Old Posted Jan 29, 2012, 2:23 PM
micheal micheal is offline
Registered User
 
Join Date: Nov 2011
Posts: 415
I'm guessing they aren't going to proceed with the rest of the lights on ring road going east until the bypass and 4 interchanges r built. From the sound of it ( the bypass and interchanges) maybe getting built sooner than later.
i wonder if they will add lights between the lewvan and #1 interchange and the soon to be built pinkie road and #1 interchange? does anyone know?
Reply With Quote
     
     
  #202  
Old Posted Jan 29, 2012, 8:15 PM
SkydivePilot SkydivePilot is offline
Registered User
 
Join Date: Jun 2010
Location: REGINA
Posts: 2,295
Quote:
Originally Posted by micheal View Post
I'm guessing they aren't going to proceed with the rest of the lights on ring road going east until the bypass and 4 interchanges r built. From the sound of it ( the bypass and interchanges) maybe getting built sooner than later.
i wonder if they will add lights between the lewvan and #1 interchange and the soon to be built pinkie road and #1 interchange? does anyone know?
Not likely. (Due to the distance between the two interchanges.)
Reply With Quote
     
     
  #203  
Old Posted Apr 4, 2012, 5:52 PM
original original is offline
Registered User
 
Join Date: Sep 2011
Posts: 95
I recently drove down the Perimeter and finally got to see the redone Perimeter/Dugald Rd. intersection.

What was the point of having that detour to the side all those years if they were just going to do a normal at-grade intersection with a bunch of lights? I always thought that the main reason for the side detour was to put a interchange/overpass bridge over the CN line.

Anyone have any idea why they decided to do this? All the recent talk I've been hearing to make the 101 a true "freeway", and this just seems like a step backwards.

Reply With Quote
     
     
  #204  
Old Posted Apr 4, 2012, 10:36 PM
micheal micheal is offline
Registered User
 
Join Date: Nov 2011
Posts: 415
Does anyone know when the construction of the highway #1 and pinkie road interchange will begin?
Reply With Quote
     
     
  #205  
Old Posted Apr 4, 2012, 10:40 PM
sask1982's Avatar
sask1982 sask1982 is offline
Registered User
 
Join Date: Sep 2002
Location: Regina, Saskatchewan
Posts: 909
Quote:
Originally Posted by micheal View Post
Does anyone know when the construction of the highway #1 and pinkie road interchange will begin?
There was funds for 'continued construction of' the Pinkie/#1 interchange, so if it doesn't start this summer i would expect to see it continue in the fall. From what i've read, it will be the same design of the Lewvan/#1 interchange, so there shouldn't be too much design work needed (i would think).
Reply With Quote
     
     
  #206  
Old Posted Apr 5, 2012, 1:38 AM
VANRIDERFAN's Avatar
VANRIDERFAN VANRIDERFAN is offline
Registered User
 
Join Date: Jan 2007
Location: Regina
Posts: 5,149
Quote:
Originally Posted by sask1982 View Post
There was funds for 'continued construction of' the Pinkie/#1 interchange, so if it doesn't start this summer i would expect to see it continue in the fall. From what i've read, it will be the same design of the Lewvan/#1 interchange, so there shouldn't be too much design work needed (i would think).
I am sure they will start this spring, there has been a bunch of equipment sitting at the site all winter. With all the construction going on, no company can afford to have track hoes and trucks just sitting around.
Reply With Quote
     
     
  #207  
Old Posted Apr 5, 2012, 2:44 AM
armorand93's Avatar
armorand93 armorand93 is offline
Transit Nerd
 
Join Date: Nov 2010
Location: Calgary (former Winnipegger)
Posts: 2,707
Any Perimetre/CCW pics? Anyone?
Reply With Quote
     
     
  #208  
Old Posted Apr 5, 2012, 5:31 AM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Quote:
Originally Posted by micheal View Post
Does anyone know when the construction of the highway #1 and pinkie road interchange will begin?
My friend is the Project manager on the Regina West Bypass and he said that the dirt is currently settling, and in the summer the super structure should be started as well as the bridge over the CP rail lines. With completion mid-late 2013
Reply With Quote
     
     
  #209  
Old Posted Apr 5, 2012, 4:53 PM
jw6969 jw6969 is offline
Registered User
 
Join Date: Nov 2010
Posts: 241
Quote:
Originally Posted by North_Regina_Boy View Post
My friend is the Project manager on the Regina West Bypass and he said that the dirt is currently settling, and in the summer the super structure should be started as well as the bridge over the CP rail lines. With completion mid-late 2013
Awesome, I wonder how long it will take to update the maps. You will be able to go from McDonald street to Pinkie road with out any intersections or rail way crossings.
Reply With Quote
     
     
  #210  
Old Posted Apr 25, 2012, 11:44 PM
The Bess The Bess is offline
Registered User
 
Join Date: Apr 2008
Posts: 853
Quote:
Brutopian Brutopian is online now
Registered User

Join Date: Jan 2011
Posts: 112
South Circle Drive Bridge and Freeway
The camera server associated with the construction cameras at the South Circle Drive Bridge and Freeway has been upgraded allowing for real time viewing.

Check out the new camera feeds at:

www.circledrive.ca
Reply With Quote
Thought I would post this here
Reply With Quote
     
     
  #211  
Old Posted Apr 26, 2012, 6:01 AM
Spocket's Avatar
Spocket Spocket is offline
Back from the dead
 
Join Date: Feb 2006
Location: Edmonton
Posts: 3,504
Quote:
Originally Posted by original View Post
I recently drove down the Perimeter and finally got to see the redone Perimeter/Dugald Rd. intersection.

What was the point of having that detour to the side all those years if they were just going to do a normal at-grade intersection with a bunch of lights? I always thought that the main reason for the side detour was to put a interchange/overpass bridge over the CN line.

