3343 Morgan Avenue - 14s and 12s (Under Construction)

Old Oak is proposing 2 towers (14s and 12s) on this parcel of land in between Wonderland and Wharncliffe and the new Bradley. Also some townhomes.

They also have a third tower up at Hyde Park planned and the 2nd tower upto the 6th floor of 16 floors underway.

They also have a proposal for 2 16s on Richmond St north of Sunningdale Rd.

Not to mention their 515 Richmond St 32s tower.

http://www.london.ca/business/Planni...2017-06-21.pdf
Reply With Quote
     
     
  #2  
Old Posted Jun 16, 2017, 1:23 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
The Vomit Bag.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 44,909
I keep being amazed at how people would want to live in banal highrise buildings out in big box barf land (timbuktu); whether it is the dumbcentre area at Southdale or the other dumbcentre area at Hyde Parking Lot. Seems like the worst of both worlds. Why not live somewhere interesting, like the core?
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell)
Reply With Quote
     
     
  #3  
Old Posted Jun 16, 2017, 7:50 PM
kaiserLDN kaiserLDN is offline
Registered User
 
Join Date: Sep 2016
Location: London
Posts: 385
Awesome!! Keep building out London from all sides and upwords!! This area should have a lot of cranes up over the next few years. Close to shopping and a highway. They need these to keep the population up with the commercial developments along Wonderland Rd.
Reply With Quote
     
     
  #4  
Old Posted Jun 26, 2017, 10:41 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
Old Oak says they plan to start in 18 months.

http://www.lfpress.com/2017/06/25/ap...dons-southwest
Reply With Quote
     
     
  #5  
Old Posted Jun 28, 2017, 1:29 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
The Vomit Bag.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 44,909
Josh Morgan Avenue?
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell)
Reply With Quote
     
     
  #6  
Old Posted Jun 25, 2021, 7:34 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
Looks like Old Oaks has building permit for the 12s building. Wonder if they plan to hold off on starting until CF crews have fully moved into the Centro towers build. You'd think they would want to concentrate their workforce on progressing the Centro construction before taking on another site.
Reply With Quote
     
     
  #7  
Old Posted Jul 23, 2021, 11:40 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
Going to Planning committee to get holding provisions removed on the blocks in this subdivision plan.


https://pub-london.escribemeetings.c...cumentId=82714
Reply With Quote
     
     
  #8  
Old Posted Sep 26, 2021, 7:22 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
Old Oak has the pit excavated now and the tower crane is half assembled now. Looks like Concrete Forming is also doing the first of the two buildings for this site. The north building which fronts Bradley is going up first.
Reply With Quote
     
     
  #9  
Old Posted Oct 15, 2021, 4:08 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
Tower crane is now fully installed.
Reply With Quote
     
     
  #10  
Old Posted Nov 11, 2021, 1:34 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
A lot of progress with forming and steel rebar for the floating raft slab foundation. Nearing completion and should see a major concrete pour within a week.
Reply With Quote
     
     
  #11  
Old Posted Nov 27, 2021, 9:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
Floating raft slab is now poured. Starting the steel rebar for the posts and walls.
Reply With Quote
     
     
  #12  
Old Posted Jan 11, 2022, 1:13 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
Now have the L1 wall along the north side of pit poured. Also some of the L1 posts are now poured.
Reply With Quote
     
     
  #13  
Old Posted Jan 30, 2022, 8:20 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
Have made good progress on the L1 walls and posts. West side now poured and have steel up on the east side.
Reply With Quote
     
     
  #14  
Old Posted Feb 17, 2022, 4:42 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
L1 walls and posts are poured now. Appear to be setting up for the L1 slab pour now. Forming for the ground floor slab will follow after that.
Reply With Quote
     
     
  #15  
Old Posted Feb 27, 2022, 7:31 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
Forming for ground floor slab on the west side of building has started. As have the excavation of the underground pit towards the south of the property. The plans show a row of town homes along Morgan in between the north tower and south tower. Looks like they plan one level of underground parking under the entire project.
Reply With Quote
     
     
  #16  
Old Posted Mar 20, 2022, 3:01 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
Officially above ground with some of the elevator shaft walls now poured. L1 floor slab is now poured and forming for ground floor slab is complete. Should see steel rebar installation for ground floor slab this week and the concrete pour with a week.
Reply With Quote
     
     
  #17  
Old Posted Apr 14, 2022, 7:24 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
About 75% done with the ground floor wall and posts pours.
Reply With Quote
     
     
  #18  
Old Posted Apr 30, 2022, 4:00 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
Forming for 2nd floor slab now started on the west end. Still have some forming to do on the ground floor walls and posts on the east end.
Reply With Quote
     
     
  #19  
Old Posted Jun 14, 2022, 5:06 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
Still working on the east side ground floor walls and post forming. Some forming started for 2nd floor walls on the west side.
Reply With Quote
     
     
  #20  
Old Posted Aug 4, 2022, 7:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,786
Have now got some of the 3rd floor slab poured on the west end and forming up for 3rd floor walls. Forming for 3rd floor slab on the east end appears to be setup for a two level lobby atrium. Have been pouring and forming the underground L1 level on the south side of building.

Last edited by jammer139; Aug 7, 2022 at 1:20 AM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 9:08 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.