  #4321  
Old Posted Jun 23, 2018, 3:34 PM
freerover freerover is offline
Registered User
 
Join Date: Nov 2017
Posts: 2,274
Quote:
Originally Posted by masonh2479 View Post
Could the port have already been doing the design while this extension is underway. If so then once this extension is done then can move right into the construction phase.

I do agree with you that a West terminal infill makes sense and would add some security lines that are desperately needed.
They don’t even know what they are designing next. They need to approve the preferred expansion for the new master plan then send out for bids on design and engineering. Then they need council approval on the firm they recommend and then sigh all the contracts. Then design can start.
Reply With Quote
     
     
  #4322  
Old Posted Jun 23, 2018, 3:47 PM
masonh2479 masonh2479 is offline
Registered User
 
Join Date: Sep 2017
Location: AUS/ATW
Posts: 1,045
Quote:
Originally Posted by freerover View Post
They don’t even know what they are designing next. They need to approve the preferred expansion for the new master plan then send out for bids on design and engineering. Then they need council approval on the firm they recommend and then sigh all the contracts. Then design can start.
Hmm, for being so far behind the port and cc really don’t seem to care and are ok with continuing on at a snails pace. I wish the port could get stuff done faster. New Orleans built a whole new 30 something gate terminal in around the same time that will have taken us to add 9 gates.

Imagine what we would of had done by now if the port was privatized.
Reply With Quote
     
     
  #4323  
Old Posted Jun 23, 2018, 5:24 PM
khowaga's Avatar
khowaga khowaga is offline
Registered User
 
Join Date: Nov 2017
Location: Austin, TX
Posts: 541
Quote:
Originally Posted by masonh2479 View Post
Could the port have already been doing the design while this extension is underway. If so then once this extension is done then can move right into the construction phase.

I do agree with you that a West terminal infill makes sense and would add some security lines that are desperately needed.
I doubt they would have been doing all this master plan stuff if they were already in design. They do appear to have narrowed down their choices significantly, though. The survey on the website is “here’s the choice everyone likes, you ok with it?”

Plus the budget for the expansion still has to go through city council. They can move fast, but there will probably be some downtime in between.
Reply With Quote
     
     
  #4324  
Old Posted Jun 23, 2018, 5:45 PM
Tyrone Shoes Tyrone Shoes is online now
Registered User
 
Join Date: Nov 2013
Posts: 400
Quote:
Originally Posted by khowaga View Post

Plus the budget for the expansion still has to go through city council. They can move fast, but there will probably be some downtime in between.
I can hear the silly council debating the terminal expansion.....

"....add on to the terminal but we planned on putting affordable housing on that site....."
__________________
Good night Austin Texas where ever you are..." Frank Zappa
Reply With Quote
     
     
  #4325  
Old Posted Jun 23, 2018, 5:56 PM
masonh2479 masonh2479 is offline
Registered User
 
Join Date: Sep 2017
Location: AUS/ATW
Posts: 1,045
Quote:
Originally Posted by Tyrone Shoes View Post
I can hear the silly council debating the terminal expansion.....

"....add on to the terminal but we planned on putting affordable housing on that site....."
“The council is going to delay the decision to further study the budget” *head banging against wall*
Reply With Quote
     
     
  #4326  
Old Posted Jun 23, 2018, 6:36 PM
ILUVSAT's Avatar
ILUVSAT ILUVSAT is offline
May the Schwartz be w/ U!
 
Join Date: Sep 2013
Location: Nomadic
Posts: 1,734
Quote:
Originally Posted by masonh2479 View Post
...New Orleans built a whole new 30 something gate terminal in around the same time that will have taken us to add 9 gates.
No, not really. In fact, that port is still under construction and it has been a LONG, LONG time in the planning.
Reply With Quote
     
     
  #4327  
Old Posted Jun 23, 2018, 7:55 PM
masonh2479 masonh2479 is offline
Registered User
 
Join Date: Sep 2017
Location: AUS/ATW
Posts: 1,045
Quote:
Originally Posted by ILUVSAT View Post
No, not really. In fact, that port is still under construction and it has been a LONG, LONG time in the planning.
Yep it’s still under construction, I just checked on it and it has 35 gates, began construction January 14, 2016 and is scheduled to be done February 2019. For Austin their website says the cc authorized the funds in October 2015 and the 9 gate expansion is scheduled to be done in 2019. I don’t remember when the expansion started construction but it was probably either late 2015 or early 2016. Even considering the long planning phase for New Orleans, they managed to get a lot more done in the same construction timephrame. I’m sure ABIA took a long time to plan the extension as well, probably not as long as New Orleans, though.
http://www.flymsy.com/capitalimprove...r-Construction
Reply With Quote
     