Anyone have any idea why they decided to do this? All the recent talk I've been hearing to make the 101 a true "freeway", and this just seems like a step backwards.

Funds , funds , funds .
The plans for upgrades were actually thought up prior to 1997 . As you know , in '97 we got a swimming lesson courtesy of nature so we got stuck with a $600 million bill to upgrade the floodway first .
__________________
Giving you a reason to drink and drive since 1975.
Reply With Quote
     
     
  #212  
Old Posted Apr 26, 2012, 1:56 PM
jmt18325's Avatar
jmt18325 jmt18325 is offline
Heart of the Continent
 
Join Date: Apr 2009
Location: Winnipeg
Posts: 7,284
The province told me in an email that they do have the goal of getting rid of all lights on 1, 75, and the perimeter, but in the short term, some additional lights will be necessary for safety reasons.
Reply With Quote
     
     
  #213  
Old Posted Apr 26, 2012, 3:32 PM
rrskylar's Avatar
rrskylar rrskylar is offline
BANNED
 
Join Date: Sep 2004
Location: WINNIPEG
Posts: 7,641
Quote:
Originally Posted by jmt18325 View Post
The province told me in an email that they do have the goal of getting rid of all lights on 1, 75, and the perimeter, but in the short term, some additional lights will be necessary for safety reasons.
LOL! they have a goal!!
Reply With Quote
     
     
  #214  
Old Posted May 13, 2012, 10:09 PM
SkydivePilot SkydivePilot is offline
Registered User
 
Join Date: Jun 2010
Location: REGINA
Posts: 2,295
Hey, have you guys seen the activity west of Regina (Hwy #1/Pinkie Rd.)? Lots of lights set up this spring! That will eventually be a massive interchange. (Due to the length of the trucks.)
Reply With Quote
     
     
  #215  
Old Posted May 13, 2012, 11:38 PM
Jets4Life Jets4Life is offline
BANNED
 
Join Date: Apr 2004
Location: True North
Posts: 1,913
Quote:
Originally Posted by jmt18325 View Post
The province told me in an email that they do have the goal of getting rid of all lights on 1, 75, and the perimeter, but in the short term, some additional lights will be necessary for safety reasons.
I cannot wait until this is completed, so my Great-Great-Great Grandchildren can enjoy it!
Reply With Quote
     
     
  #216  
Old Posted May 14, 2012, 12:56 AM
jmt18325's Avatar
jmt18325 jmt18325 is offline
Heart of the Continent
 
Join Date: Apr 2009
Location: Winnipeg
Posts: 7,284
There's some progress happening right now. The province is spending a great deal of money, but, there is also a great deal of catch up to do. Prior to 2006, Manitoba governments just weren't spending the necessary money.
Reply With Quote
     
     
  #217  
Old Posted May 14, 2012, 6:17 AM
roccerfeller's Avatar
roccerfeller roccerfeller is offline
Registered User
 
Join Date: Jul 2010
Location: BC
Posts: 2,918
Quote:
Originally Posted by Jets4Life View Post
I cannot wait until this is completed, so my Great-Great-Great Grandchildren can enjoy it!


internet gold
Reply With Quote
     
     
  #218  
Old Posted Aug 8, 2012, 8:30 PM
original original is offline
Registered User
 
Join Date: Sep 2011
Posts: 95
Anyone know notice how deteriorated the interchange at Main St. and the Perimeter is?

I saw a semi trying to merge off Main onto the Perimeter and there is absolutely no room for the side merging lane, it's more like a half lane. The semi almost ended up swiping a car that was trying to get onto the other side of the clover to get up onto Main St. Not to mention the concrete is crumbling off the bridge and it has steel reinforcements on the inside columns.

I'm guessing nothing is planned here for a long long time. Probably till it becomes overly deteriorated and there is an accident. Anyone know how old this interchange is? It's super small in comparison to the other interchanges at McPhilips and Brookside.
Reply With Quote
     
     
  #219  
Old Posted Aug 8, 2012, 8:36 PM
Techman224 Techman224 is offline
Registered User
 
Join Date: Aug 2011
Location: Winnipeg
Posts: 57
Quote:
Originally Posted by original View Post
Anyone know notice how deteriorated the interchange at Main St. and the Perimeter is?

I saw a semi trying to merge off Main onto the Perimeter and there is absolutely no room for the side merging lane, it's more like a half lane. The semi almost ended up swiping a car that was trying to get onto the other side of the clover to get up onto Main St. Not to mention the concrete is crumbling off the bridge and it has steel reinforcements on the inside columns.

I'm guessing nothing is planned here for a long long time. Probably till it becomes overly deteriorated and there is an accident. Anyone know how old this interchange is? It's super small in comparison to the other interchanges at McPhilips and Brookside.
It also has a height restriction on the Perimeter, with signs flashing if trucks are over-height. It needs to be rebuilt to fix this.
Reply With Quote
     
     
  #220  
Old Posted Aug 8, 2012, 8:53 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 3,979
Quote:
Originally Posted by original View Post
Anyone know notice how deteriorated the interchange at Main St. and the Perimeter is?

I saw a semi trying to merge off Main onto the Perimeter and there is absolutely no room for the side merging lane, it's more like a half lane. The semi almost ended up swiping a car that was trying to get onto the other side of the clover to get up onto Main St. Not to mention the concrete is crumbling off the bridge and it has steel reinforcements on the inside columns.

I'm guessing nothing is planned here for a long long time. Probably till it becomes overly deteriorated and there is an accident. Anyone know how old this interchange is? It's super small in comparison to the other interchanges at McPhilips and Brookside.
Would have been built some time in the early to mid 1960's as that was part of the original construction.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 8:41 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.