Old Posted Feb 9, 2006, 8:35 PM
soleri soleri is offline
Registered User
 
Join Date: Jun 2005
Posts: 4,246
Arrow 44 W Monroe




We've got various threads going on this one, and I hate to create another one, but in the interests of clarity a simple title works best.

Here's are some pictures I took yesterday. The best place to view the activity is from the 3rd floor pool deck of the San Carlos Hotel. Simply take the elevator up, turn right and walk to the end of hall through the exit doors (which are not locked during regular hours).

Right now, the caisson work is underway:






Pool area of the San Carlos:

Last edited by soleri; Feb 10, 2006 at 4:22 AM.
Reply With Quote
     
     
  #2  
Old Posted Feb 10, 2006, 7:19 AM
phx623's Avatar
phx623 phx623 is offline
At peace with nothing
 
Join Date: Mar 2004
Location: Peoria, AZ
Posts: 339
Now that construction has started on this project and Summit at Copper Square, we can offically say that there will be three new towers rising in 2006:

1.) 44 Monroe (34 stories)

2.) Summit at Copper Square (22 stories)

3.) Convention Hotel (31 stories)

I don't care what anybody says, this is a big year for Phoenix.
__________________
Passion is a curse and a blessing – Inspiring in the best of times, haunting in the worst.
Reply With Quote
     
     
  #3  
Old Posted Feb 10, 2006, 8:04 AM
Upward's Avatar
Upward Upward is offline
Registered User
 
Join Date: Aug 2001
Location: Seattle, WA
Posts: 8,047
Here's how the site looked on May 7, 2005



The old building was still there. Unfortunately, the cynic in me won't believe that the new tower is actually going up (instead of the site having been cleared just to inflate its value) until some part of it is constructed.
Reply With Quote
     
     
  #4  
Old Posted Feb 10, 2006, 10:08 AM
oliveurban's Avatar
oliveurban oliveurban is offline
Registered User
 
Join Date: Feb 2004
Location: Tempe, AZ
Posts: 2,908
Quote:
Originally Posted by phx623
I don't care what anybody says, this is a big year for Phoenix.


Agreed.
Reply With Quote
     
     
  #5  
Old Posted Feb 10, 2006, 2:19 PM
PHX31's Avatar
PHX31 PHX31 is offline
Registered User
 
Join Date: Aug 2001
Location: PHX
Posts: 7,159
Throw in W hotel *hopefully*. But I can't wait to watch 3 towers rise.
Reply With Quote
     
     
  #6  
Old Posted Feb 10, 2006, 3:15 PM
somethingfast's Avatar
somethingfast somethingfast is offline
Registered User
 
Join Date: Jul 2005
Location: In A Van Down By The River
Posts: 783
This is great news! Actually starting a project is huge! Two years from now Phoenix will look much different and much more dense (if not taller). Awesome!
Reply With Quote
     
     
  #7  
Old Posted Feb 18, 2006, 8:21 PM
soleri soleri is offline
Registered User
 
Join Date: Jun 2005
Posts: 4,246
Got a "scoop" today about the crane on this project. Apparently, the adjacent property owners have to approve the crane's wide swing over their property. The owner of the parking garage, who still has concerns about the shoring on his south foundation wall, will not give that approval. The result is that the crane here will have to be re-engineered away from the garage to avoid their air space. It will be smaller as a result, with construction slower and costlier.
Reply With Quote
     
     
  #8  
Old Posted Feb 18, 2006, 8:59 PM
Upward's Avatar
Upward Upward is offline
Registered User
 
Join Date: Aug 2001
Location: Seattle, WA
Posts: 8,047
Give me a break!
Reply With Quote
     
     
  #9  
Old Posted Feb 18, 2006, 9:12 PM
Vicelord John Vicelord John is offline
BANNED
 
Join Date: Sep 2005
Location: Eastlake, Phoenix, Arizona
Posts: 5,404
Quote:
Originally Posted by soleri
Got a "scoop" today about the crane on this project. Apparently, the adjacent property owners have to approve the crane's wide swing over their property. The owner of the parking garage, who still has concerns about the shoring on his south foundation wall, will not give that approval. The result is that the crane here will have to be re-engineered away from the garage to avoid their air space. It will be smaller as a result, with construction slower and costlier.
what an asshole. Seriously, he is just mad because nobody wants to rent in his shitty building except a gross pizze joint.
Reply With Quote
     
     
  #10  
Old Posted Feb 19, 2006, 12:18 AM
oliveurban's Avatar
oliveurban oliveurban is offline
Registered User
 
Join Date: Feb 2004
Location: Tempe, AZ
Posts: 2,908
Interesting.
Reply With Quote
     
     
  #11  
Old Posted Feb 22, 2006, 11:49 PM
soleri soleri is offline
Registered User
 
Join Date: Jun 2005
Posts: 4,246
As of this morning, the caisson work is going full-bore ( so to speak). At the very least, we're going to get an excellent foundation. I'm feeling better by the day.

