The Evergreen Line is being delayed... I'm guessing, due to economic and political instability factors. It just needs someone from the Feds to hand over a big check.
Reply With Quote
     
     
  #22  
Old Posted Dec 11, 2008, 6:27 AM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
As far as I know the Feds have agreed to throw money at it (this is on top of the initial contribution) , I believe the funding is now only $100M short of the $1.4Billion budget.
Reply With Quote
     
     
  #23  
Old Posted Dec 11, 2008, 6:30 AM
Distill3d's Avatar
Distill3d Distill3d is offline
Glorfied Overrated Guest
 
Join Date: Sep 2006
Location: Vancouver (Burnaby), British Columbia
Posts: 4,151
Quote:
Originally Posted by ambaUp View Post
...expected to be completed by 2020....The Surrey expansion will likely leave from the King George Station, travel along 104th Avenue, down 152nd Street to Fraser Highway and terminate at 168th Street.
so its going to take 11 years to go 54 blocks? at an average of 5 blocks/year, i'm not sure thats a reasonable time table.

and why would a train leaving from King George loop back up to 104 Avenue? would it not make more sense to branch it off from Gateway along 108 Avenue to 152 Street?
__________________
The Brain: Pinky, are you pondering what I'm pondering?

Pinky: I think so, Brain, but this time, you put the trousers on the chimp.
Reply With Quote
     
     
  #24  
Old Posted Dec 11, 2008, 6:51 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by Distill3d View Post
so its going to take 11 years to go 54 blocks? at an average of 5 blocks/year, i'm not sure thats a reasonable time table.
Ummm... this project isn't going to begin until at least the completion of the Evergreen Line, either during, before, or after the M-Line extension

Quote:
Originally Posted by Distill3d View Post
and why would a train leaving from King George loop back up to 104 Avenue? would it not make more sense to branch it off from Gateway along 108 Avenue to 152 Street?
That was Falcon's plan apparently... but I guess we'll see tomorrow.
Reply With Quote
     
     
  #25  
Old Posted Dec 11, 2008, 7:06 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 16,806
You would think with material costs falling and labour costs possibly falling that 100 million shorfall should dry up fast. This is the time to build infastructure projects, lets get it started.
Reply With Quote
     
     
  #26  
Old Posted Dec 11, 2008, 7:28 AM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
Cost are significantly stickier on the way down then they are on the way up. Labour isn't any cheaper, try and offer someone less money then they were making last year.
Commodities are starting to come down, but not much yet, there are still lots of projects being worked on that are enough to keep prices up. \

I won't be worried about the projects previous announced though, the feds will be helping out shortly.

*Go Harper Go*
Reply With Quote
     
     
  #27  
Old Posted Dec 11, 2008, 8:15 AM
ravman ravman is offline
BANNED
 
Join Date: Mar 2008
Posts: 560
The NDP was able to build the Expo line extension and the M Line as well, Plans were also there to build the E line ( and switches and the foundation for a third rail was also installed... dont believe me.... go there and look with your own eyes) the stations was specifically designed for the Eline extension... that project is ready to roll tmr and yet the govt is stalling... they would rather develop offshore oil or a massive methane drilling project near the Flathead valley,[off topic]. ABSOLUTELY NOTHING for British Columbians... the 12 billion dollar plan(excluding the Canada Line because it is under construction) is just chum change as to what is needed in this province... we need over 500 busses TODAY... and the eline should have been done yesterday! Gordo would rather have a massive propoganda campaign to tell every british columbian of his transit plans... Prince Rupert or Fort Nelson or Cranbrook or Prince George do not care about what goes on in Surrey or Richmond and they do not want to see a massive ads telling them about the few things Gordo is actually doing in the past 8 years since forming Govt... moreover, Gordo wants to show that he is GREEN but he is not... here are a few facts that don't add up to a sustainable environment for BC:

[off topic]
* The day before that Campbell gave the go-ahead for coalbed methane extraction in Elk Valley, despite concerns from local residents
* And just a few days ago the Campbell government decided to plow ahead with highway construction on Delta farmland without waiting for the Agricultural Land Commission to make a ruling.
[off topic]
* Campbell has failed to keep his promise to invest in public transit -- Translink just reported they need another $150 million a year or they'll need to reduce services
Reply With Quote
     
     
  #28  
Old Posted Dec 11, 2008, 8:42 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by jlousa View Post
As far as I know the Feds have agreed to throw money at it (this is on top of the initial contribution) , I believe the funding is now only $100M short of the $1.4Billion budget.
So that means...

