HomeDiagramsDatabaseMapsForumSkyscraper Posters
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations

Reply

 
Thread Tools Display Modes
     
     
  #5181  
Old Posted Oct 1, 2017, 10:11 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Los Angeles
Posts: 14,696
Salt Lake City & MSA/CSA Rundown



Downtown, Looking Northwest from above Library Square.

@perry_layne_productions https://www.instagram.com/p/BVxsozJljOQ/

Last edited by delts145; Oct 8, 2017 at 8:36 AM.
Reply With Quote
     
     
  #5182  
Old Posted Oct 8, 2017, 8:51 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Los Angeles
Posts: 14,696
Downtown Adj. - Update, Salt Lake City Int. Airport

Isaac Riddle Reports - Full Article @ http://www.buildingsaltlake.com/airp...halfway-point/



Isaac Riddle Reports - Construction of the first phase of the new Salt Lake City International Airport has passed the halfway point. The first phase consists of a new consolidated terminal, south concourse, parking garage, gateway welcome center and the recently completed rental car facility...The new airport will have over 70 gates and will be built to LEED Gold standards, making it one of the most energy efficient airports in the country. The new main terminal will be three levels and will be designed to reflect Utah’s geography, with interior and exterior materials intended to resemble the variable terrains that create a sense of place unique to Utah. Included in the main terminal will be an artificial canyon, resembling the canyons of Southern Utah...Besides rising construction costs, the ongoing construction project will require additional workers. According to airport officials, they have employed 700 construction workers so far but will eventually need up to 2,000 workers. Employing that many new workers could prove challenging as the industry is already underemployed...


The northeast corner of the west concourse of the south terminal. Image courtesy the Salt Lake City International Airport.


Rendering of the new terminal. Courtesy of the Salt Lake International Airport staff.


Rendering of the new terminal. Courtesy of the Salt Lake International Airport staff.


Rendering of the new terminal. Courtesy of the Salt Lake International Airport staff.


Rendering Overview. Courtesy of the Salt Lake International Airport staff.

.

Last edited by delts145; Oct 8, 2017 at 9:44 AM.
Reply With Quote
     
     
  #5183  
Old Posted Oct 9, 2017, 9:25 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Los Angeles
Posts: 14,696
Downtown Adj. - Updates - Salt Lake City International Airport

Quote:
Originally Posted by Sight-Seer View Post
This is north end of the new terminal. The big glass wall will be at the right. At the foreground right is where the new east concourse will be built after the old concourse is demolished. In the second photo they are starting to work on the deck of the elevated roadway.

(edit) When I looked at the full-size (huge) photo, I noticed the big crane they've moved into position on the other side. Things are definitely going to start happening there.



Pics By Sight-Seer

.
Reply With Quote
     
     
  #5184  
Old Posted Oct 17, 2017, 4:35 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Los Angeles
Posts: 14,696
Downtown Update - California Developers Planning New Downtown Tower

Isaac Riddle Reports - Full Article @ http://www.buildingsaltlake.com/cali...owntown-tower/

According to Robert Held, the president and chief executive officer of Held Properties, the developers hope to
start construction next year on a 27 story mixed-use building currently referred to as the 370 Millennium Tower...

...While the building’s design and specific floor plans are still being finalized, the proposed uses are already determined.
The 370 Millennium Tower will include a mix of commercial office space, retail space, a hotel and residential condominiums...



Conceptual rendering of the first few floors of the proposed 370 Millennium Tower. The developers are still working on the building's final design. Image courtesy Held Properties.


Conceptual rendering of the proposed 370 Millennium Tower. The developers are still working on the building’s final design. Image courtesy Held Properties.

.

Last edited by delts145; Oct 17, 2017 at 8:36 PM.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 2:38 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2017, vBulletin Solutions, Inc.