Continuous row of trucks hauling dirt out of the pit already!


http://www.earthcam.net/projects/webcor/metropolis/
     
     
  #62  
Old Posted Jul 17, 2014, 11:36 PM
colemonkee's Avatar
colemonkee colemonkee is offline
Ridin' into the sunset
 
Join Date: Nov 2004
Location: Los Angeles
Posts: 9,093
Looking at the size of the total lot, it's pretty clear that the base of the taller Phase 1 tower (the 38 story one) will be in that cutout at the top left of the site, where the trucks are driving into the site.
__________________
"Then each time Fleetwood would be not so much overcome by remorse as bedazzled at having been shown the secret backlands of wealth, and how sooner or later it depended on some act of murder, seldom limited to once."

Against the Day, Thomas Pynchon
     
     
  #63  
Old Posted Jul 18, 2014, 12:46 AM
WonderlandPark's Avatar
WonderlandPark WonderlandPark is offline
Pacific Wonderland
 
Join Date: Mar 2006
Location: Bi-Situational, Portland & L.A.
Posts: 4,129
There is the shape for the first 2 towers emerging...cool. Can't wait to see them dig out the rest.
__________________
"The large print giveth and the small print taketh away"

travel, architecture & photos of the textured world at http://www.pixelmap.com
     
     
  #64  
Old Posted Jul 18, 2014, 3:26 AM
Jaycruz Jaycruz is offline
Registered User
 
Join Date: Jun 2014
Posts: 219
They are moving on this very very quickly. i'm impressed actually.
     
     
  #65  
Old Posted Jul 18, 2014, 4:26 AM
losangelesnative's Avatar
losangelesnative losangelesnative is offline
Registered User
 
Join Date: Oct 2013
Posts: 357
this is awesome and btw how many cranes do u guys anticipate seeing? im thinking one for each tower as well as one for the podium connecting the two, so maybe 3 cranes?
     
     
  #66  
Old Posted Jul 19, 2014, 9:18 PM
mdiederi's Avatar
mdiederi mdiederi is offline
4
 
Join Date: Sep 2006
Location: JT
Posts: 4,933
Yeah, looks like three tower cranes could handle the job in the first phase. Second phase looks like they might need at least four tower cranes, it's a much bigger area.

Nothing happening on the webcam today, they must have weekends off.
     
     
  #67  
Old Posted Jul 21, 2014, 6:38 AM
tyleraf's Avatar
tyleraf tyleraf is offline
Registered User
 
Join Date: May 2011
Location: Chicago
Posts: 566
It's exciting that Greenland is moving this along so quickly. I can't wait to see this area when this and Fig Central (hopefully) are complete.
     
     
  #68  
Old Posted Jul 21, 2014, 12:13 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694
Quote:
Originally Posted by tyleraf View Post
It's exciting that Greenland is moving this along so quickly.
The Chinese always impress me with the speed of projects from conception to reality. They build whole cities, literally, in a matter of a few years. When it comes to multiple tower developments, they are king.
     
     
  #69  
Old Posted Jul 21, 2014, 1:38 PM
Quixote's Avatar
Quixote Quixote is offline
Inveterate Angeleno
 
Join Date: Apr 2006
Location: Los Angeles
Posts: 7,474
I'm now Greenland's biggest fan. We finally get something, other than Wilshire Grand, that isn't cookie-cutter in design. This Gensler design isn't anything innovative (only a select few towers in a handful of cities qualify as such), but it's a far cry from the mediocre crap that is 888 Olive and all the other towers the Onni Group has planned for South Park. Those designs belong in Vancouver… in 2000.
__________________
“To tell a story is inescapably to take a moral stance.”

— Jerome Bruner
     
     
  #70  
Old Posted Jul 25, 2014, 3:57 AM
mdiederi's Avatar
mdiederi mdiederi is offline
4
 
Join Date: Sep 2006
Location: JT
Posts: 4,933
First time I've seen cement trucks on the site.


http://www.earthcam.net/projects/webcor/metropolis/
     
     
  #71  
Old Posted Jul 25, 2014, 12:58 PM
Quixote's Avatar
Quixote Quixote is offline
Inveterate Angeleno
 
Join Date: Apr 2006
Location: Los Angeles
Posts: 7,474
This baby will be above ground before we know it.
__________________
“To tell a story is inescapably to take a moral stance.”

