The City Council approved 10 million for a 3 story 750 space parking deck
for the proposed Councill Court development downtown. This was the biggest
stumbling gblock in this project which appears to be removed and now can proceed. Chapman Sisson Architects will design it, they have done a lot of the nearby Huntsville Hospital buildings.
Triad another developer on the site,( Big Spring Summit) plans to build a 75,000 sq ft building as well, a bank will occupy most of it. This is almost identical in size to the Summit building but depending on the footprint could be anywhere from 6-10 floors.
It will probably be 8. Don't want to get above the telephone poles.
Maybe a hotel will surprise us.