Lightbulb HOUSTON | Pearl Rosemont | FT | 13 FLOORS

Developer: The Morgan Group
Architect: Ziegler Cooper
Type: Multifamily
Location: 2704 Helena St, Midtown
Construction Timeline:

*Project on the table since 2014 is finally moving forward.

__________________
HAIF
     
     
  #2  
Old Posted Sep 20, 2018, 1:28 AM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,327
Houston: Morgan Group Plans Another Pearl Brand Luxury Tower

Quote:
Houston (Harris County) — Morgan Group has revived its plans to build a 13-story Pearl brand luxury apartment tower in the north end of Midtown.

The Pearl Rosemont project has been in the works since at least 2015, probably earlier. It was introduced then as a five-story wood frame podium style apartment building with zero building lines on all sides. It’s located at 102 Dennis Street, three blocks south of West Webster Street Park. The design firm was Wallace Garcia Wilson and it had a price tag of $20 million. It’s going to cost much more than that now.

It was supposed to have been built between July 2015 and July 2016 but more than three years later this 153-unit project remains listed on the Morgan website with a “TBD” anticipated opening date.

Meanwhile, Morgan did get underway on a Pearl brand project elsewhere in town. The Pearl Midtown is a six-story, 264-unit building with a 24-hour cyber cafe, resort style pool, retail and parking garage, located at 3120 Smith Street. Currently under construction, it’s scheduled to open end of the year.

Back to Pearl Rosemont, Morgan has submitted plans on the 102 Dennis Street project that on one document refer to it as Pearl on Helena. The project was before the Houston Planning Commission on Thursday for a 3-foot building line variance (zero line for balconies and overhangs) on Drew Street, a zero building line on Helena, and a 5-foot building line on Albany Street.

The project site is a full city block and has an area of 50,000 square feet. City staff took note that Morgan has moved the structure back from adjacent rights-of-way and increased the height.

“The Helena and Albany pedestrian realms will feature a distance of 26.5’ between the back of curb and proposed structure. The Drew and Denis pedestrian realms will each feature 15’ of space. The Albany pedestrian realm will feature additional space in order to protect the root structure of an existing mature tree. A tree protection easement is being required as a condition to approve the variance.”

The developer’s briefing notes to the commission recall its previous version:

“This project was previously approved for four floors of apartments over two floors of garage in July of 2014. This site is within
the Midtown TIRZ, which has an adopted Project Plan approved by Council that calls for buildings to be constructed up
close to the sidewalk as a way to promote a walkable pedestrian environment.

“The plan for this property is consistent with the Midtown Plan. An urban style apartment building with nine floors of apartments over a four-floor garage is proposed.”

“There is a very large street tree on Albany, which the builder proposes to save by notching the building back 8.5’. New trees to be planted will be a minimum of 3” caliper. Sidewalks will be a minimum of 6’. Other streetscape amenities will include pedestrian scale lighting and a mural from a local artist on one of the walls.
__________________
HAIF
     
     
  #3  
Old Posted Sep 16, 2019, 11:52 AM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,327
Activity:


wilcal via HAIF
__________________
HAIF
     
     
  #4  
Old Posted Nov 13, 2019, 4:21 PM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,327
Morgan Group to Break Ground on 13-Story Tower in Houston

Quote:
The developer behind a Pearl-branded apartment project where a new Whole Foods is opening in Houston's midtown area this week is already planning to move forward with another project about a half-mile away that has been on hold.

Morgan Group, a Houston-based developer that has built $3.1 billion worth of multifamily projects nationally, is reviving plans to build a 13-story luxury apartment tower at 102 Dennis St. in Houston.

The project is tucked on a quiet residential street in one of Houston’s hottest neighborhoods for apartment and retail development.

Construction on the new project is expected to start in December or the first quarter of 2020, Philip Morgan, vice president of the Morgan Group, said in an interview with CoStar News.

The developer's proposed Houston project will include 298 apartment units on top of a parking podium. The total project will be 260,000 square feet, Morgan said.
__________________
HAIF
     
     
  #5  
Old Posted Oct 21, 2021, 2:39 PM
Wattleigh's Avatar
Wattleigh Wattleigh is offline
FYHA
 
Join Date: Oct 2007
Location: Houston - Wichita, KS
Posts: 3,063
This one has been under construction for some time. Site work began late last year, and it has been rising since earlier this year.

Recent photos c/o 'cityliving' on HAIF





     
     
  #6  
Old Posted Feb 14, 2023, 8:15 PM
Wattleigh's Avatar
Wattleigh Wattleigh is offline
FYHA
 
Join Date: Oct 2007
Location: Houston - Wichita, KS
Posts: 3,063
This one is nearly complete.

But for some shots from the past...

12/4/2020 - c/o wilcal on HAIF



4/3/2021 - c/o hindesky on HAIF





9/12/2021 - c/o hindesky on HAIF



2/16/2022 - c/o hindesky on HAIF

6/11/2022 - c/o hindesky on HAIF





12/9/2022 - c/o hindesky on HAIF







1/13/2023 - c/o hindesky on HAIF









2/13/2023 - c/o cityliving on HAIF

     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 9:19 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.