27-mile commuter rail project being developed by the Fort Worth Transportation Authority and will be the next passenger rail service coming to Tarrant County.
Additional Information
  • Fountain at Iron Horse construction will begin 4th quarter 2016
  • Delivery of retail shell schedule for 1st quarter 2018

Property Flyer (PDF)





Reply With Quote
     
     
  #4964  
Old Posted Jun 17, 2017, 6:34 AM
drummer drummer is offline
World Traveler
 
Join Date: Jan 2015
Location: Austin metro area
Posts: 4,479
It'll be really interesting to see what sort of TOD opportunities are realized with the TexRail line. Pretty cool to see some stuff already happening.
Reply With Quote
     
     
  #4965  
Old Posted Jun 19, 2017, 3:16 AM
Roman_Patrick's Avatar
Roman_Patrick Roman_Patrick is offline
Registered User
 
Join Date: Feb 2016
Posts: 114
Construction update 6/18/17

A couple of pictures I took Sunday 6/18/17

Cranes are now set up for the Deep Ellum The Epic project.

[IMG]http://[url=https://flic.kr/p/UDn2qQ][/url]IMG_0837 by Roman Reyna, on Flickr[/IMG]

[IMG]IMG_0841 by Roman Reyna, on Flickr[/IMG]

[IMG]IMG_0842 by Roman Reyna, on Flickr[/IMG]

[IMG]http://[url=https://flic.kr/p/VkCsnQ][/url]IMG_0848 by Roman Reyna, on Flickr[/IMG]

[IMG]IMG_0845 by Roman Reyna, on Flickr[/IMG]

[IMG]IMG_0857 by Roman Reyna, on Flickr[/IMG]
Reply With Quote
     
     
  #4966  
Old Posted Jun 19, 2017, 6:17 AM
Sic'EmBears's Avatar
Sic'EmBears Sic'EmBears is offline
Registered User
 
Join Date: Sep 2011
Location: Dallas
Posts: 2,221
It's done: Pioneer Natural Resources inks deal for its Hidden Ridge campus


DMN

Quote:
The Dallas-based developer behind Toyota North America's 100-acre campus in Plano's Legacy West has signed its latest deal with Irving-based Pioneer Natural Resources' (NYSE: PXD) on its new corporate campus.
Quote:
"Pioneer's building will stand atop the highest point of the former Carpenter Ranch in Las Colinas, so it's only fitting that a great building site such as this go to a great company like Pioneer," said KDC CEO Steve Van Amburgh, in a statement.

"We've worked very closely with Pioneer to design a building that amplifies the beautiful and natural surroundings of the land yet is appropriately scale for Pioneer's employee-focused culture and modest character," he added.
Quote:
The 10-story office building, which will sit at 777 Hidden Ridge near Hidden Ridge and John Carpenter Freeway, will include a glass curtainwall, stone facade with an adjacent seven-story parking garage.
Quote:
The development group, which includes telecom provider Verizon, behind Hidden Ridge are expected to unveil plans later this year for the $1.5 billion project.
Quote:
Construction is expected to begin by the end of the month, with completion slated for winter 2019.
Reply With Quote
     
     
  #4967  
Old Posted Jun 19, 2017, 3:12 PM
Thymant's Avatar
Thymant Thymant is offline
Hopeful Graduate
 
Join Date: Jul 2008
Location: Dallas
Posts: 607
Plano Legacy West from this weekend:
















By Me
Reply With Quote
     
     
  #4968  
Old Posted Jun 29, 2017, 4:00 PM
Roman_Patrick's Avatar
Roman_Patrick Roman_Patrick is offline
Registered User
 
Join Date: Feb 2016
Posts: 114
The Union Dallas

[IMG]IMG_08771057629 by Roman Reyna, on Flickr[/IMG]
Quick update taken by me of The Union Dallas. Update from 6/27/2017
Reply With Quote
     
     
  #4969  
Old Posted Jun 30, 2017, 2:36 PM
ealba ealba is offline
Registered User
 
Join Date: May 2016
Posts: 39
Irving's Music Factory and Westin hotel credit: self
Reply With Quote
     
     
  #4970  
Old Posted Jul 7, 2017, 2:27 AM
Sic'EmBears's Avatar
Sic'EmBears Sic'EmBears is offline
Registered User
 
Join Date: Sep 2011
Location: Dallas
Posts: 2,221
Park Plaza, site of the world's first drive-through bank, Hillcrest State Bank (1938)

  • Mixed-Use
  • Office
  • Retail
  • 347,000 SF

Quote:
The ground-floor retail serves as an amenity for the office workers and activates the street level.

The streetscape and pedestrian crossing areas are carefully planned to ensure visitor safety. Since the development will be built on the site of an old office building and two surface parking lots, the project required extensive rezoning through the City of University Park. The design was successfully approved by the Planning and Zoning Commission and is anticipated to start construction soon.


