This seems to be what they've used on the 'pedestrian' underpass for TGH at Sobey's Square. This one runs under the off-ramp to Topsail Rd. They'll need to do something for the TGH and the on-ramp from Topsail Rd, but there's still no sign of any other work in that area (other than the Topsail Rd overpass).



Last edited by rthomasd; Aug 27, 2017 at 5:01 PM.
Reply With Quote
     
     
  #1002  
Old Posted Aug 27, 2017, 4:03 PM
jjavman jjavman is offline
Registered User
 
Join Date: Apr 2011
Location: NL
Posts: 456
Quote:
Originally Posted by rthomasd View Post
This seems to be what they've used on the 'pedestrian' underpass for TGH at Sobey's Square. This one runs under the off-ramp to Topsail Rd. They'll need to do something for the TGH and the on-ramp from Topsail Rd, but there's still no sign of any other work in that area (other than the Topsail Rd overpass).
Interesting.

Still researching why they are not used more for roads here.

Seems there are several pre-cast examples on the web for quick cut & fill underpasses.

Reply With Quote
     
     
  #1003  
Old Posted Aug 27, 2017, 4:05 PM
ConundrumNL ConundrumNL is offline
Registered User
 
Join Date: Oct 2009
Location: St. John's
Posts: 335
Had a conversation with the manager of Liquid Assets at the Halifax airport while waiting for a connection. Apparently, they are seriously looking at opening a location in YYT after the renovations/expansion is completed.
Reply With Quote
     
     
  #1004  
Old Posted Aug 27, 2017, 9:45 PM
Arrakis Arrakis is offline
Registered User
 
Join Date: Mar 2012
Location: St. John's, Newfoundland
Posts: 1,277
And Liquid Assets is what exactly?

Quote:
Originally Posted by ConundrumNL View Post
Had a conversation with the manager of Liquid Assets at the Halifax airport while waiting for a connection. Apparently, they are seriously looking at opening a location in YYT after the renovations/expansion is completed.
Reply With Quote
     
     
  #1005  
Old Posted Aug 27, 2017, 10:03 PM
rthomasd rthomasd is offline
Registered User
 
Join Date: Mar 2012
Posts: 426
They sell wine, beer, spirits and cider.
Reply With Quote
     
     
  #1006  
Old Posted Aug 30, 2017, 4:28 PM
Engibeer's Avatar
Engibeer Engibeer is offline
Registered User
 
Join Date: Aug 2014
Location: YYT/YYC
Posts: 110
Some changes coming to traffic flow at the bottom of signal hill (as a pilot project). Looks like a much needed improvement in my opinion.

http://www.cbc.ca/news/canada/newfou...ject-1.4268340
Reply With Quote
     
     
  #1007  
Old Posted Aug 30, 2017, 4:42 PM
colinpeddle colinpeddle is offline
Registered User
 
Join Date: Feb 2013
Posts: 134
So Cooks hill becomes a super-shortcut. One way on Cooks hill needs to be opposite direction.
Reply With Quote
     
     
  #1008  
Old Posted Aug 31, 2017, 10:46 AM
Engibeer's Avatar
Engibeer Engibeer is offline
Registered User
 
Join Date: Aug 2014
Location: YYT/YYC
Posts: 110
Quote:
Originally Posted by colinpeddle View Post
So Cooks hill becomes a super-shortcut. One way on Cooks hill needs to be opposite direction.
Agreed, good point.
Reply With Quote
     
     
  #1009  
Old Posted Sep 2, 2017, 3:43 AM
NewfBC NewfBC is offline
Registered User
 
Join Date: May 2007
Location: Vancouver, BC
Posts: 1,085
Quote:
Originally Posted by ConundrumNL View Post
Had a conversation with the manager of Liquid Assets at the Halifax airport while waiting for a connection. Apparently, they are seriously looking at opening a location in YYT after the renovations/expansion is completed.
Quote:
Originally Posted by Arrakis View Post
And Liquid Assets is what exactly?
Quote:
Originally Posted by rthomasd View Post
They sell wine, beer, spirits and cider.
Private liquor stores are permitted in NL? Since?

Ron.
Reply With Quote
     
     
  #1010  
Old Posted Sep 2, 2017, 2:08 PM
Marty_Mcfly's Avatar
Marty_Mcfly Marty_Mcfly is offline
Registered User
 
Join Date: Feb 2009
Location: St. John's, NL
Posts: 7,169
Quote:
Originally Posted by NewfBC View Post
Private liquor stores are permitted in NL? Since?

Ron.
Think of it more like a duty-free store. It'll be in the departures lounge, so it's not like you could just shop there everyday as an alternative to NLC.
Reply With Quote
     
     
  #1011  
Old Posted Sep 3, 2017, 8:20 PM
rthomasd rthomasd is offline
Registered User
 
Join Date: Mar 2012
Posts: 426
So, as it's now September and we have but 2 months left in the construction season, here's an update on TGH work this year.

No work north of Kenmount Rd.
Conduit work for street lighting proceeding, conduit in place from near-Kenmount to almost Redmond's Road, and then a little past Redmond's Rd, but not as far as Blackmarsh. Now that the two bypasses have been removed, they can finish the conduit install this year.

Bypasss at Old Pennywell Rd still in place, over/underpass still unfinished ( roadbed on Old Pennywell rd needs to be raised at least 3 Metres. Only work showing this year is a couple loads of boulders dumped at the east side of the under/overpass.

