HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley


    Metrotower III in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Burnaby Skyscraper Diagram

Map Location

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #1  
Old Posted Feb 12, 2008, 6:17 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 12,631
[Burnaby] Metrotower III | 109m | 25fl | Completed

Well we might as well start a thread for this, with so much activity lately we don't want it clogging up the other threads.

Tender drawings have been sent out to the sub trades for final pricing, and demolition/excavation is set to begin late April, pending final approval from Ivanhoe/Cambridge. Construction is expected to last just under two years, and top out is expected in summer of 2010, with substantial completion late 2010 early 2011.

Metrotower III

- 5 levels of U/G parking
- 25 levels of office space
- 425 000 sq ft of office space
- aiming for Leed certified Gold status
- 356' 4" from F2 lobby to top of mechanical penthouse
- 374' 11" from ground level loading bay to top of mechanical penthouse







Earlier design without the curved glass
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 11:22 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.