EVERGREEN LINE: $1.4-BILLION
- Province: $410-million
- Translink: $400-million
- Federal Gov't: $437-million
- needed: $100-million

The reason why we named RAV the Canada Line was because of the federal government's $450-million funding for the project. I wonder if we'll have to rename the Evergreen Line now.
Reply With Quote
     
     
  #29  
Old Posted Dec 11, 2008, 8:48 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by ravman View Post
The NDP was able to build the Expo line extension and the M Line as well, Plans were also there to build the E line ( and switches and the foundation for a third rail was also installed... dont believe me.... go there and look with your own eyes) the stations was specifically designed for the Eline extension... that project is ready to roll tmr and yet the govt is stalling... they would rather develop offshore oil or a massive methane drilling project near the Flathead valley,[off topic]. ABSOLUTELY NOTHING for British Columbians... the 12 billion dollar plan(excluding the Canada Line because it is under construction) is just chum change as to what is needed in this province... we need over 500 busses TODAY... and the eline should have been done yesterday! Gordo would rather have a massive propoganda campaign to tell every british columbian of his transit plans... Prince Rupert or Fort Nelson or Cranbrook or Prince George do not care about what goes on in Surrey or Richmond and they do not want to see a massive ads telling them about the few things Gordo is actually doing in the past 8 years since forming Govt... moreover, Gordo wants to show that he is GREEN but he is not... here are a few facts that don't add up to a sustainable environment for BC:

[off topic]
* The day before that Campbell gave the go-ahead for coalbed methane extraction in Elk Valley, despite concerns from local residents
* And just a few days ago the Campbell government decided to plow ahead with highway construction on Delta farmland without waiting for the Agricultural Land Commission to make a ruling.
[off topic]
* Campbell has failed to keep his promise to invest in public transit -- Translink just reported they need another $150 million a year or they'll need to reduce services
Pot, meet kettle.




Must every single post you make be a NDP advertisement?
Reply With Quote
     
     
  #30  
Old Posted Dec 11, 2008, 9:07 AM
Lead's Avatar
Lead Lead is offline
Registered User
 
Join Date: Oct 2006
Location: Surrey
Posts: 168
to the two guys on the last page I have a geog test thurs too...lol

but this extention to guildford is needed. like others have stated im not too sure how it would swing up to 104th... perhaps they want to encircle whalley with skytrain?
Reply With Quote
     
     
  #31  
Old Posted Dec 11, 2008, 9:28 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Blazed Member - Citygater
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,119
Quote:
Originally Posted by eduardo88 View Post
GO FALCO GO

(f1rst)
2econd!
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #32  
Old Posted Dec 11, 2008, 2:33 PM
nickinacan's Avatar
nickinacan nickinacan is offline
Traveller Extraodinaire
 
Join Date: May 2008
Posts: 355
Quote:
Originally Posted by mr.x2 View Post
Must every single post you make be a NDP advertisement?
It sure seems that way doesn't it?

The one thing that I absolutely can not stand about the current NDP is that their stance always has to completely oppose what the Liberals are doing. Campbell could say, "I love babies!" and James would immediately retort with, " I hate babies! More funding for public transit instead of Gateway! Olympics are stupid!"

I mean come on. A good idea is a good idea, no matter who the party is. The NDP will only be relevant with they start actually listening to what the people of BC want and need and start looking sane for once, rather than constantly aligning with the left wing nutbar special interest groups out there.

As for the announcement today, lets hope it is LRT for Surrey to Guildford, Newton and White Rock as well as out to UBC... and not skytrain.
Reply With Quote
     
     
  #33  
Old Posted Dec 11, 2008, 3:13 PM
Gordon Gordon is offline
Registered User
 
Join Date: Jul 2008
Posts: 1,063
I believe that part of the big announcement last January was extending the milenium line to UBC, so it has to be Skytrain
Reply With Quote
     
     
  #34  
Old Posted Dec 11, 2008, 3:39 PM
CoryHolmes CoryHolmes is offline
Registered User
 
Join Date: Sep 2008
Posts: 1,007
Whatever style of system they choose to use, it really has to be grade-seperated. I spent a year in Cow-gary and thought the design of the C-Train was utterly stupid.