— Jerome Bruner
     
     
  #72  
Old Posted Jul 29, 2014, 11:17 PM
mdiederi's Avatar
mdiederi mdiederi is offline
4
 
Join Date: Sep 2006
Location: JT
Posts: 4,933
     
     
  #73  
Old Posted Jul 30, 2014, 4:01 AM
Valyrian Steel's Avatar
Valyrian Steel Valyrian Steel is offline
:o
 
Join Date: Mar 2012
Location: SoCal
Posts: 966
Anyone know how deep they're going to dig?
     
     
  #74  
Old Posted Jul 30, 2014, 4:44 PM
colemonkee's Avatar
colemonkee colemonkee is offline
Ridin' into the sunset
 
Join Date: Nov 2004
Location: Los Angeles
Posts: 9,093
I wouldn't think too far. The shoring piles were only 20 feet long, and they're sticking a foot or two out of the ground. Most of the parking - if not all - is planned above ground in the podium - so I wouldn't think they would go more than 1 level - possibly 2 - down.
__________________
"Then each time Fleetwood would be not so much overcome by remorse as bedazzled at having been shown the secret backlands of wealth, and how sooner or later it depended on some act of murder, seldom limited to once."

Against the Day, Thomas Pynchon
     
     
  #75  
Old Posted Jul 30, 2014, 9:13 PM
caligrad's Avatar
caligrad caligrad is offline
Registered User
 
Join Date: Nov 2013
Location: Long Beach
Posts: 1,736
^^^ When you look at the detailed plans submitted to the city. The plans call for 2 below ground parking levels and 5 above ground parking levels masked with retail and residential units. Hard to tell if they have already dug down 2 levels already.
     
     
  #76  
Old Posted Aug 5, 2014, 11:44 PM
Jaycruz Jaycruz is offline
Registered User
 
Join Date: Jun 2014
Posts: 219
^^ Looks like they have dug down 1 parking floors.... the latest pictures show them doing something on the corner of Francisco and 9th. anyone know whats going on there?
     
     
  #77  
Old Posted Aug 6, 2014, 12:10 AM
colemonkee's Avatar
colemonkee colemonkee is offline
Ridin' into the sunset
 
Join Date: Nov 2004
Location: Los Angeles
Posts: 9,093
No way they are down two levels yet. 2 levels is at least 20 feet, if not more to allow for the mat foundation. Based on the height of the guys in the web cam today, they're only 10-11 feet down. The activity on the corner of 9th and Francisco appears to be cementing the wooden shoring beams into place between the steel piles.
__________________
"Then each time Fleetwood would be not so much overcome by remorse as bedazzled at having been shown the secret backlands of wealth, and how sooner or later it depended on some act of murder, seldom limited to once."

Against the Day, Thomas Pynchon
     
     
  #78  
Old Posted Aug 8, 2014, 3:05 PM
mdiederi's Avatar
mdiederi mdiederi is offline
4
 
Join Date: Sep 2006
Location: JT
Posts: 4,933
Yeah, they've started digging deeper.
     
     
  #79  
Old Posted Aug 8, 2014, 5:59 PM
black_crow's Avatar
black_crow black_crow is offline
Registered User
 
Join Date: Feb 2014
Location: Los Angeles
Posts: 568
Quote:
Originally Posted by colemonkee View Post
No way they are down two levels yet. 2 levels is at least 20 feet, if not more to allow for the mat foundation. Based on the height of the guys in the web cam today, they're only 10-11 feet down. The activity on the corner of 9th and Francisco appears to be cementing the wooden shoring beams into place between the steel piles.
No, that are at least 20 feet.

Based on the height of the guys in the web cam, they are more than 20 feet down.
     
     
  #80  
Old Posted Aug 9, 2014, 1:10 AM
SD_Phil's Avatar
SD_Phil SD_Phil is offline
Heavy User
 
Join Date: Apr 2005
Location: CA
Posts: 2,720
I'm ecstatic to eat crow on my predictions for this project. This might be the most optimistic I have felt about LA in at least 20 years.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 2:47 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.