Going to redo the floors next. There's a little too much texture on the tower as-is.
That's better.
A survey of the two types of cladding methods used in the first 3 floors. The lobby area on Greenwich uses a cable-net tension system to virtually eliminate framing. The retail area uses a more conventional framing method, though the panes of glass are very large. They size up to 10 feet x ~15 feet.
Messing around with the X-braces. This one should be done tomorrow...(realizes it's 4AM)...err...sometime today.