https://static1.squarespace.com/stat...on+for+Web.pdf
Detailed renderings and site plans are around page 100 of the presentation for those of you who are interested.
I’m not sure if this was ever posted, but here is the detailed presentation for the point of the mountain/prison project. Quite a bit more is going on than I thought. This includes the fast-tracking of Light Rail from herriman/daybreak to the Draper front runner station, and then down through the prison site to connect with the future blue line extension to Orem. Also, they are looking into adding a second front runner station between draper and Lehi, as well as preserving the corridor for front runner to split off in the narrows and run through Saratoga Springs and into eagle mountain. 2 new BRT Lines are proposed as well, one running to downtown Sandy and the other from the Draper station along the future boulevard that will connect the site to Lehi/Saratoga Springs through the narrows. I’m quite impressed with the fact that only one major road addition (the new boulevard) is being proposed, in comparison to two new light rail lines, two new bus rapid transit lines, a potential new front runner line, as well as other public transportation improvements.
The overall site layout seems pretty detailed according to the many renderings and site plans. I’m curious as to if this is legitimately the planned layout? Or just an idea of what it could be. It seems quite a bit more dense that I think most people expected.