     
  #4328  
Old Posted Jun 23, 2018, 10:18 PM
masonh2479 masonh2479 is offline
Registered User
 
Join Date: Sep 2017
Location: AUS/ATW
Posts: 1,045
Anyone know what happened with the new cell phone lot and retail center? I thought it was supposed to open end of last year.
Reply With Quote
     
     
  #4329  
Old Posted Jun 24, 2018, 12:19 AM
khowaga's Avatar
khowaga khowaga is offline
Registered User
 
Join Date: Nov 2017
Location: Austin, TX
Posts: 541
Quote:
Originally Posted by masonh2479 View Post
Anyone know what happened with the new cell phone lot and retail center? I thought it was supposed to open end of last year.
Yeah. I tweeted the city and they said there were permitting and construction issues, and the new ETA is end of this year.
Reply With Quote
     
     
  #4330  
Old Posted Jun 24, 2018, 3:15 AM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Location: Austin <------------> Birmingham?
Posts: 57,327
I was outside giving my dogs a bath again this evening and saw another 747 fly straight over us. It was definitely lower than the next jet that flew over. I know I mentioned it before and someone said it's because it's a bigger jet, but it was definitely lower and much louder. The thing is, the 747s are taking off from the west runway, so they're at least 2 miles closer to the city than planes taking off from the east runway. There's another flight scheduled tomorrow. I'll see if I can get a photo of it coming over.

https://flightaware.com/live/flight/...335Z/KAUS/EGLL
__________________
Conform or be cast out.
Reply With Quote
     
     
  #4331  
Old Posted Jun 24, 2018, 3:42 PM
khowaga's Avatar
khowaga khowaga is offline
Registered User
 
Join Date: Nov 2017
Location: Austin, TX
Posts: 541
Quote:
Originally Posted by KevinFromTexas View Post
I was outside giving my dogs a bath again this evening and saw another 747 fly straight over us. It was definitely lower than the next jet that flew over. I know I mentioned it before and someone said it's because it's a bigger jet, but it was definitely lower and much louder. The thing is, the 747s are taking off from the west runway, so they're at least 2 miles closer to the city than planes taking off from the east runway. There's another flight scheduled tomorrow. I'll see if I can get a photo of it coming over.

https://flightaware.com/live/flight/...335Z/KAUS/EGLL
Tomorrow and every day til the last week in October!

It’s def louder but not substantially lower than other traffic (I watch the planes come in from my office window) — maybe a couple of hundred feet lower than the smaller birds, but it’s not that far off from, say, the Norwegian 789.
Reply With Quote
     
     
  #4332  
Old Posted Jun 24, 2018, 3:59 PM
masonh2479 masonh2479 is offline
Registered User
 
Join Date: Sep 2017
Location: AUS/ATW
Posts: 1,045
Quote:
Originally Posted by khowaga View Post
Yeah. I tweeted the city and they said there were permitting and construction issues, and the new ETA is end of this year.
Well that royally sucks. Hopefully the issues get solved soon.
Reply With Quote
     
     
  #4333  
Old Posted Jun 24, 2018, 4:06 PM
masonh2479 masonh2479 is offline
Registered User
 
Join Date: Sep 2017
Location: AUS/ATW
Posts: 1,045
Quote:
Originally Posted by khowaga View Post
Tomorrow and every day til the last week in October!

It’s def louder but not substantially lower than other traffic (I watch the planes come in from my office window) — maybe a couple of hundred feet lower than the smaller birds, but it’s not that far off from, say, the Norwegian 789.
A bird that size takes so much to slow it down that the controllers have to bring it in at a lower angle than other jets. The 747 just really loves to fly and fly fast. The plane that I fly now could practically nose dive into the runway and be able to slow down enough to land.

While having the 747 is awesome, I feel bad for those who paid a ton to fly on it. We have the tired, old version of BA’s 747 interior. It would be nice if for the next summer we got a new interior 747 or even a 773. Eventually it would be awesome to have one of their new A350-1000’s fly here. I have been reading from a.neters that the flights have been really full so I wonder if eventually we’ll see a 2x daily operation.

Last edited by masonh2479; Jun 24, 2018 at 6:13 PM.
Reply With Quote
     
     
  #4334  
Old Posted Jun 24, 2018, 6:34 PM
khowaga's Avatar
khowaga khowaga is offline
Registered User
 
Join Date: Nov 2017
Location: Austin, TX
Posts: 541
Quote:
Originally Posted by masonh2479 View Post
A bird that size takes so much to slow it down that the controllers have to bring it in at a lower angle than other jets. The 747 just really loves to fly and fly fast. The plane that I fly now could practically nose dive into the runway and be able to slow down enough to land.