Reply With Quote
     
     
  #4971  
Old Posted Jul 7, 2017, 5:48 PM
Roman_Patrick's Avatar
Roman_Patrick Roman_Patrick is offline
Registered User
 
Join Date: Feb 2016
Posts: 114
Residences at Hall Arts

Does anyone know why there are no construction workers or cranes at the site of the Residences at Hall Arts tower?
It has been a while since the ceremony..
Reply With Quote
     
     
  #4972  
Old Posted Jul 7, 2017, 10:49 PM
Austin55's Avatar
Austin55 Austin55 is offline
__________
 
Join Date: Jul 2007
Location: Fort Worth
Posts: 4,998
Fort Worth - East side

__________________
Fort Worth Urban Development
Reply With Quote
     
     
  #4973  
Old Posted Jul 10, 2017, 2:38 AM
Sic'EmBears's Avatar
Sic'EmBears Sic'EmBears is offline
Registered User
 
Join Date: Sep 2011
Location: Dallas
Posts: 2,221
What’s next for Roanoke? A luxury hotel and conference center



Quote:
A 300-room Peabody Hotel would be built south of the existing restaurant row, near where a new City Hall is under construction. Plans released Thursday call for 300 rooms and suites, a restaurant, two bars, a high-end spa and fitness center and a large rooftop swimming pool. There also would be more than 30,000 square feet of meeting and event space.

In a statement, Douglas V. Browne, president of Peabody Hotels & Resorts, said the hotel project “is still very much in the planning and financing stages.” But the developer, Bluff City Group, said it hopes to open the hotel within the next two years.

The hotel would be located along an extension of Oak Street south of the downtown strip, where Babe’s Chicken is located, as part of a new mixed-use project being developed by the Integrity Group of Justin. The area will include the new City Hall, residential units, retail space and offices, said Scott Campbell, Roanoke’s city manager.
Quote:
The Peabody, which dates to 1869, was restored and reopened in 1981. The property is known for its ducks, which swim in a fountain in the hotel lobby and waddle through the hotel daily. A fountain with ducks is also planned for the Roanoke property.
Reply With Quote
     
     
  #4974  
Old Posted Jul 10, 2017, 3:11 AM
drummer drummer is offline
World Traveler
 
Join Date: Jan 2015
Location: Austin metro area
Posts: 4,479
That's quite the catch for Roanoke. Cool to see!

Are there any plans in the near future to finish out the expressway of 114 all the way to I-35W? I'm sure there are plans, so let me rephrase this: Are there any plans in the near future to do this work?
Reply With Quote
     
     
  #4975  
Old Posted Jul 10, 2017, 3:54 AM
Sic'EmBears's Avatar
Sic'EmBears Sic'EmBears is offline
Registered User
 
Join Date: Sep 2011
Location: Dallas
Posts: 2,221
Quote:
Originally Posted by drummer View Post
That's quite the catch for Roanoke. Cool to see!

Are there any plans in the near future to finish out the expressway of 114 all the way to I-35W? I'm sure there are plans, so let me rephrase this: Are there any plans in the near future to do this work?
Not to my knowledge.

However, NTTA will soon break ground on SH 170, connecting SH 114 to I-35W.

View the project's schematics and North Texas' 12-county regional mobility projects here.
Reply With Quote
     
     
  #4976  
Old Posted Jul 12, 2017, 3:10 AM
Sic'EmBears's Avatar
Sic'EmBears Sic'EmBears is offline
Registered User
 
Join Date: Sep 2011
Location: Dallas
Posts: 2,221
Family office begins work on new office building near Maple Avenue in Dallas



Project Location

Quote:
The new four-story, 31,483-square-foot boutique office building, called Parkland Knight, will sit at the corner of Knight and Fairmount streets in Dallas upon completion.

John Thompson Jr. of J.T. Philip Co., along with Nancy Tartaglino Richards and Lisa Barrentine — founder and CEO, respectively — of First Preston HT, will own the office building, which is slated for completion by the end of summer 2018.
Quote:
The families' home offices will sit on the fourth floor of the office building, totaling 9,000 square feet.

The building will also have a rooftop terrace with views of downtown Dallas and a ground-floor coffee shop.
Reply With Quote
     
     
  #4977  
Old Posted Jul 12, 2017, 3:30 AM
Sic'EmBears's Avatar
Sic'EmBears Sic'EmBears is offline
Registered User
 
Join Date: Sep 2011
Location: Dallas
Posts: 2,221
Statler Hotel developers starting garage and mixed-use project this month in downtown Dallas


Preservation Dallas

Quote:
Dallas' city plan commission has given approval for a mixed-use building that would be constructed on Harwood Street next door to the former Dallas Public Library building.
Quote:
"CADG Jackson Parking A LLC, an affiliate of Centurion American Development Group, plans to break ground on a six level subterranean parking garage located at the northeast corner of Hardwood and Jackson streets in downtown Dallas," Centurion American Development representatives said in a statement.

"Future plans also include construction of residential housing units above the garage.
Quote:
"Construction on the garage should begin July 2017," the spokeswoman said. "The garage is being built to help meet the parking needs of the Statler Hotel & Residences as well as the Statler Library.
Project Location
Reply With Quote
     
     
  #4978  
Old Posted Jul 12, 2017, 5:31 PM
Dale Dale is offline
Registered User
 
Join Date: Dec 2001
Location: Charlotte
Posts: 4,799
Damn, thought this was well under construction!
Reply With Quote
     
     
  #4979  
Old Posted Jul 12, 2017, 10:15 PM
Sic'EmBears's Avatar
Sic'EmBears Sic'EmBears is offline
Registered User
 
Join Date: Sep 2011
Location: Dallas
Posts: 2,221
Quote:
Originally Posted by Dale View Post
Damn, thought this was well under construction!
I believe you misread the article.
Reply With Quote
     
     
  #4980  
Old Posted Jul 13, 2017, 2:26 AM
Dale Dale is offline
Registered User
 
Join Date: Dec 2001
Location: Charlotte
Posts: 4,799
Quote:
Originally Posted by Sic'EmBears View Post
I believe you misread the article.
Indeed I did!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 2:07 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.