Quote:
Originally Posted by dave8721
Not that near by and 2027 is probably very generous. And its commuter rail, not mass transit (i.e. not expected to carry large amounts of people very often). That area needs real mass transit but that is probably 20 years away if ever. In the mean time all the office buildings being proposed up near midtown are madness.
|
It's nice that the immediate area is getting a commuter rail station in the near future, but Edgewater and points north needs frequent mass transit (Metrorail), and waiting another 20 years for such a proposal is very procrastinating.
Hopefully, once the North Extension to Hard Rock Stadium is completed, then an extension NE to Aventura, as well as another extension to FIU and possibly to Southland and Zoo Miami can be a reality by the 2030s.
BTW, any progress on the construction site?