Reply With Quote
     
     
  #12  
Old Posted Mar 15, 2006, 4:23 AM
soleri soleri is offline
Registered User
 
Join Date: Jun 2005
Posts: 4,246
Taking a peak last night after the bond rally, they've got the night lights on and crews still working. Good sign!
Reply With Quote
     
     
  #13  
Old Posted Mar 15, 2006, 4:52 AM
PHX's Avatar
PHX PHX is offline
Registered User
 
Join Date: Mar 2006
Posts: 64
Such a tease, when will we see a tower crane on this project.
Reply With Quote
     
     
  #14  
Old Posted Mar 15, 2006, 5:02 AM
soleri soleri is offline
Registered User
 
Join Date: Jun 2005
Posts: 4,246
^I'll guess within a month. The caisson work is proceeding and it appears several weeks away from completion. I'll wager April 11 for the crane.
Reply With Quote
     
     
  #15  
Old Posted Mar 28, 2006, 6:18 PM
soleri soleri is offline
Registered User
 
Join Date: Jun 2005
Posts: 4,246
Caissons keep rolling along:


I talked to the salesman at 44 Monroe today. Of the 202 units, only 65 are sold. You can get a 740 sf unit for only $399,900! 9th floor, but still.....
Reply With Quote
     
     
  #16  
Old Posted Mar 28, 2006, 7:44 PM
InfillJunkie
Guest
 
Posts: n/a
Soleri, how long have they been doing presales? 65 is not even close to 50%.
Reply With Quote
     
     
  #17  
Old Posted Mar 28, 2006, 9:33 PM
soleri soleri is offline
Registered User
 
Join Date: Jun 2005
Posts: 4,246
^The reservations list was over 75% full but the public report took a long time to generate. By the time it did - in late December - the investors who were fueling the condo boom were packing up and leaving for Texas.

I don't know the answer in this particular case, but usually the rule of thumb is at least 40% pre-sales before a project gets financing. Somehow, the developer got the financing prior to the public report (thus enabling actual sales' contracts). The answer may lie in the peculiar history of this project, which was originally a condo conversion of an old office building. It had sold out when the developer, sensing the oncoming boom in late 2004, decided to simply demolish the building and go with the much bigger new construction. At any rate, Phoenix is lucky to get this.
Reply With Quote
     
     
  #18  
Old Posted Mar 28, 2006, 9:44 PM
Boisebro's Avatar
Boisebro Boisebro is offline
All man. Half nuts.
 
Join Date: Apr 2005
Location: Boise, Idaho
Posts: 3,562
you know, that design would make a fine replacement for BoiseTower! it's even got a little bit of earthtones in the bottom to appease our design review gurus!
__________________
“Travel is fatal to prejudice, bigotry, and narrow-mindedness.”―Mark Twain
“The world is a book, and those who do not travel read only one page.”―Saint Augustine
“Travel is the only thing you buy that makes you richer.”―Anonymous
Reply With Quote
     
     
  #19  
Old Posted Mar 28, 2006, 10:37 PM
Vicelord John Vicelord John is offline
BANNED
 
Join Date: Sep 2005
Location: Eastlake, Phoenix, Arizona
Posts: 5,404
Quote:
Originally Posted by soleri

I don't know the answer in this particular case, but usually the rule of thumb is at least 40% pre-sales before a project gets financing. Somehow, the developer got the financing prior to the public report (thus enabling actual sales' contracts).
you do know that you cannot sell a home/condo/anything without the public report, right? Financing in place or not.
Reply With Quote
     
     
  #20  
Old Posted Mar 30, 2006, 8:30 AM
loftlovr's Avatar
loftlovr loftlovr is offline
Registered User
 
Join Date: Feb 2006
Location: Phoenix
Posts: 1,016
Grace gets private financing with their projects. -Or at least a decent chunk from private investors through "profit sharing"... I imagine with this downpayment the bank gives them more favorable interest rates and may have seen a huge "interest list" rather than actual lot reservations and deemed that as a sign of security.

I wonder if Grace regrets their decision not to "take their money and run".. -They'd be sold out and finished with construction probably had they not decided to chase the money and build taller.

Either way- I am happy because I like the height and design. Downtown will get there soon- you watch!
I am young and optimistic I know-
I also know this has been said for the last 10 years...
But I feel it- too many cool projects coming. ASU is the clincher.
Word
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southwest
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 7:49 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.