Rail-road crossings at every intersection, thereby stopping the flow of traffic and making everyone wait. So sure, you get people out of their cars, but you leave up just that much more congestion on the roads.

The good part about Skytrain is that running the trains has very little impact on the road traffic around them. That is a must for any new rapid transit system, in my opinion.
Reply With Quote
     
     
  #35  
Old Posted Dec 11, 2008, 3:54 PM
flight_from_kamakura's Avatar
flight_from_kamakura flight_from_kamakura is offline
testify
 
Join Date: Mar 2008
Location: san francisco and montreal
Posts: 1,319
Quote:
The announcements come as TransLink faces a cash crunch by 2011.
they also come with 4 ndp seats in surrey and five months until the election.
Reply With Quote
     
     
  #36  
Old Posted Dec 11, 2008, 4:29 PM
nickinacan's Avatar
nickinacan nickinacan is offline
Traveller Extraodinaire
 
Join Date: May 2008
Posts: 355
Quote:
Originally Posted by CoryHolmes View Post
Whatever style of system they choose to use, it really has to be grade-seperated. I spent a year in Cow-gary and thought the design of the C-Train was utterly stupid.

Rail-road crossings at every intersection, thereby stopping the flow of traffic and making everyone wait. So sure, you get people out of their cars, but you leave up just that much more congestion on the roads.

The good part about Skytrain is that running the trains has very little impact on the road traffic around them. That is a must for any new rapid transit system, in my opinion.
It is a plus, but much more expensive. I would prefer LRT because it would cover more area at the same cost, but at the same time I don't really car which way it goes, just as long as everyone has more options for transit. I wonder if this announcement has anything to do with the delay in the redevelopment of Guildford Mall. It should have been started already.
Reply With Quote
     
     
  #37  
Old Posted Dec 11, 2008, 4:41 PM
yesheh yesheh is offline
Registered User
 
Join Date: Apr 2007
Posts: 54
Quote:
Originally Posted by ravman View Post
Plans were also there to build the E line ( and switches and the foundation for a third rail was also installed... dont believe me.... go there and look with your own eyes) the stations was specifically designed for the Eline extension... that project is ready to roll tmr and yet the govt is stalling...
Where is this exactly? At 104th? I've never seen such a thing.
Reply With Quote
     
     
  #38  
Old Posted Dec 11, 2008, 4:48 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,229
Quote:
Originally Posted by yesheh View Post
Where is this exactly? At 104th? I've never seen such a thing.
I think he means Evergreen Line when he says ELine (not Expo Line). i.e. @ Lougheed.
BTW - the Expo Line Surrey extensions (to Columbia, Scott Road and to King George were built under the Socreds, not the NDP) - it was Rita Johnson's riding - then BC's Minister of Highways and later first woman Premier.
Reply With Quote
     
     
  #39  
Old Posted Dec 11, 2008, 6:03 PM
David's Avatar
David David is offline
David
 
Join Date: Dec 2001
Location: Vancouver Island, British Columbia
Posts: 1,453
add me to the list of people with a geography test today.. that is pretty bizarre.
eagerly waiting to find out how this extension is going to work. i can't even picture in my head how it could reasonably loop up to 104th without being a total mess
Reply With Quote
     
     
  #40  
Old Posted Dec 11, 2008, 6:40 PM
ambaUp ambaUp is offline
Registered User
 
Join Date: Dec 2008
Posts: 46
Planning underway to extend SkyTrain to UBC and Expo Line into Surrey

Thursday, December 11 - 10:02:00 AM Erin Loxam

SURREY (NEWS1130) - The province has announced it's entering into a cost-sharing agreement with TransLink to work toward the extension of SkyTrain out to UBC and an expansion of the Expo Line into Surrey.

Transportation Minister Kevin Falcon made that announcement at the Gateway Station this morning. It's unknown when the expansion of transit in Surrey and the line to UBC will happen, or what either will look like.

Transportation Minister Kevin Falcon says that's the point of the 18-month planning and consultation process that is being funded 50/50 between the province and TransLink. "Most importantly, the $10 million will also include consultations with the public. We want to make sure that the public is involved and has some input into the types of technologies and the routing options that will be available."

The lines that are part of the province's $14 billion transit plan will involve extensions serving the 104th Avenue, Fraser and King George Highway corridors in Surrey, as well as the new line running from Commercial Drive to UBC. Falcon couldn't give a timeline as to when we might break ground on the projects or step onto a new train.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 2:14 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.