HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver


Reply

 
Thread Tools Display Modes
     
     
  #2001  
Old Posted Mar 15, 2024, 11:40 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,350
Reply With Quote
     
     
  #2002  
Old Posted Mar 15, 2024, 11:55 PM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Location: Vancouver
Posts: 2,681
^Note that building section is from the older design before it lost a floor.

Also,

Quote:
Jasmine Bradley, a spokesperson for the Vancouver Art Gallery, told Daily Hive Urbanized today the entire construction project is expected to take about 48 months, which would peg the new building’s completion and opening sometime in 2028.

The entire project carries a $400 million budget, including $350 million for the actual project of designing, planning, and constructing the new building and $50 million for an operational endowment upon opening.

Bradley says the VAG has now raised over $352 million — up from $345 million at the time of the September 2023 ceremonial groundbreaking. This means the VAG has fully covered its new building costs, with efforts now focused on reaching the endowment target.
https://dailyhive.com/vancouver/vanc...s-new-building
Reply With Quote
     
     
  #2003  
Old Posted Mar 16, 2024, 2:59 AM
osirisboy's Avatar
osirisboy osirisboy is offline
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,065
Why is a daycare being built as part of it?

Last edited by osirisboy; Mar 16, 2024 at 4:06 AM.
Reply With Quote
     
     
  #2004  
Old Posted Mar 18, 2024, 9:34 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 9,577
Quote:
Ledcor is the general on the project. The first step is to demolish an existing structure and parking garage and then remediate the site. Over the first few months of work, construction crews will be digging down a level to remove contaminated soil and a retaining wall.

The above-ground work will involve cranes and heavy equipment and will likely start in spring of 2025.

“Construction is supposed to be 48 months from March 5 and then probably a six-month moving process,” says Kiendl. “We’re currently looking at the fall of 2028.”
Quote:
The estimated cost of the project is expected to be released in June
https://canada.constructconnect.com/...ing-techniques
Reply With Quote
     
     
  #2005  
Old Posted Mar 21, 2024, 9:23 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 9,577
Seems like they are at or below grade on the Beatty side of the site.

https://trafficcams.vancouver.ca/beattyGeorgia.htm
Reply With Quote
     
     
  #2006  
Old Posted Mar 26, 2024, 11:57 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 9,577
They're removing the modular housing and storing them down near Boundary Road.

Quote:
Southwest on Cambie Street to W Georgia Street
Left onto W Georgia Street
Southeast on Georgia Street
East on Georgia Viaduct/Prior St and Venables to Clark Drive
Right onto Clark Drive
South on Clark drive to E Broadway
Left on E Broadway
East on E Broadway to Nanaimo Street
Right on Nanaimo Street
South on Nanaimo Street to Grandview Highway
Left on Grandview Highway
East on Grandview Highway to Boundary Road
Right on Boundary Road
South on Boundary Road to destination at 3521 East Kent Ave.
https://plposweb.vancouver.ca/Public...ctId=228491267
Reply With Quote
     
     
  #2007  
Old Posted Mar 27, 2024, 7:29 PM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Location: Vancouver
Posts: 2,681
^Mobile crane is on site set up between the TBH buildings.

Last edited by madog222; Mar 27, 2024 at 7:48 PM.
Reply With Quote
     
     
  #2008  
Old Posted Mar 27, 2024, 8:00 PM
Vin Vin is offline
Registered User
 
Join Date: Sep 2013
Posts: 8,279
Glad this is finally happening. Not so fond of the architecture considering the cost of building it, but certainly a yay for culture.
Reply With Quote
     
     
  #2009  
Old Posted Mar 28, 2024, 5:57 AM
jrdtown jrdtown is offline
Registered User
 
Join Date: Feb 2024
Posts: 10
Quote:
Originally Posted by madog222 View Post
^Mobile crane is on site set up between the TBH buildings.
Today morning, my photo
Reply With Quote
     
     
  #2010  
Old Posted Apr 12, 2024, 3:42 PM
jrdtown jrdtown is offline
Registered User
 
Join Date: Feb 2024
Posts: 10
April 4th, over 50% removed


April 9th, it's almost all gone
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 1:10 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.