Bypass at Redmond's Rd removed a few days ago. Redmond's Rd is gravel and you now drive onto the concrete bridge-deck (which hasn't been paved). It's a rough road.


Blackmarsh Rd bypass removed this week, now drive onto the fully finished over/underpass which has a nice paved deck. The electrical conduit hasn't reached this area yet.


Sobey's Square area - they've piled up the material removed from the Blackmarsh Rd bypass along the west side of the off-ramp to Topsail Rd, presumably as a sound barrier.

The pedestrian underpass has been partially finished, see previous post. No sign of any work for the over/under pass needed for access to TGH from Topsail road.


Topsail Rd overpass work proceeding - north side pad almost complete, south side pad footing excavation started.


Anyone who thinks we'll be driving on any part of this road this year is dreaming.

Last edited by rthomasd; Sep 3, 2017 at 8:33 PM.
Reply With Quote
     
     
  #1012  
Old Posted Sep 3, 2017, 11:32 PM
Offshore1 Offshore1 is offline
Registered User
 
Join Date: Feb 2012
Location: NL
Posts: 209
This year? At this pace it'll be more like 2 more years before we're driving on any portion of the TGH currently "under construction".

The supposed plan to get construction going from the provincial government is obviously not working out. Nice theory - announce tenders in winter, award in spring, work go ahead in summer. The level of foot dragging between the government and then contractors here is off the charts. With our short construction season, a 3 month delay from the awarding of the tender and ANY visible work is unacceptable. Evidently in order to get anything done here a tender for construction needs to be sent out for bids in Sept. for any hope of actual progress in the next years construction season.

Since there's no chance of any paving this year perhaps the govt. will take the time to research the Federal government paving standards (think Terra Nova Park) and apply those to any work to proceed on the TGH. I'm no civil engineer, but there IS a difference. At least it'll last then - unlike other provincial highways. Sorry for long post - had to vent!
Reply With Quote
     
     
  #1013  
Old Posted Sep 4, 2017, 12:47 PM
jjavman jjavman is offline
Registered User
 
Join Date: Apr 2011
Location: NL
Posts: 456
Quote:

Anyone who thinks we'll be driving on any part of this road this year is
dreaming.
I'd say Mr. Hawkins knew full well no one would drive on it this year, but it was a great political sound bite!



EDIT: Maybe he meant we'd get to drive on the new Blackmarsh bridge ;-)
Reply With Quote
     
     
  #1014  
Old Posted Sep 8, 2017, 5:44 PM
J_Murphy's Avatar
J_Murphy J_Murphy is offline
Registered User
 
Join Date: Mar 2012
Location: St. John's, NL
Posts: 1,293
Pages 72-73 of next weeks council agenda give some insight to the future road alignment of Commonwealth and TGH. It's likely just conceptual at this point and probably not finalized.

http://www.stjohns.ca/sites/default/...%2C%202017.pdf

I'm going to guess that my 2 year old will have her license before this is done...
Reply With Quote
     
     
  #1015  
Old Posted Sep 8, 2017, 5:49 PM
colinpeddle colinpeddle is offline
Registered User
 
Join Date: Feb 2013
Posts: 134
Sucks for the people who own those two homes there. They've been in that area for a long, long time.
Reply With Quote
     
     
  #1016  
Old Posted Sep 8, 2017, 7:30 PM
rthomasd rthomasd is offline
Registered User
 
Join Date: Mar 2012
Posts: 426
Which two houses? The one in the middle with the double driveway has been torn down for some time, with only the driveways still there.
Reply With Quote
     
     
  #1017  
Old Posted Sep 8, 2017, 9:27 PM
colinpeddle colinpeddle is offline
Registered User
 
Join Date: Feb 2013
Posts: 134
Quote:
Originally Posted by rthomasd View Post
Which two houses? The one in the middle with the double driveway has been torn down for some time, with only the driveways still there.
Ahhh no idea. I haven't been in Mount Pearl for ages.
Reply With Quote
     
     
  #1018  
Old Posted Sep 15, 2017, 2:43 PM
jjavman jjavman is offline
Registered User
 
Join Date: Apr 2011
Location: NL
Posts: 456
Blackmarsh Roundabout?

Could this be roundabout work starting?






Last edited by jjavman; Oct 22, 2017 at 4:47 PM.
Reply With Quote
     
     
  #1019  
Old Posted Sep 24, 2017, 8:29 PM
rthomasd rthomasd is offline
Registered User
 
Join Date: Mar 2012
Posts: 426
Google Maps were upgraded today with VERY recent satellite images( Aug 14, 2017 ) - shows all the tower cranes in town and latest construction sites. Take a look at the Soldier's Pond electrical site, massive !

Last edited by rthomasd; Sep 24, 2017 at 9:18 PM.
Reply With Quote
     
     
  #1020  
Old Posted Sep 25, 2017, 12:22 AM
jjavman jjavman is offline
Registered User
 
Join Date: Apr 2011
Location: NL
Posts: 456
Quote:
Originally Posted by rthomasd View Post
Google Maps were upgraded today with VERY recent satellite images( Aug 14, 2017 ) - shows all the tower cranes in town and latest construction sites. Take a look at the Soldier's Pond electrical site, massive !
Looking now ...tks
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > St. John's
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 7:32 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.