Progress continuing on the underground parking level.
Reply With Quote
     
     
  #22  
Old Posted Jun 7, 2019, 9:26 PM
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,582
Excavation to the south of the building under construction is well underway. I don't recall off the top of my head without looking up this thread what the other buildings are on this site, but they are starting them anyway.
Reply With Quote
     
     
  #23  
Old Posted Jun 8, 2019, 7:27 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,855
They were still pouring concrete today for walls on underground parking level. Forming well underway to prepare for the ground level concrete pour.
Reply With Quote
     
     
  #24  
Old Posted Jun 16, 2019, 7:43 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,855
Some of the ground level concrete has now been poured. Excavation to the south continues.
Reply With Quote
     
     
  #25  
Old Posted Jun 23, 2019, 11:00 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,855
Wall forms now started for ground floor walls.
Reply With Quote
     
     
  #26  
Old Posted Jul 12, 2019, 11:47 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,855
Changes to the project - https://lfpress.com/news/local-news/...th-a-new-tower

Also they have most of the 1st floor walls poured now and even the 2nd fl slab on the first building.
Reply With Quote
     
     
  #27  
Old Posted Jul 17, 2019, 9:58 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,855
2nd floor wall pours happening today. Suspect it will be about 2 weeks per floor. 14 weeks from now should have the 7 floors done and work on the mechanical penthouse underway.
Reply With Quote
     
     
  #28  
Old Posted Jul 23, 2019, 11:05 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,855
7th floor approved and the townhouses removed from the project. L1 level foundation and walls started on the south building. 2nd floor walls continuing on the the north building.
Reply With Quote
     
     
  #29  
Old Posted Jul 28, 2019, 3:38 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,855
2nd tower crane now up for the south building.
Reply With Quote
     
     
  #30  
Old Posted Jul 30, 2019, 5:58 PM
GeneralLeeTPHLS's Avatar
GeneralLeeTPHLS GeneralLeeTPHLS is online now
Midtowner since 2K
 
Join Date: Aug 2015
Location: Midtown Toronto
Posts: 5,425
I took these on the 14th, good to see some growth and density in this part of town;
DSC_0676 by Draulerin Photographics, on Flickr
DSC_0671 by Draulerin Photographics, on Flickr
DSC_0668 by Draulerin Photographics, on Flickr
DSC_0663 by Draulerin Photographics, on Flickr
__________________
"Living life on the edge"
Reply With Quote
     
     
  #31  
Old Posted Aug 4, 2019, 3:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,855
Good progress on the 3rd floor walls on north building and L1 level foundation walls and posts on south building.
Reply With Quote
     
     
  #32  
Old Posted Aug 17, 2019, 6:35 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,855
4th floor walls now started on north building. L1 level walls and posts on south building progressing well.
Reply With Quote
     
     
  #33  
Old Posted Sep 1, 2019, 11:16 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,855
Some of the 5th floor walls now up.
Reply With Quote
     
     
  #34  
Old Posted Sep 9, 2019, 10:51 PM
paulab19 paulab19 is offline
Registered User
 
Join Date: Mar 2019
Posts: 7
I was trying to find more info on this project. I came across this article on Rise Real Estate who bought the development, which isn't great. Does anyone know how reputable Rise Real Estate is?

https://www.therecord.com/news-story...dent-building/
Reply With Quote
     
     
  #35  
Old Posted Sep 17, 2019, 11:47 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,855
Some of the 6th fl walls now up. Should have the 7th floor and mechanical penthouse finished by end of Oct.
Reply With Quote
     
     
  #36  
Old Posted Sep 21, 2019, 8:56 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,855
Already have some of the 7th fl walls up on north building. Some of the 1st floor walls now up on south building.
Reply With Quote
     
     
  #37  
Old Posted Oct 2, 2019, 9:54 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,855
Windows now started on 1st fl of north building.
Reply With Quote
     
     
  #38  
Old Posted Oct 6, 2019, 5:24 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,855
Some of 7th floor roof slabs now installed on north building. Windows now going into 2nd floor. More progress on the walls on 1st floor on south building.
Reply With Quote
     
     
  #39  
Old Posted Oct 13, 2019, 7:22 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,855
Now forming the mechanical penthouse on north building and windows now being installed on 3rd floor. Walls for 1st floor on south building continuing.

North building should be topped out within 2 weeks and concrete crew will likely join the south building crew. Progress should improve.
Reply With Quote
     
     
  #40  
Old Posted Oct 14, 2019, 12:24 AM
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 4,582
Is there a third building at the very south end of this property going up right now? Just happened to glance over and saw some construction right beside the last house before the construction site, didn't look like it was connected to the building beside the one that just reached its 7th floor.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 5:52 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.