Winnipeg | Osborne Place | 257 Osborne St. | 26M | 6F | U/C


Image Source

Proposed 6 storey Mixed-Use Office and Retail building
~45-49K sq.ft. of class A space
Estimated Completion date: End of 2016

Location: Winnipeg, Manitoba 257 Osborne St.
aka: Confusion Corner, Osborne Village

Architect: SNH Architecture Inc.
Management & Leasing: Imperial Properties

http://www.snharchitecture.com/
http://www.imperialproperties.ca/

Last edited by Cyro; Jan 22, 2016 at 7:44 PM. Reason: edit info
Reply With Quote
     
     
  #2  
Old Posted Jan 20, 2016, 5:11 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
Please post with any new or corrected info/images.
Reply With Quote
     
     
  #3  
Old Posted Jan 20, 2016, 5:41 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,679
There was a crane and at least one excavator on site when I passed by yesterday. Didn't get a good look at what was going on. But seems to be going ahead if a large crane was assembled on site.
Reply With Quote
     
     
  #4  
Old Posted Jan 20, 2016, 8:23 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 8,691
Quote:
Originally Posted by bomberjet View Post
There was a crane and at least one excavator on site when I passed by yesterday. Didn't get a good look at what was going on. But seems to be going ahead if a large crane was assembled on site.
Concrete piles being driven on site today.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #5  
Old Posted Jan 20, 2016, 8:44 PM
Pinus Pinus is offline
BANNED
 
Join Date: Jul 2015
Posts: 1,409
Is this that site with the "Banana Split" ice cream shop?
Reply With Quote
     
     
  #6  
Old Posted Jan 20, 2016, 8:46 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,483
Quote:
Originally Posted by Pinus View Post
Is this that site with the "Banana Split" ice cream shop?
No, this one's right at the southern end of Confusion Corner, between the intersections and the BRT station.

Incidentally, no movement at all visible on the Banana Boat project. At the current rate, I fully expect the Banana Boat to be serving up ice cream this summer, as per usual.
Reply With Quote
     
     
  #7  
Old Posted Jan 20, 2016, 9:03 PM
Pinus Pinus is offline
BANNED
 
Join Date: Jul 2015
Posts: 1,409
Ah, gotcha. I knew it was in that area somewhere.
Reply With Quote
     
     
  #8  
Old Posted Jan 20, 2016, 9:49 PM
1ajs's Avatar
1ajs 1ajs is online now
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 25,818
Reply With Quote
     
     
  #9  
Old Posted Jan 21, 2016, 5:58 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
That was a quick transition from stalled/cancelled to under construction.

Yeah, their working quickly as mentioned by posters and the pic provided, thx

There's even a 2-Storey Billboard/Sign when heading South on Osborne being erected on site..Should be real distracting when it's on..

EDIT: Old sign. not new...

Last edited by Cyro; Jan 21, 2016 at 8:15 PM. Reason: edit added:
Reply With Quote
     
     
  #10  
Old Posted Jan 21, 2016, 6:56 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,483
^ The billboard I think you're speaking of is actually an old one being dismantled!

I have to admit I didn't really expect this project to come to fruition, I more or less lumped it in the same category as the other eternal proposals that never actually get built like the mythical Lakeview hotel on St. Mary's or the Inlett office/condo on Osborne North. Good on Imperial Properties for getting it done. I wonder who has signed on as tenants?
Reply With Quote
     
     
  #11  
Old Posted Jan 21, 2016, 8:13 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
^ Thanks for the correction. I seen the boys up their this morning working on it, with the signs removed already..looked like it was going up..but it's comin down..

Not sure on tenants but the sq.ft. available is down from the older original estimates I gave.
Around 32K sq.ft. is available at this point.
Maybe they do have some tenants lined up at this point, or hey've cut back on available space in the design. aprx: 10K sq.ft. It's quite the change from the original estimates.
Reply With Quote
     
     
  #12  
Old Posted Jan 21, 2016, 10:04 PM
scryer scryer is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,927
For Osborne, they could have done better (design and height-wise).

I'm a little confused, is this office space or residential?
Reply With Quote
     
     
  #13  
Old Posted Jan 21, 2016, 10:25 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,679
Some kind of professional centre. For it's location, I'm okay with it. Not in the village, but rather smashed into an area that doesn't have a lot of opportunity to be used as anything else. I guess someone could've put up a large tower and called it TOD, since Osborne Station is right there.
Reply With Quote
     
     
  #14  
Old Posted Jan 22, 2016, 12:07 AM
Jeff's Avatar
Jeff Jeff is offline
Registered User
 
Join Date: Oct 2002
Location: Winnipeg|MB
Posts: 2,220
Cjob talks about this project paired with a 10-storey residential tower at Jessie and Osborne.. http://www.cjob.com/2016/01/21/113590/

now if the lot across from the harkness station gets developed then maybe the city can start touting a bit of success on the TOD front
__________________
instagram: @jeff_vernaus

Last edited by Jeff; Jan 22, 2016 at 12:28 AM.
Reply With Quote
     
     
  #15  
Old Posted Jan 22, 2016, 2:09 AM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,679
Latest over used buzzword: iconic.
Reply With Quote
     
     
  #16  
Old Posted Jan 22, 2016, 2:41 AM
Boreal's Avatar
Boreal Boreal is offline
Registered User
 
Join Date: Sep 2006
Location: Winnipeg
Posts: 1,698
It's a notable improvement over what is currently present at that site. I'm actually quite looking forward to it, as far as minor developments go. It will give the space some nice volume.
Reply With Quote
     
     
  #17  
Old Posted Jan 22, 2016, 3:23 AM
LilZebra LilZebra is offline
Orig. frm Alpha Pectaurus
 
Join Date: Nov 2004
Location: Assiniboia, Man.
Posts: 2,873
Quote:
Originally Posted by Jeff View Post
Cjob talks about this project paired with a 10-storey residential tower at Jessie and Osborne.. http://www.cjob.com/2016/01/21/113590/

now if the lot across from the harkness station gets developed then maybe the city can start touting a bit of success on the TOD front
They could have gotten CBC's Rick Mercer to do that video, because that's exactly what it reminds me of.
__________________
Buh-bye
Reply With Quote
     
     
  #18  
Old Posted Jan 22, 2016, 4:12 AM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,799
Does anyone know what's in that tiny brick building at Osborne and Jessie right now? Also, I hate that the Masonic Temple is across the street because it's such a waste of what could become very valuable land if both these projects go ahead beside the station. The city needs to plan and act NOW on redesigning confusion corner before more development happens and it's too late, especially in regards to that Money Mart lot.
Reply With Quote
     
     
  #19  
Old Posted Jan 22, 2016, 5:08 AM
cllew cllew is online now
Registered User
 
Join Date: Feb 2012
Posts: 3,968
Brick building was at one time a Winnipeg Hydro substation , then was the home of the General Council of Winnipeg Community Center's. Last tenant I can find is CMH Construction
Reply With Quote
     
     
  #20  
Old Posted Jan 22, 2016, 8:44 AM
scryer scryer is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,927
Thanks for the cbc link and article!

But I'm still a little underwhelmed by the project. For, I hate to over-use it, an iconic location in Winnipeg, couldn't they have designed something better or unique? It's called confusion corner for a reason, they could have had some funky designs going on and what we're getting is a white box that a three year old could come up with.

The article mentioned something about a residential component; I'm interested in the design and why it wasn't considered as a second phase (or something) alongside this office; IMO it would have been a great opportunity to build a dense little community.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 2:06 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.