While having the 747 is awesome, I feel bad for those who paid a ton to fly on it. We have the tired, old version of BA’s 747 interior. It would be nice if for the next summer we got a new interior 747 or even a 773. Eventually it would be awesome to have one of their new A350-1000’s fly here. I have been reading from a.neters that the flights have been really full so I wonder if eventually we’ll see a 2x daily operation.
Have they announced that they’re bringing it back next year?

BA is also announcing a new Club World product which I cannot wait to see. Hopefully we’ll get that fast, too...
Reply With Quote
     
     
  #4335  
Old Posted Jun 24, 2018, 6:47 PM
masonh2479 masonh2479 is offline
Registered User
 
Join Date: Sep 2017
Location: AUS/ATW
Posts: 1,045
Quote:
Originally Posted by khowaga View Post
Have they announced that they’re bringing it back next year?

BA is also announcing a new Club World product which I cannot wait to see. Hopefully we’ll get that fast, too...
No it’s not been announced but if the rumors that the flights have been full are true it is safe to assume that we have a good chance of seeing the Queen next year too. That new Club World product would be great to have!

Just did some dummy bookings and we have the 747 again next year.

Also, apparently there was a power outage today at the South Terminal.
Reply With Quote
     
     
  #4336  
Old Posted Jun 25, 2018, 2:38 PM
We vs us We vs us is offline
Registered User
 
Join Date: Sep 2015
Location: Austin, TX
Posts: 3,588
Quote:
Originally Posted by khowaga View Post
I doubt they would have been doing all this master plan stuff if they were already in design. They do appear to have narrowed down their choices significantly, though. The survey on the website is “here’s the choice everyone likes, you ok with it?”

Plus the budget for the expansion still has to go through city council. They can move fast, but there will probably be some downtime in between.
I wonder if this is why Delta has been so quiet about the focus city announcement. They might be waiting for the master planning workshops to play out first.
Reply With Quote
     
     
  #4337  
Old Posted Jun 25, 2018, 2:43 PM
aman0328 aman0328 is offline
Registered User
 
Join Date: Mar 2017
Posts: 10
As someone who works inside of ABIA, I cannot reveal any cost numbers, but the airport has already began to plant the seeds of a new terminal to the South of the current one with 20+ gates. This is supposedly scheduled to begin around 2019-2020. Also, the reason it takes us so much longer than other cities to build things especially for the airport is the surrounding community, ecosystem and the tardiness of City Council. Especially because of the floodplain issues the airport always faces, the 9 gate expansion has taken lots of time. But hold your breath because within a year a lot is about to happen.
Reply With Quote
     
     
  #4338  
Old Posted Jun 25, 2018, 2:45 PM
We vs us We vs us is offline
Registered User
 
Join Date: Sep 2015
Location: Austin, TX
Posts: 3,588
Quote:
Originally Posted by aman0328 View Post
as someone who works inside of abia, i cannot reveal any cost numbers, but the airport has already began to plant the seeds of a new terminal to the south of the current one with 20+ gates. This is supposedly scheduled to begin around 2019-2020. Also, the reason it takes us so much longer than other cities to build things especially for the airport is the surrounding community, ecosystem and the tardiness of city council. Especially because of the floodplain issues the airport always faces, the 9 gate expansion has taken lots of time. But hold your breath because within a year a lot is about to happen.
+1!
Reply With Quote
     
     
  #4339  
Old Posted Jun 25, 2018, 4:48 PM
AUS AUS is offline
Registered User
 
Join Date: Mar 2015
Posts: 53
Parking

Throughout the past few weeks, I have noticed that parking lots have been completely full at the airport. However, the newly opened parking lot J is not being used. Does anyone know why that is? Seems like it would be needed these days.
Reply With Quote
     
     
  #4340  
Old Posted Jun 25, 2018, 5:07 PM
aschwab aschwab is offline
Registered User
 
Join Date: Feb 2018
Posts: 112
Quote:
Originally Posted by AUS View Post
Throughout the past few weeks, I have noticed that parking lots have been completely full at the airport. However, the newly opened parking lot J is not being used. Does anyone know why that is? Seems like it would be needed these days.
I am about to give up on airport owned parking and start booking the off site places.

I just like walking instead of relying on buses. But, it has become impossible to park there for weekend trips. They need to continue to build parking garages in existing lots.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin
Forum Jump